Rev 28 to Pc 1,Part 2, Monthly Heating & Ventilation Sys Checks,Unit 1 Turbine Hall
ML20138K539
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/25/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
PC-1, NUDOCS 9702180410
Download: ML20138K539 (6)


Text

__ - _ _ _

~

NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 OPERATIONS PERIODIC CHECKS NWSR q Revision 28

' l MONTHLY HEATING AND VENTILATION January 25,1997 l

, SYSTEM CHECKS, UNIT 1 TURBINE HALL Date RECORD EO N N L N D) 3E B M W E BLOC Operations Manager l BY: DATE:

1.0 PURPOSE To check the condition of filters in the heating and ventilation systems for replacement or heating.

2.0 PRECAUTIONS AND LIMITATIONS Wear gloves while handling filters.

3.0 INITIAL CONDITIONS None NOTE 1: All)ilter material receivedfrom the storeroom must have a completed storeroom requisitionform, Form 1633.

NOTE 2: All disposablefilters are storedin the No. 2 warehouse-INITIALS 4.0 PROCEDURE 4.1 Check condition of the following disposable filters and replace as necessary:

4.1.1 Unit I rod control electrical equipment room supply (1W51, F97) l (24) 16 ' 20 ' 2 fiberglass filters (91l V95) 4.1.2 Operations office vent fan (W166, F24)

(2) 16 ' 25 ' 2 fiberglass filters (911-7687)

(2) 20 ' 20 ' 2 fiberglass filters (911-8152)

(3) 16

  • 20 ' 2 fiberglass filters (911-7695) 4.1.3 Auxiliary feed pump area (W-46, F-96) l (18) 16 x 20 x 2 fiberglass filters (911-7695) 4.1.4 Auxiliary feed pump area (W-46A, F-96A)

(6) 20 x 25 x 2 fiberglass filters (911-8489) '

(1) 16 x 25 x 2 fiberglass filters (911-7687)

'9702100410 970210 Page1of6 INFORMATION USE PDR ADOCK 05000266 - . .

P PDR

y r .w ._ --r +

,. NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 OPERATIONS PERIODIC CHECKS NNSR

e. Revision 28 J MONTHLY HEATING AND VENTILATION January 25,1997 {

, SYSTEM CHECKS. UNIT 1 TURBINE HALL INITIALS NOTE: Eveferredfens asfollows:

Even months W46 Oddmonths W46A

a. Request that Control Room switch operation of the W46/W46A aux feed pump area cooling fans.

Ensure standby selector switch is aligned to the standby fan and the preferred fan label is under the running fan.

4.1.5 Battery room supply duct (W-10A&B, F-94 A&B) l (2) 12 x 24 x 1 fiberglass filters (911-8039) 4.1.6 South gatehouse, east equipment roem door, air intake openings (W83, F105) l (2) 16 x 25 x 2 fiberglass filters (911-7687)

NOTE: Change bus ductfilters regardless of appearance during months ofMay through October.

4.1.7 Generator bus duct cooling unit (lW45A&B, IF-95) l (1) 16 ' 20 ' 2 (911-7695)

  • CAUTION
  • WORK ON ONLY ONE SUCTION GRILL AT A

. TIME. l r

4.1.8 Office area reprographics AC unit (W145, F109)in overhead above small copying machine.

l (2) 20'20'l fiberglass filter - suction grills (914-9899) l (1) 18'25'l fiberglass filter - inside W145 unit (914-9900)

Page 2 of 6 INFORMATION USE

, NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 i OPERATIONS PERIODIC CHECKS NNSR Revision 28 i

't MONTHLY HEATING AND VENTILATION January 25,1997 SYSTEM CHECKS. UNIT 1 TURBINE HALL INITIALS NOTE: Change glidepackfilters whenfilter D/P is 1.0 or greater.

4.1.9 Control room recire and supply (W-13B,1 & 2)(F-43)

(8) 24 X 24 X 2 roughing filter (911-8616) ,!

