Requests Proposed Alternatives to Confirm That Listed Structures Free from Gross Erosion or Other Effects That Could Impair Structures Stability,Per NRC Category I SW Pond Dam Insp
ML20196G098
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/03/1998
From: Padovan L
NRC (Affiliation Not Assigned)
To: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 9812070245
Download: ML20196G098 (3)


Text

. . __ _ _ _ _ . _

December 3, 1998

- Mr. Gary J. Taylor Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Post Office Box 88 Jenkinsville, South Carolina 29065

SUBJECT:

SERVICE WATER POND DAM SAFETY INSPECTION - REQUEST FOR PROPOSED ALTERNATIVES FOR VIRGIL C. SUMMER NUCLEAR STATION

Dear Mr. Taylor:

On February 27,1997, the Nuclear Regulatory Commission conducted a Category 1 Service Water Pond (SWP) Dam inspection at the Virgil C. Summer Nuclear Station. On i August 28,1998, South Carolina Electric & Gas Company (SCE&G) responded to our dam I safety audit report. Yea responded positively to five audit items. However, you preferred not to conduct lead-line surveys on the discharge channel, or along the SWP pumphouse discharge pipe alignment. Please propose attematives to confirm that these structures are free from gross erosion or other effects that could impair their stability. For example, you might consider using a commercially available surface-operated depth finder, or other attemative, We realize that riprap surface edge irregularity, dredging, and other conditions will be reflected in any embankment measurement made below the water line.

Please respond in writing within 180 days of the date of this letter indicating what actions you intend to take regarding these improvements. I discussed this request with April Rice on November 25,1998, to establish this mutually agreeable target date. Please contact me at (301) 415-1423 if you need to revise the target date, or if you have any questions.

Sincerely, ORIGINAL SIGNED BY: i l L. Mark Padovan, Project Manager l Project Directorate 11-1 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation Docket No. 50-395 l

! cc: See next page Lb i

Distribution 070049 Docket File PD 11-2 RF DRom JZwolinski T PUBLIC JHolonich GBegchi Document Name - G >SUMMER /3879ttr.wpd 9ko T3 receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure *N" = No copy )

0FFICE PD11-2/PM A C) lC PD11-2/LA lC NMSS/DWM/ URB g D:PDIQ D l NAME MPadovan f'% EDunnington d@ Memo dated f MBeritow y DATE 12/ 2 /98 ,

12/ / /98 1M J^/ 9 /98 OfflCIAL RECORD COPY

~

9812070245 981203 PDR ADOCK 05000395 h ) 3

, . pe care n $4 UNITED STATES

[

p j

4 AUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-4001

% # December 3, 1998 Mr. Gary J. Taylor Vice President, Nuclear Operations South Carolina Electric & Gas Company '

Virgil C. Summer Nuclear Stction Post Office Box 88 Jenkinsville, South Carolina 29065

SUBJECT:

SERVICE WATER POND DAM SAFETY INSPECTION - REQUEST FOR PROPOSED ALTERNATIVES FOR VIRGIL C. SUMMER NUCLEAR STATION  !

Dear Mr. Taylor:

On February 27,1997, the Nuclear Regulatory Oommissio1 conrMcted a Category i Service Water Pond (SWP) Dam inspection at the Virgil C. Summer Nuclear Station. On August 28,1998, South Carolina Electric & Gas Company (SCE&G) responded to our dam safety audit report. You responded positively to five audit items. However, you preferred not to conduct lead-line surveys on the discharge channel, or along the SWP pumphouse discharge pipe alignment. Please propose attematives to confirm that these structures are free from gross erosion or other effects that could impair their stability. For example, you might consider using a commercially available surface-operated depth finder, or other attemative. We realize that riprap surface edge irregularity, dredging, and other conditions will be reflected in any embankment measurement made below the water line.

Please respond in writing within 180 days of the date of this letter indicating what actions you intend to take regarding these improvements. I discussed this request with April Rice on November 25,1998, to establish this mutually agreeable target date. Please contact me at (301) 415-1423 if you need to revise the target date, or if you have any questions.

Sincerely,

. a ch---

L. Mark Padovan, Project Manager Project Directorate ll-1 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-395 cc: See next page

.. . .. .- . . .=

Mr. Giry J. Teylor VIRGlL C. SUMMER NUCLEAR STATION South Carolina Electric & Gas Company cc:

Mr. R. J. White J. B. Knotts, Jr., Esquire Nuclear Coordinator Winston & Strawn Law Firm S.C. Dublic Service Authority . 1400 L Street, N.W.

clo Virgil C. Summer Nuclear Station Washington, D.C. 20005-3502 Post Office Box 88, Mail Code 802 Jenkinsville, South Carolina 29065 Resident inspector / Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Chairman, Fairfield County Council Drawer 60 l

Winnsboro, South Carolina 29180 i Mr. Virgil R. Autry, Director Division of Radioactive Waste Management Bureau of Land & Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Mr. Robert M. Fowlkes, Manager i Operations

. South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station, Mail Code 303 Post Office Box 88 Jenkinsville, South Carolina 29065 Ms. April R. Rice, Manager Nuclear Licensing & Operating Experience South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station, Mail Code 830 Post Office Box 88 Jenkinsville, South Carolina 29065