Responds to 911118 Telcon Request for Util to Provide Milestone Schedule for Completion of Erds.Fts 2000 Lines Will Be Installed by Feb 1992 at Limerick Units 1 & 2 & by Mar 1992 for Peach Bottom Units 2 & 3
ML20086L283
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 12/06/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9112160119
Download: ML20086L283 (4)


Text

. _ - _ _ _ _ _ . __-_ _ _ _ .

. PHILADELPIIIA ELECTRIC COMPANY

^ NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK IllND.

WAYNE, PA 19087 5691 (215) 640-6000 NUCLEAR ENGINEERING & SERVICES DEPARTMENT December 6, 1991 Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPR-44 l DPR-56 NPF-39 NPF-85 l 1

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC- 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Schedule for Completion of the Emergency Response Data' System

REFERENCE:

Telecon dated November 18, 1991, between J. Shea (NRC), J. Jollicar (NRC), and T. R. Loomis (PECo), M. Oliveira (PECo)

Dear Cir:

This letter is in response to the referenced telecon in which it was requested that Philadelphia Electric Company (PECo) provide a milestone schedule for the completion of the Emergency Response Data System (ERDS). Attar hment 1 is the requested schedule. As discussed in the November 18, 1991 telecon, these milestone dates are tentative and may change depending on the completion of activities-by the Nuclear Regulatory Commission.

These activities include the installation of the FTS 2000 lines which are being installed by the NRC contractor Halliburton NUS.

Additional time may nlso be needed to design and install equipment-necessary to support the operation of the NRC equipment. Our current understanding is that the FTS 2000 lines will be installed by February 1992 for Limerick Generating Station, Units 1 and 2, and March 1992 for Peach Bottom Atomic Power Station, Units 2 and 3.

)

9112160119 911206 h Mp PDR ADOCK 05000277 -

r l F PDR (

,,, S-LU.S. Nuclear Regulatory Commission December 6, 1991 PBAPS, Units 2 and 3 Page 2

,- LdS, Units 1 and 2 If you have any questions, please do not hesitate to contact us.

Very truly yours,

/

/

G. J< Beck, Manager Licensing Section Attachment 1:c : T. T.-Martin, Administrator, Region I, USNRC ,

J. J. Lyash, USNRC Senior Resident Inspector, PBAPS a

(.

l-

cr

.- Attachment 1 i 4 Milestone Schedule for Completion of ERDS i-Item _ Due Date ERDS Point List 2/21/97 and Survey to NRC NRC Installation of FTS 2000 Phone Line ,

LGS 2/28/92 PBAPS 3/31/92 ERDS Testing LGS Final 3/27/92 PB Final 4/24/92 Completion of 6/1/92 Procedures i

. - - _ _ _ - . - - ...-- . -- . .~ .- - - - - _ . . _ , ~ .

~

t

, CHESTERBROOK (51B-1)

For the completion of the NRC ERDS rule requirements, the following. dates have been developed. Once a schedule is committed to, the scheduled activities will have to take place on or before'the commitment dates.

Item Due Date Responsible Area Corporate PBAPS LGS ERDS Point 1/3/92 C. Olenik/ F. Ginfrida List.& Survey R. Gallagher to NISD

.ERDS-Point 2/21/92 T. Loomis ----- -----

List & Survey-to NRC' NRC Installation-of FTS 2000 Phone Line LGS 2/28/92 M. Oliveira ----- -----

PBAPS 3/31/92 M. Oliveira ----- -----

ERDS Testing.

. LGS .2/28/92 M. Oliveira ----- -----

Preliminary LGS Final 3/27/92 M. Oliveira ----- -----

PB 3/20/92 M. Oliveira ----- -----

Preliminary PB Final 4/24/92 M. Oliveira ----- -----

NISD 6/1/92 -----

C. OlenJ' F. Ginfrida Implementing

& Surveillance Procedures EP 6/1/92 Gallagher Brown Administrative.

Procedures To meet.the first date to the NRC I will need the ERDS point list by'the end of the year (1/3/921 a:\peco\erds2. doc-

- - - . . -,