Rev 8 to Ort 72, Electrical Penetration Leak Test for Unit 1
ML20138K491
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/25/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
ORT-72, NUDOCS 9702180370
Download: ML20138K491 (3)


Text

"

' NUCLEAR POWER BUSINESS UNIT ORT 72 OPERATIONS REFUELING TESTS MINOR 3 Revision 8

' ELECTRICAL PENETRATION LEAK TEST January 25,1997

, UNIT 1 Date RECORD DSS raoCEouxE vEn:HED CURRENT AND CifECKED FOR TEMPORARY CilANGES IF FIELD CoPtEs REoutRED. USE PBF-0026s IAW NP 1.2 4 AND DO E COMPLETE Tills BLOCK.

BY: DATE:

1.0 PURPOSE The purpose of ORT 72 is to perform a refueling interval leak test the envelope for electrical penetrations E21 and E22 which are located in the El. 26' Pipeway No. 2, upper level.

2.0 BEFERENCES IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.

3.0 PRECAUTIONS AND LIMITATIONS 3.1 Penetration E21 and E22 may be ganged together for leak testing purposes.

3.2 All electrical penetrations must be leak tested with nitrogen.

4.0 INITIAL CONDITIONS i

Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test. l DSS Time Date 5.0 PROCEDURE l

NOTE: Thispenetration nugg be leak tested with nitrogen. \

l 5.1 Open the isolation valve downstream of pressure gauge for the penetration 1 to be tested and remove the test cap. l 1

5.2 Remove the pressure gauge and Whitey valve assembly.

9702180370 970210 Page1of3 CONTINUOUS USE PDR ADDCK 05000301 P PM .

' NUCLEAR POWER BUSINESS UNIT ORT 72 OPERATIONS REFUELING TESTS MINOR

, Revision 8 ELECTRICAL PENETRATION LEAK TEST January 25.1997

- ( . .. UNIT l INITIALS i

NOTE: Minimize the amount of time the leak rate tester is connected to the mechanicalpenetration.

5.3 Connect the test rig to the penetration test connection and test per 01-58.

5.4 Upon completion of the test, vent the penetration per 01-58.

5.5 Disconnect the test rig and replace the pressure gauge and Whitey valve assembly.

5.6 Repressurize the penetration to 15 psig. Close the isolation valve and replace the test cap.

PMT 4 5.7 Snoop disturbed fittings for leakage and tighten / initiate work order, as 4

required.

6.0 EVALUATION TO BE COMPLETED BY OPERATIONS MANAGER OR HIS REPRESENTATIVE. l 6.1 Individual leakages compared to allowable value and included in l tabulation of total leak rate l 6.2 Results acceptable,0.6 L, not exceeded.

Yes No (If no, give details in the Remarks section and notify the Regulatory Services manager to determine reportability.)

6.3 Data Analyzed By Date Remarks:

Page 2 of 3 CONTINUOUS USE

, 1

4

' NUCLEAR POWER BUSINESS UNIT ORT 72 I OPERATIONS REFUELING TESTS MINOR 3

Revision 8 4

ELECTRICAL PENETRATION LEAK TEST January 25,1997

' - UNIT 1 l

LEAK TEST DATA SHEET l Penetrations E21 and E22 l l

1 Pressure Leak Rate Time (psig) (sccm)

Test Instrument ID Range (Circle one): Low Mid High Comments:

Test Operator Date i

a Page 3 of 3 CONTINUOUS USE

,