Text
f
.
>
}
August 26, 1998
s
L
South Carolina Electric & Gas Company
ATTN: Mr. Gary J. Taylor
Vice President. Nuclear Operations
Virgil C. Summer Nuclear Station
.
P. 0. Box 88
Jenkinsville. SC -29065.
SUBJECT:
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP) (NRC
INSPECTION REPORT NO. 50-395/98-99)
.
!
Dear Mr. Taylor:
]
The NRC Systematic Assessment of Licensee Performance (SALP) has been
' completed for your V. C. Summer Nuclear Power Station for the period of
)
October 27, 1996, through July 25, 1998.
The results of the evaluation are
documented in the enclosed SALP report.
This report will.be discussed with
you at a public meeting to be held at the V. C. Summer site on September 11.
'1998, at 1:00 p.m.
The SALP process assesses licensee performance in four functional areas:
3
Plant Operations. Maintenance. Engineering, and Plant Support.
The level of
safety performance at V. C. Summer was determined to be superior in all SALP
functional' areas.
This high level of performance resulted from the strong
focus and teamwork of all those associated with the operation of the facility.
Senior managers set high standards of safety performance, were actively
involved in site activities, and made conservative decisions regarding
operation of the facility.
Self-assessment, quality verification, and
corrective action programs were effective in ensuring the high standards of
'
performance were met.
The challenges noted during the previous SALP period associated with the Plant
Support area were addressed.
Improvements were noted in the control of
j/
f
contaminated material and in the emergency preparedness program. Management
/
and staff attention to detail, especially following implementation of plant
'and procedure changes was a challenge this period.
As a result of your superior level of safety performance, your next SALP
period duration will' be 24 months. This is conditional upon continued
superior performance.
In addition your facility will receive an appropriate
level of reduced NRC inspection that is reflective of your performance.
Note
that inspection hours may already have been reduced in the areas that received
a Category 1 ratMg in earlier SALP cycles.
In accordance with Section 2.790 of the NRC's " Rules of Practice." a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
0FFICIAL COPY
j
9809090190 980826
ADOCK 05000395
.
G
'
-
_
__
_ . - - _ _ _ _ - . _ - - _ _ _ _ _ _ _ _ . - _ _ - _ _ _ _ _ - _ _ _ - _
_
_ _ _ _ _ _ _ _ _ - _ _ _
_ -___ _ ___ __________ _ _ __
_
___-__
__
_
.
.
SCE&G
2
Should you have any questions or comments. I would be pleased to discuss
them with you.
I look forward to discussing this assessment with you on
September 11. 1998.
Sincerely.
Orig signed by Luis A. Reyes
Luis A. Reyes
Regional Administrator
Docket No.: 50-395
License No.: NPF-12
Enclosure: V. C. Summer SALP Report
cc w/ encl.:
R. J. White
Nuclear Coordinator. Mail Code 802
S.C. Public Service Authority
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville..'SC 29065-
J. B. Knotts. Jr.. Esq.
Winston and Strawn
1400 L Street. NW
Washington. D. C.
20005-3502
Chairman
Fairfield County Council
P. O. Box 60
Winnsboro. SC 29180
Virgil R. Autry. Director
Radioactive Waste Management
Bureau of Solid and Hazardous
Waste Management
S. C. Department of Health
and Environmental Control
2600 Bull Street
Columbia. SC 29201
cc w/ encl. cont'd: See page 3
I
L________
_ _ _ _
..._&__
_ _ _ . _ _ . . _ _
_ _________-______
.,
,
SCE&G
3
cc w/ encl. cont'd:
R. M. Fowlkes. Manager
.
Operations
(Mail Code 303)
South Carolina Electric & Gas Company
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville, SC 29065
April Rice, Manager
Nuclear Licensing & Operating
Experience
(Mail Code 830)
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville. SC 29065
j
1
i
,
!
t
,
-
_ _ _
_ _ _ _ _ - _ _ -
_ _ _
_ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _
,
.
SCE&G
4
Distribut'on List w/ encl . :
Chairman Jackson
Commissioner Diaz
Commissioner McGaffigan
L. J. Callan. ED0
H. - L. Thompson, Jr. . DEDR
M. Tschiltz, Regional Coordinator.
S. Collins. NRR
A. Galante. CIO
J. Funches. CFO
B. Boger. NRR
F. Miraglia. NRR
W. Hehl, RI
G. Grant RIII
P. Gwynn RIV
M. Padovan. NRR
I
J. Lieberman OE
A. Hodgdon OGC
4
B. Keeling CPA/CA
{
D. Gamberoni. SALP Program Manager. NRR
1
K. Clark RII. PA0
!
R. Hannah. RII PA0
l
K. Landis DRS
i
T. Peebles. DRS
'
P. Fredrickson, DRS
K. Barr. DRS
G. Belisle. DRS
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1. Box 64
Jenkinsville. SC 29065
j
Federal Emergency Management Agency
ATTN:
Mr. William McSwain. Chief
Technical Hazards Branch
3003 Chamblee-Tucker Road
A )*
Chamblee. GA 30341
f
0FFICE
fil:DRP
Rll:DRP
RII:DRf
RII:DRS
HRR
SIMATLME
&
(@
ff
MQ
i
NAfE
LGerner
RNang
LPilado '
VMcCree
PKuo
DATE -
8/ 2 / /98
8/ Z.] /98
M /98
8/ L) /98
8/
/98
8/
/98
8/
/98
l'
0FFIMitECMD COPY
D012SEY NAfE: G:\\SLSI9899\\SALPRPT.DR4
GIPr?
/fEk ) MD
FES ) MD
f YESI
ND
YES
YES
YES
YES
IID
)
i
C __
.
_
. . _ _ . . .
J
. _ - _ _ -
.-
- _ ~ , -
asmsgam
e.m,m
.
,
SIGNAT
/
UKE
J~-
NAME
LGamer
RHaag
LPlisca
VMcCree
/ PKu6
DATE
8/
/98 8/
/98 8/
/98
8/
/98 8130/98 8/
/98
8/
COPY?
YES
YES
YES NO
YES NO * YE
O
YE5 NO
YE
l
NO
NO
OFFICIAL RECORD COPY
DOCUMENT NAME:
G:\\ sum 9899\\56LPRPT.DR3
4
I
I
J
i
l
l
.
l
TOTid. P.02
i