ML20072C691

From kanterella
Revision as of 17:30, 22 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1982
ML20072C691
Person / Time
Site: Pilgrim
Issue date: 01/13/1983
From: Mathis C
BOSTON EDISON CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20072C694 List:
References
83-18, NUDOCS 8303080510
Download: ML20072C691 (1)


Text

f *

, 't .

""" Edison e==

PILGRIM NUCLEAR POWER STATION RFD No. I ROCKY HILL RoAo PLvuouTe M ASS ACHUSETTs 02360 January 13, 1983 CJ M ATHIS station uanActa BECo Ltr. #83- 18 PILGRIM STATION Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-293 License DPR-35

Subject:

December, 1982 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and Planning.

Respectfully submitted.

C. J. O this Station Manager Pilgrim Station

ep cc: Director Office of Inspection and Enforcement Office of Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Director of Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue Ling of Prussia, PA 19406 8303080510 R30113 PDR ADOCK 05000293 R PDR $g