MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
.
4 OPERATING DATA REPORT DOCKET ND 50-413 DATE Aucust 15. 1995 P
QPEA_IINGSTATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 1
- 2. Reporting Period: July 1, 1995-July 31, 1995
- 3. Licensed Thersal Power (MWt): 3411
- 4. Naseplate Rating (6ross MWe): 13054 Notes eEaseplate Rating
- 5. Design Electrical Rating (Net MWe): !!45 (6 toss He) calculated as
- 6. Maxisus Dependable Capacity (Gross NWe): 1192 1450.000 MVA x .90 power
- 7. Marious Depeadable Capacity (Net MWe): !!29 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons:
- 9. Power level To Which Restricted, if Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cumulative
!!. Hours in Reporting Period 744.0 5087.0 88440.0
- 12. Nesber Of Hours Reactor Was Critical 744.0 4135.3 68646.9
- 13. F.eactor Reserve Shutdoun Hours - - --0--
- 14. Hours Generator On-Line 744.0 4040.2 67415.7
- 15. Unit Reserve Shutdown Hours --0-- --0-- --0--
- 16. Gross Thereal Energy Generated (MW10 2505168 13387526 219530957
- 17. Gross Electrical Energy Generated (MH) 8B8602 4766792 77450542
- 18. Net Flectrical Energy Senerated (MWH) 841539 4501864 72B25326
- 19. Unit Service Facter 100.0 79.4 76.2
- 20. Unit Availability Factor 100.0 79.4 76.2
- 21. Unit Capacity Factor (Using MDC Net) 100.2 78.4 72.7
- 22. Unit Capacity Factor (Using DER Net) 98.9 77.3 71.9
- 23. Unit forced Datage Rate 0.0 1.0 8.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut town At End Of Report Period. Estisated Cate of Startup:
- 26. Units in Test Status (Prior to Comeercial Operationh Forecast Achieved INITIAL CRITICALITY INiilAL ELECTRICITY COMMERCIAL OPERAT10N 9508230302 950815 PDR ADOCK 05000413 R PDR
y
',v- - -
..a vi .
t 41 l
I
, OPERATill6 B4TA REPORT-DOCKET 110- 50 413 iMIT Ca' " 1 l BATE Ausust 15. 1995 COMPLETED BY R.A._Ililliams TELEPHONE 704-M2-534 ,
I
~ MONTH Iulv.1995 El AVERASE DAILY PDilER LEVEL' M1 AVERA6E DAILY POWER LEVEL (Mile-Net) - (Mtie-Net) 1 1110 17 1134-
.2 1141 18 1132 3 1141 19 1134 -
4 1140 20 1133
-5 1137 21 1131 6- 1135 ' 22 1125~
'7-1139 23 1131 8 1142 24 11 2 9 1144 25 - 1133 10 ' 1139 26 ' l'128 11 ' 1136 27 1099 12 1137 28 1099 13 1138 29 1130 14- 1138 30 '1119 V: 15 1133 31 1124
^',
- 16 - !!M
,. 7 .
. 7. .
,,1,^ -.g-UNIT SHUTDOWNS-AND-POWER REDUCTIONS ' DOCKET ~NO. 50-413'
'- UNIT NAME t.aranna 1, .
DATE- uaf13fy3
' REPORT MONTH -July 1995 - COMPLETED BY- x. a. williams-TELEPHONE ( r us ) -a s 2.-dag e (1) (2) -(3) (4) (5) -
R- MET- "
E- HOD ' '
T A- OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE '
O P- DURATION- O DOWN . REPORT- TEM COMPONENT ACTION TO DATE' HOURS' N R/X- NO. CODE ' PREVENT-RECURRENCE.-
~
. E CODE -
'NO SHUTDOWNS OR REDUCTION S O-(1) ~ (2)- (3) (4)
F Forced Reason- -Method: Exhibit G - Instructions?
S Scheduled ~A-Ecuipment Failure (Explain) 1-Manual for Preparation of;Dstta
.B-Milntenance or test L2-Manual Scram Ent W Sneets For Licensee.
C-Refueling 3-Automatic Scram Event Report' (LER)
D-Regulatory Restriction 4-Other-(Explain) File ~(NUREG-0161)
E-Operator Training &' License Examination F-Administrative (5)
G-Operator Error ExhibitJI .Same Source H-Other (Explain) (Explain) }
rene___.m---____m-____m__._ _ _ _ _ _ _ __ _ _._.1.,nre-m_$
_._ _ _we _w . . - , , .-.w,
-u- .5 w -4 .w.h,,, -r --,.m - - , - - , .%w..4, w..cy, iv.w,...cm,y- , , .wu-,--,-- . . . ' , , , .w,
4 DOCKET: 50-413 ,
r-UNIT: Catawba 1 l Date: 08/15/95 NARRATIVE
SUMMARY
MONTH: July 1995 Catawba Unit I began the month of July operating at 100% full power. The unit operated at or near 100%
full p3wer for the entire month.
Prepared by: R. A. Williams
. - Telephone: (704)- 382-5346 h
W n
MONTHLY REFLJJ; LING INFORMATION REOUEST
- 1. Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: May 1996
. 3. Scheduled restart following refueling: September 1996 TIIE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
J If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (s) in the core: 123 (b) in the spent fuel pool: 1@
- 8. Present licensed fuel pool capacity: 1413 Size of requested or planned increase: ---
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
September 2002 DUKE POWER COMPANY DATE: Aucust 15.1995 Name of
Contact:
R. A. Willia _ms Phone: (704)- 382-5346 I
- m .
