Monthly Operating Repts for July 1995 for Catawba Nuclear Station
ML20087K454
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/31/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20087K253 List:
References
NUDOCS 9508230302
Download: ML20087K454 (10)


Text

.

4 OPERATING DATA REPORT DOCKET ND 50-413 DATE Aucust 15. 1995 P

QPEA_IINGSTATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Nase: Catawba 1
2. Reporting Period: July 1, 1995-July 31, 1995
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (6ross MWe): 13054 Notes eEaseplate Rating
5. Design Electrical Rating (Net MWe):  !!45 (6 toss He) calculated as
6. Maxisus Dependable Capacity (Gross NWe): 1192 1450.000 MVA x .90 power
7. Marious Depeadable Capacity (Net MWe):  !!29 factor per Page lii,
8. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

9. Power level To Which Restricted, if Any (Net MWe):
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cumulative

!!. Hours in Reporting Period 744.0 5087.0 88440.0

12. Nesber Of Hours Reactor Was Critical 744.0 4135.3 68646.9
13. F.eactor Reserve Shutdoun Hours - - --0--
14. Hours Generator On-Line 744.0 4040.2 67415.7
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thereal Energy Generated (MW10 2505168 13387526 219530957
17. Gross Electrical Energy Generated (MH) 8B8602 4766792 77450542
18. Net Flectrical Energy Senerated (MWH) 841539 4501864 72B25326
19. Unit Service Facter 100.0 79.4 76.2
20. Unit Availability Factor 100.0 79.4 76.2
21. Unit Capacity Factor (Using MDC Net) 100.2 78.4 72.7
22. Unit Capacity Factor (Using DER Net) 98.9 77.3 71.9
23. Unit forced Datage Rate 0.0 1.0 8.6
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut town At End Of Report Period. Estisated Cate of Startup:
26. Units in Test Status (Prior to Comeercial Operationh Forecast Achieved INITIAL CRITICALITY INiilAL ELECTRICITY COMMERCIAL OPERAT10N 9508230302 950815 PDR ADOCK 05000413 R PDR

y

',v- - -

..a vi .

t 41 l

I

, OPERATill6 B4TA REPORT-DOCKET 110- 50 413 iMIT Ca' " 1 l BATE Ausust 15. 1995 COMPLETED BY R.A._Ililliams TELEPHONE 704-M2-534 ,

I

~ MONTH Iulv.1995 El AVERASE DAILY PDilER LEVEL' M1 AVERA6E DAILY POWER LEVEL (Mile-Net) - (Mtie-Net) 1 1110 17 1134-

.2 1141 18 1132 3 1141 19 1134 -

4 1140 20 1133

-5 1137 21 1131 6- 1135 ' 22 1125~

'7-1139 23 1131 8 1142 24 11 2 9 1144 25 - 1133 10 ' 1139 26 ' l'128 11 ' 1136 27 1099 12 1137 28 1099 13 1138 29 1130 14- 1138 30 '1119 V: 15 1133 31 1124

^',

16 -  !!M

,. 7 .

. 7. .

,,1,^ -.g-UNIT SHUTDOWNS-AND-POWER REDUCTIONS ' DOCKET ~NO. 50-413'

'- UNIT NAME t.aranna 1, .

DATE- uaf13fy3

' REPORT MONTH -July 1995 - COMPLETED BY- x. a. williams-TELEPHONE ( r us ) -a s 2.-dag e (1) (2) -(3) (4) (5) -

R- MET- "

E- HOD ' '

T A- OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE '

O P- DURATION- O DOWN . REPORT- TEM COMPONENT ACTION TO DATE' HOURS' N R/X- NO. CODE ' PREVENT-RECURRENCE.-

~

. E CODE -

'NO SHUTDOWNS OR REDUCTION S O-(1) ~ (2)- (3) (4)

F Forced Reason- -Method: Exhibit G - Instructions?

S Scheduled ~A-Ecuipment Failure (Explain) 1-Manual for Preparation of;Dstta

.B-Milntenance or test L2-Manual Scram Ent W Sneets For Licensee.

C-Refueling 3-Automatic Scram Event Report' (LER)

D-Regulatory Restriction 4-Other-(Explain) File ~(NUREG-0161)

E-Operator Training &' License Examination F-Administrative (5)

G-Operator Error ExhibitJI .Same Source H-Other (Explain) (Explain) }

rene___.m---____m-____m__._ _ _ _ _ _ _ __ _ _._.1.,nre-m_$

_._ _ _we _w . . - , , .-.w,

-u- .5 w -4 .w.h,,, -r --,.m - - , - - , .%w..4, w..cy, iv.w,...cm,y- , , .wu-,--,-- . . . ' , , , .w,

4 DOCKET: 50-413 ,

r-UNIT: Catawba 1 l Date: 08/15/95 NARRATIVE

SUMMARY

MONTH: July 1995 Catawba Unit I began the month of July operating at 100% full power. The unit operated at or near 100%

full p3wer for the entire month.

Prepared by: R. A. Williams

. - Telephone: (704)- 382-5346 h

W n

MONTHLY REFLJJ; LING INFORMATION REOUEST

1. Facility name: Catawba. Unit 1
2. Scheduled next refueling shutdown: May 1996

. 3. Scheduled restart following refueling: September 1996 TIIE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

J If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (s) in the core: 123 (b) in the spent fuel pool: 1@
8. Present licensed fuel pool capacity: 1413 Size of requested or planned increase: ---
9. Projected date oflast refueling which can be accommodated by present license capacity:

September 2002 DUKE POWER COMPANY DATE: Aucust 15.1995 Name of

Contact:

R. A. Willia _ms Phone: (704)- 382-5346 I

- m .

