ML20140J294

From kanterella
Revision as of 09:20, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Names of Persons Planning to Attend 860410 Working Level Meeting W/Bwr Project Directorate 2 Project Managers by 860404.Meeting Location Changed to Holiday Inn, Bethesda,Md
ML20140J294
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8604040297
Download: ML20140J294 (3)


Text

.

Docket No.: 50-325/324 DISTRIBUTION (DOCKET-FI M PDR/LPDR Mr. E. E. Utley N4R 2 51986 Gray File Senior Executive Vice President PD#2 PM's l Power Supply & Engineering & Construction SNorris i Carolina Pcwer & Light Company Phillips Bldg. Receptionist l P.O. Box 1551 l Raleigh, North Carolina 27602 l

Dear Mr. Utley:

l 1

In my letter of March 3,1986, I invited the participation of your licensing staff in a working level meeting on April 10, 1986. The purpose of this ,

meeting is to discuss issues of mutual interest with the Project Managers in I BWR Project Directorate #2 and representatives of other etilities. The i meeting has been scheduled ton begin at 8:30 a.m. 9 Pet: D 11A nf +ha oh4 W

- I anilainn, 7om ve rfel t- m; = ; , ether &,Mn* fond. By April 4, please provide l to your NRC Project Manager the names of those who will attend the meeting. l As you can see by the enclosed agenda, we are attempting to cover a number of l areas of interest; yet provide sufficient time for in-depth discussion and questions. I look forward to meeting with the representatives of your utility, and trust it will be a useful day.

I Sincerely, '

Orhinals!cne6Dy l

Da:delR.titu!'er I l

Daniel R. Muller, Director '

BWR Project Directorate #2 i Division of BWR Licensing

Enclosure:

Agenda , a h 4:

cc: w/ enclosure

  • See next page g/ pd DY W.

/

>M.

DBL:PD#2 DBL:PD#2 DBL 'l SN s VRc ney: csp DP 3/A's/86 3 /86 3/S 86 0604040297 86 j24 PDR ADOCK PDR P

Mr. E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 cc:

Richard E. Jones, Esquire Carolina Power & Light Company 336 Fayetteville Street Raleigh, North Carolina 27602 Thomas A. Baxter, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N. W.

Washington, D. C. 20036 Mr. Charles R. Dietz Plant General Manager Post Office Box 458 Southport, North Carolina 28461 Mr. Christopher Chappell, Chairman Board of Conmissioners Post Office Box 249 Bolivia, North Carolina 28422

~

Mrs. Chrys Baggett State Clearinghouse Budget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector U. S. Nuclear Regulatory Commission Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Regional Administrator, Region II U. S. Nuclear Regulatory Commission.

101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Resources Post Office Box 12200 Raleigh, North Carolina 27605

. - -g n -

e -- -

AGENDA l

April 10, 1986 Meeting With PD#2 Licensees Rocm P-118 - Phillips Building Bethesda, Maryland 8:30 INTRODUCTION

- Daniel R. Muller, Director, BWR PD#2

- Robert M. Bernero, Director, DBL l

TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

- Pemanent Installation of Hydrogen Addition Systems (R. Hermann)

AUTOMATED TRACKING ,

l

- Tracking Systems systems in use by(NRC used by Utilities (G. Gears)

Utility participants) 1 Benefits of NRC/ Utility compatible system (G. Gears) l BREAK LEGAL CONSIDERATIONS l

Sholly process (J. Scinto) <

- New exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron) '

Interpretation of 10 CFR 50.59 (J. Scinto) 12:30 LUNCH 2:00 INTEGRATED SCHEDULES i Introduction / Background (M.Thadani)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS

- Introduction / Background (G. Rivenbark)

- - TechSpecImprovementProgram(GeorgiaPower)

Emergency Tech Spec Requests (G. Rivenbark)

CONCLUDINGREMARKS(D.R. Muller) 5:00 CLOSE

-, v -

-r w *  % *e - - - w