ML20107G480

From kanterella
Revision as of 03:10, 11 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Independent Assessment Program:Design Change Tracking Group Data Base Review. Rept Provides Results of 840613-15 Review
ML20107G480
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/06/1984
From: Williams N
CYGNA ENERGY SERVICES
To: Burwell S, George J
NRC, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20107G483 List:
References
NUDOCS 8411080084
Download: ML20107G480 (2)


Text

uwNs 101 CaMornia Street. Suite 1000, San Francisco, CA 94111-5894 415!397-5600 November 6, 1984 83090.017 Mr. S. Burwell Licensing Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20084 Mr. J. B. George Project General Manager Texas Utilities Generating Company Highway FM 201 Glen Rose, Texas 76043

Subject:

DCTG Data Base Review Results Comanche Peak Steam Electric Station Independent Assessment Program - Phases 1 and 2 Texas Utilities Generating Company Job No. 83090-

Reference:

J. T. Merritt (lVGCO) to N. H. Williams (Cygna), " Design Change Tracking Group Data Base Review Questions," CPPA-40,387, dated August 10, 1984.

Gentlemen:

Cygna performed an unannounced review of the Design Change Tracking Group (DCTG) from 6/13/84 to 6/15/64.4 The results of this review are provided in the attached Cygna Report TR-83090-03, Rev. O, entitled "DCTG Data Base Review." As sunnarized in the Results section of the report, several discrepancies were observed. Based on the data base validation program that is still ongoing at CPSES and the nature of the discrepancies noted, Cygna finds that the DCTG data base is sufficiently accurate. In order for the conclusions to remain valid, TUGC0 should comply with the following recommendations:

1. DCTG should correct the discrepancies noted in the report.
2. TUGC0 should continue with and complete their program plan described in their August 10, 1984 letter from J. T. Merritt (lUGCO) to N. H.

Williams (Cygna).

Please contact the undersigned if you require additional information or wish to discuss the review.

Very truly yours, 00{ t' e:-Q o ec r $ki!a0k4MM A PDR cc: See Attachment

' [

San Francisco Boston San Diego Chicago Richland i j

s icss ZZ Mr. S. Burwell Mr. J. B. George N ovem ber 6,1984 Page1 Mrs. Juanita Ellis Dr. Kenneth A. McCollom President, C ASE Dean, Division of Engineering Architecture 1426 S. Polk and Technology D allas, Texas 75224 Oklahoma State University Stillwater, Oklahom a 74074 Nicholas S. R eynolds, Esq.

Bishop, Liberm an, Cook, Purcell & Reynolds Stuart A. Treby, Esq.

1200 Seventeenth Street, N.W. Office of the Executive Legal Director W ashington, D.C. 20036 U.S. Nuclear Regulatory Com mission 7735 Old Georgetown Road Robert Wooldridge, Esq. Bethesda, M aryland 20814 Worsham, Forsythe & Sampels 2001 Bryan Tower Mr. J. B. George Dallas, Texas 75201 Texas Utilities Generating Company Comanche Peak Steam Electric Station Mr. Homer C. Schmidt Highway FM 201 M anager - N uclear Services Glen Rose, Texas 76043 Texas Utilities Generating Company 2001 Bryan Tower - Mr. D avid H. W ade Dallas, Texas 75201 Texas Utilities Generating Company 400 North Olive Street, L.B. 81 Peter B. Bloch, Esq. Dallas, Texas 75201 Chairman, Atomic Safety and Licensing Board Mr. David R. Pigott U.S. N uclear Regulatory Com mission Orrick, Herrington, & Sutcliffe 4350 East West Highway,4th Floor 600 Montgomery Street Washington, D.C. 20814 San Francisco, C altfornia 94111 Dr. W alter H. . lordan Ms. Ellen C. Ginsburg 881 W. Outer Drive Atomic Safety and Licensing Board 0ak Ridge, Tennessee 37830 4350 East West Highway Bethesda, M aryland 20814