F s r '

I

!- I in OPERATING DATA REPORT i i

DOCKET NO- 50-414 _ j' DATE Annust 15. 1995 OPERATIN6 STATUS COlFLETED BY R.A. Willines TELEPHONE 704-382-5346 l

. 1. Unit Names Catawba 2 .

2. Reporting Period: July 1, 1995-July 31, 1995 .
3. Licensed Thereal Power (IIWti - 3411 i 4. Naseplate Rating (Gross lhie h 1305a Notes. eNameplate Rating 1

' 5. Design Electrical Rating (Net infel:  !!45 (6ross INiel calculated as

6. Marleue Dependable Capacity (6 toss leie): 1192 1450.000 MVA x .90 power

. 7. Manteue Dependable Capacity (Net INiel  !!29 .

factor.per Page 111,.. ,

8.'If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last pluRE64020. >

Report. Give Reasons

9. Power Level To Which Restricted, If Any (llet INie): l
10. Reason For Restrictions, If anyt j f

\

<l This Menth Yr.-to-Bate Coeulative

!!. Hours in Reporting Period 744.0 5087.0- 78456.'0

!!.'Nueber Of Hours Reactor lias Critical 744.0 4750.6 61759.9 j

'13. Reactor Reserve Shutdown Hours ~0- --0--  :--0-- j

14. Hours Generator On-Line 744.0 4709.4; 60770.9
13. Unit Reserve Shutdown Hours '+-

1

16. Gross Thersal Energy Benerated (ItiH) -'

2513929 15905030 195603913

17. Gross Electrical Energy Generated (MWHI -885368 5634259. 69333639
18. Net Electrical Energy Senerated (IHlHI 840577 5335151 65300704 19.UnitServicefactor 100.0 92.6- ' 77.5 -

20.UnitAvailabilityfactor ~100.0 92.6 77.5 21.' Unit Capacity Tactor (Using MDC Net) 100.1 92.9- 73.6 22.UnitCapacityFactor(UsingDERNet) 98.7 91.6 72.7  :!

23. Unit Forced Outage Rate 0.0 7.4 8.7 ,

.l

24. Shutdown Scheduled Over Next 6 Mocths (Type, Date, and Duration of Each): '1 Refueling - October 06. 1995 days
25. If Shut Down At End Of Report Period. Estiaated Bate of Startup:
26. Units in Test Status (Prior to Cosearcial Operation): Forecast . Achieved-INITIAL CRITICALITY INITIAL ELEClRICITY COMMERCIAL OPERATION

} % _,.

-~

tt Wppie . , - <, e w ,

yg n - .p .

4

~

Y.5 . , , s , .7 ,1 ,

~~:

.,I V '?

t f

,. yn,

>-?) t +s ,.

, . s.' *4 -

,r;;._ r If l

,1 . OPEMTING MTA REPORT g,

DOCKET NO 56-414-

, . UNIT Caw MTE ." i 15. IM5 jq COMPLETED BY R.A. Milliams- ,

.
, . TELEPHONE 704-3R2-53M

+

/ MONTH Julv.'1995 ,.

<1 lE, AVERASE MILY POWER LEVEL gg, AVERAGE MILY PONER LEVEL

, (MWe-Net) (MWe-Ilet!

'l" '1133 17 1130 2' 1135' 18 ~1129 f3- ,

1133' 19 1134 4~ 1132' 20  :-1129 5 1129 21 - 1128

~6 1127- 22 1130 1

?' 1113 23 If28 -

8 1100' ' 24 1127 ..

g 9! 1137 25 1128-

. 10 1133 26 1129

!! 1130 _. 27 1131

-12 1131 28 1131 15 ' 1132 29 1131 -

14~ 1133 30 1132

'? '

i , ~ [.15 1120 31 1131 16 1120 t,

k t

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME urawisa- z -

DATE ve/Ad/sd REPORT MONTH July 1995 COMPLETED BY x. a. Williams TELEPHONE ( e ve ) -J ez.-dse d (1) (2) (3) (4) (5)

R MET-E HOD -

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event' Report ~(LER D-Regulaton Restriction 4-Other (Explain) File ~ (MEG-0161) )

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

.c

r, -s:--- -

9 - a::

k 4

i DOCKET: 50-414

' UNIT: Catawba 2 Date: 08/15/95 NARRATIVE

SUMMARY

MONTil: July 1995 Catawba Unit 2 began the month of July operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

i Prepared by: R. A. Williams Telephone: (704)- 382-5346  :

I i

c a

F

. . , e c

MONTHL.Y REFUELING INFORMATION REOUESI

1. Facility name: Cttawha. Unit 2
2. Scheduled next refueling shutdown: October 1995
3. Scheduled restart following refueling: Novenber 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: Jy]

(b) in the spent fuel pool: 444

8. Present licensed fuel pool capacity: J_4_1J 4

Size of requested or planned increase: =

9. Projected date of last refueling which can be accommodated by present license capacity:

September 2Q11 DUKE POWER COMPANY DATE: Augu.si15.1995 Name of

Contact:

Rd. Williams Phone: (704)- 382-5346