(4) 12 X 24 X 2 roughing filter (911-8624) l l

.(8) HP-200 high pressure glide pack filters / disposable media (911-9027)

(4) HP-200 high pressure glide pack filters / disposable media (911-9035) l PMT l Check glide pack filter D/P < l.0.

l l 4.1.10 Computer room fan (W-107A&B, F-107)

(6) 20 X 25 X 2 fiberglass filters (911-8489) l l

4.2 Check the following Roll-Kjeen filters. Advance until half of entire filter area is replaced with new media. If near run out, replace. Leave filter l

advance in oft l

NOTE: (911-8241, S' wide) (911-8233,4' wide) l l 4.2.1 F17, main office area (W17) (911 8133) l 4.2.2 F19, service building supply (W23) (911-8233) l 4.2.3 F42, cable spreading room supply (W13A,1 & 2) (911-8241) l Page 3 of 6 INFORMATION USE

i NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 OPERATIONS PERIODIC CHECKS NNSR Revision 28

'l MONTHLY HEATING AND VENTILATION January 25,1997

/ '.r SYSTEM CHECKS, UNIT 1 TURBINE HALL INITIALS NOTE: Ifreplacement HX-71 media required, measure old media so as to determine applicablelot number:

16 '20 '2 (911-8101) 20 *25 '2 (911-8110) l 4.3 Clean the following industrial heater washable filters and reinstall (February and August only):

4.3.I 1HX-71 A (El. 46')

4.3.2 1HX-71B (El. 46')

4.3.3 1HX-71C (El. 46')

4.3.4 1HX-71D (El. 26')

4.3.5 1HX-71G (El. 8')

4.3.6 1HX-71H (El. 8')

4.3.7 1HX-71J (El. 8')

4.3.8 1HX-71K (El. 8')

4.3.9 HX-65A (CST area) G-01 Room 4.3.10 HX-65B (CST area) G-02 Room 4.3.11 HX-78 (CST area) Air Compressor Room Quantity: 2 (Washable) l

.. I Page 4 of 6 INFORMATION USE

g NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 1 OPERATIONS PERIODIC CHECKS NNSR I j Revision 28

' J MONTHLY HEATING AND VENTILATION January 25,1997 ]

SYSTEM CHECKS, UNIT I TURBINE HALL INITIALS 4.4 Technical Support Center El.18.5' (At Grade) (W-93, F51) (Replace on '

even months)(9) 20x25x2 4.4.1 Use the provided long hook to remove filter and frame unit.

4.4.2 Use gloves when handling filter frames (sharp edges).

4.4.3 Ensure replacement pads are installed with coated sides towards outside air intake; the pad retainers should also be towards the outside, but bent to remain inside the frame of the filter.

4.5 C-207 INVERTER PANEL FILTERS IN AUXILIARY FEED PUMP ROOM AND 1HX-259 ION CHROMATOGRAPH A/C FILTER ACROSS FROM SECONDARY SAMPLE PANEL C-207/HX-259 4.5.1 Remove filter retainer and filter media (2 on C-207, I on HX-259). l I

4.5.2 Clean filter media with soap and water. /

4.5.3 Blow dry and apply a light coat of oil. (LPS-3 recommended) /

4.5.4 Replace filter media and retainer. /

4.6 HOT WATER CONVERTER PUMP AND MOTORS Type oflubricant required: Rykon Industrial No. 32 4.6.1 (P-83) Motor - Sealed bearings Pump - Check oil level cup on side of pump shaft sleeve bearing at one-half to three-quarters full. Add oil if necessary through fill cups to top of bearing.

4.6.2 (P-84) Motor - Sealed bearings Pump - Same as P83 pump Page 5 of 6 INFORMATION USE e ,

,, NUCLEAR POWER BUSINESS UNIT PC 1 PART 2 OPERATIONS PERIODIC CHECKS NNSR Revision 28 MONTHLY HEATINO AND VENTILATION January 25,1997

/t SYSTEM CHECKS, UNIT 1 TURBINE HALL INITIALS 4.7 F-167A,B,C; South Service building supply (W-29) 4.7.1 F-167A Prefilter (4) 24x24x12 (915-0167)

(4) 12x24x12 (915-3419)

Change filters during months of April and October regardless of as found condition.

4.7.2 F-167B Bag Filter (4) 2 m24x12 (914-0361)

(4) 12x24x12 (914-0379)

Change filters only during the month of October.

4.7.3 F-167C Charcoal Filter (4) 24x24x12 (915-3449)

(4) 12x24x12 (915-3512)

Change filters only during the month of October.

Remarks:

[

, - . l 1

1 I

. . Page 6 of 6 INFORMATION USE l j