F s r '
I
!- I in OPERATING DATA REPORT i i
DOCKET NO- 50-414 _ j' DATE Annust 15. 1995 OPERATIN6 STATUS COlFLETED BY R.A. Willines TELEPHONE 704-382-5346 l
. 1. Unit Names Catawba 2 .
- 2. Reporting Period: July 1, 1995-July 31, 1995 .
- 3. Licensed Thereal Power (IIWti - 3411 i 4. Naseplate Rating (Gross lhie h 1305a Notes. eNameplate Rating 1
' 5. Design Electrical Rating (Net infel: !!45 (6ross INiel calculated as
- 6. Marleue Dependable Capacity (6 toss leie): 1192 1450.000 MVA x .90 power
. 7. Manteue Dependable Capacity (Net INiel !!29 .
factor.per Page 111,.. ,
8.'If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last pluRE64020. >
Report. Give Reasons
- 9. Power Level To Which Restricted, If Any (llet INie): l
- 10. Reason For Restrictions, If anyt j f
\
<l This Menth Yr.-to-Bate Coeulative
!!. Hours in Reporting Period 744.0 5087.0- 78456.'0
!!.'Nueber Of Hours Reactor lias Critical 744.0 4750.6 61759.9 j
'13. Reactor Reserve Shutdown Hours ~0- --0-- :--0-- j
- 14. Hours Generator On-Line 744.0 4709.4; 60770.9
- 13. Unit Reserve Shutdown Hours '+-
1
- 16. Gross Thersal Energy Benerated (ItiH) -'
2513929 15905030 195603913
- 17. Gross Electrical Energy Generated (MWHI -885368 5634259. 69333639
- 18. Net Electrical Energy Senerated (IHlHI 840577 5335151 65300704 19.UnitServicefactor 100.0 92.6- ' 77.5 -
20.UnitAvailabilityfactor ~100.0 92.6 77.5 21.' Unit Capacity Tactor (Using MDC Net) 100.1 92.9- 73.6 22.UnitCapacityFactor(UsingDERNet) 98.7 91.6 72.7 :!
- 23. Unit Forced Outage Rate 0.0 7.4 8.7 ,
.l
- 24. Shutdown Scheduled Over Next 6 Mocths (Type, Date, and Duration of Each): '1 Refueling - October 06. 1995 days
- 25. If Shut Down At End Of Report Period. Estiaated Bate of Startup:
- 26. Units in Test Status (Prior to Cosearcial Operation): Forecast . Achieved-INITIAL CRITICALITY INITIAL ELEClRICITY COMMERCIAL OPERATION
} % _,.
-~
tt Wppie . , - <, e w ,
yg n - .p .
4
~
Y.5 . , , s , .7 ,1 ,
~~:
.,I V '?
t f
,. yn,
>-?) t +s ,.
, . s.' *4 -
,r;;._ r If l
- ,1 . OPEMTING MTA REPORT g,
DOCKET NO 56-414-
, . UNIT Caw MTE ." i 15. IM5 jq COMPLETED BY R.A. Milliams- ,
- .
- , . TELEPHONE 704-3R2-53M
+
/ MONTH Julv.'1995 ,.
<1 lE, AVERASE MILY POWER LEVEL gg, AVERAGE MILY PONER LEVEL
, (MWe-Net) (MWe-Ilet!
'l" '1133 17 1130 2' 1135' 18 ~1129 f3- ,
1133' 19 1134 4~ 1132' 20 :-1129 5 1129 21 - 1128
~6 1127- 22 1130 1
?' 1113 23 If28 -
8 1100' ' 24 1127 ..
g 9! 1137 25 1128-
. 10 1133 26 1129
!! 1130 _. 27 1131
-12 1131 28 1131 15 ' 1132 29 1131 -
14~ 1133 30 1132
'? '
i , ~ [.15 1120 31 1131 16 1120 t,
k t
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME urawisa- z -
DATE ve/Ad/sd REPORT MONTH July 1995 COMPLETED BY x. a. Williams TELEPHONE ( e ve ) -J ez.-dse d (1) (2) (3) (4) (5)
R MET-E HOD -
T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event' Report ~(LER D-Regulaton Restriction 4-Other (Explain) File ~ (MEG-0161) )
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
.c
r, -s:--- -
9 - a::
k 4
i DOCKET: 50-414
' UNIT: Catawba 2 Date: 08/15/95 NARRATIVE
SUMMARY
MONTil: July 1995 Catawba Unit 2 began the month of July operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 :
I i
c a
F
. . , e c
MONTHL.Y REFUELING INFORMATION REOUESI
- 1. Facility name: Cttawha. Unit 2
- 2. Scheduled next refueling shutdown: October 1995
- 3. Scheduled restart following refueling: Novenber 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: Jy]
(b) in the spent fuel pool: 444
- 8. Present licensed fuel pool capacity: J_4_1J 4
Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
September 2Q11 DUKE POWER COMPANY DATE: Augu.si15.1995 Name of
Contact:
Rd. Williams Phone: (704)- 382-5346