ML023240313
ML023240313 | |
Person / Time | |
---|---|
Site: | Mcguire, Indian Point, Catawba, Harris, Ginna, McGuire |
Issue date: | 11/22/2002 |
From: | Nuclear Energy Institute |
To: | Office of Nuclear Reactor Regulation |
Subbaratnam R, NRR/DLPM, 415-1478 | |
References | |
Download: ML023240313 (4) | |
Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A0702024-10-28028 October 2024
[Table view]Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 RA-24-0203, Regulatory Conference Supporting Information2024-07-31031 July 2024 Regulatory Conference Supporting Information ML24173A2132024-06-13013 June 2024 NRC Presentation; Indian Point Decommissioning Oversight Board, Dated June 13, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22336A0382022-12-0808 December 2022 Presentation Slides December 8, 2022, pre-submittal Meeting to Discuss Proposed License Amendment Request Regarding TS 3.7.11, Control Room Area Chilled Water System (Cracws) ML23031A2532022-12-0707 December 2022 NRC Presentation at New York State Decommissioning Oversight Board on December 7, 2022 in Cortlandt, New York (Dockets 50-003, 247, 286) ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21336A1422021-12-0707 December 2021 December 7, 2021, Pre-submittal Presentation Slides Regarding Embedded Flaw Repair Relief Request - Revised ML21327A2112021-11-23023 November 2021 December 7, 2021, Pre-submittal Presentation Regarding Embedded Flaw Repair Relief Request ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21217A1992021-08-18018 August 2021 Virtual Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 08/15/2021 PSDAR Public Webinar Meeting ML21207A0262021-07-29029 July 2021 Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 07/29/2021 PSDAR Public Meeting ML21214A1402021-07-29029 July 2021 Updated Indian Point Public Meeting Presentation Slides - Post Shutdown Decommissioning Activities Report, 07/29/2021 PSDAR Public Meeting ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21116A2542021-04-15015 April 2021 C2R24 Relief Request Pre-Submittal Slides Call 1 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML21036A0382021-02-0808 February 2021 Pre-submittal Meeting Presentation (02/08/2021) Relief Request No. IP3-ISI-RR-16 ML20269A1722020-09-30030 September 2020 Presentation Material for 9/30/2020 Pre-Submittal Meeting Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial Emergency Preparedness Evaluated Onsite Exercise Requirements ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20265A2902020-09-22022 September 2020 Annual Assessment Meeting - Quick Start Guide for Meeting Access ML20265A2842020-09-22022 September 2020 Annual Assessment Meeting - Webinar Presentation ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19289A0042019-10-17017 October 2019 Presentation Material for 10/17/19 Pre-Submittal Meeting Entergy to Holtec Proposed License Transfer Application 2024-07-31 Category:Meeting Summary MONTHYEARML24242A3242024-08-30030 August 2024
[Table view]Duke Energy Carolinas - Catawba 2A EDG Regulatory Conference Meeting Summary - August 7, 2024 ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24011A1652024-02-12012 February 2024 December 11, 2023, Summary of Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned Exemption Request Related to Turbine Control System and Reactor Protection System Circuitry ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23157A3202023-06-26026 June 2023 Summary of April 26, 2023, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant, Unit 1 Planned License Amendment Request Related to Turbine Control System and Reactor Protection System Circuitry ML23151A1232023-05-31031 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Shearon Harris Nuclear Plant ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22335A4012022-12-15015 December 2022 Summary of December 8, 2022, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Proposed License Amendment Request to Revise TS 3.7.11 Control Room Area Chilled Water System (Cracws) ML22309A0062022-12-12012 December 2022 Public Non-Sensitive Meeting Summary on Clarification Call with Holtec Regarding Request for Additional Information for Indian Point Unit 2 Master Decommissioning Trust Agreement as Per Indian Point Nuclear Generating Facility Unit 1 and 2 ML22340A6662022-12-0808 December 2022 Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22167A1852022-06-30030 June 2022 Summary of June 6, 2022, Meeting with Duke Energy to Discuss Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI) 191 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21342A0902021-12-14014 December 2021 Summary of December 7, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Reactor Vessel Closure Head Nozzle Repair for Catawba Nuclear Station, Unit 2 ML21342A1402021-12-0909 December 2021 Summary of Public Meeting in Tarrytown, Ny, to Discuss Indian Point Units 1, 2, and 3 (IPEC) Post-shutdown Decommissioning Activities Report ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21236A2832021-09-22022 September 2021 Summary of August 30, 2021, Public Meeting with Duke Energy Carolinas, LLC, Regarding Pre-Application Meeting to Discuss Moderator Temperature Coefficient Methodology Revision ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21172A2672021-08-13013 August 2021 Regulatory Audit Summary Related to the Review of LAR to Revise 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative Seis ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21133A0042021-05-26026 May 2021 Summary of Conference Call Regarding the Spring 2021 Steam Generator Tube Inspections (Epid: L-2021-Nfo-0004) ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21116A0662021-04-22022 April 2021 C2R24 Relief Request Pre-Submittal Slides Call 2 ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML21055A9122021-02-24024 February 2021 (E-mail Dated 2/24/2021) Summary of Feb 8, 2021, Pre-submittal Meeting for Relief Request No. IP3-ISI-RR-16, Code Case N-513-4 Periodic Inspection Frequency Extension ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20321A0002020-11-17017 November 2020 Summary of 9/30/20 Pre-Submittal Meeting with Entergy to Discuss Proposed One-Time Exemption Request - Biennial Emergency Preparedness Onsite Evaluated Exercise Requirements ML20289A7322020-10-15015 October 2020 2020 Annual Assessment Meeting for Indian Point - Meeting Summary ML20205L3712020-07-23023 July 2020 and R.E. Ginna Nuclear Power Plant Summary of Meeting ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML20083F5962020-03-23023 March 2020 Summary of Teleconference with the National Marine Fisheries Service for Indian Point Biological Opinion ML20077G9742020-03-18018 March 2020 R. E. Ginna Nuclear Power Plant - Summary of March 2, 2020, Meeting Regarding License Amendment Request to Support Shutdown of Reactor During Upcoming Refueling Outage ML20059P1292020-03-0303 March 2020 Summary of Partially Closed Pre-submittal Public Meeting with Entergy Nuclear Operations, Inc. to Discuss the Proposed License Amendment Request to Replace the Indian Point Unit No. 3 Crane with a New Holtec High-Lift Crane (EPID L:2019-LRM 2024-08-30 |
Text
I Industry Comments on NRC Program Plan I
Hemyc Users Group October, 2002 Topics
"*Introduction "aComments on Hemyc/MT tests
"*Comments on Rockbestos Firezone R tests NEIK Introduction
"*NRC identified issue with HemycIMT fire barrier material in July 2000
. Concern with qualification tests
"*Industry provided in letter April 2001 a summary of industry information related to
"*Testing protocols used
"*Tests conducted
"*Plant applications
"*Plant licensing basis Enclosure 2
Introduction
"*NRC decided to test this material
"*Industry appreciates the opportunity to comment on the test plan P
l5I~
I Areas for Comment - Hemyc
"*Licensing basis
" Merits of AN] testing methods and acceptance cnteria "aEvaluation of test results
"*Construction/test plan comments
'4E:I I
Areas for Comment - Hemyc Licensing basis
- Installed Hemyc configurations accepted by NRC
- GL 86-10 Supplement I intended for "future installations"
- Regulatory Guide 1.189 guidance not applicable unless committed to by licensees SN.E I
Areas for Comment - Hemyc a Merits of ANI testing methods and acceptance criteria
"*Replicate intent of original ANI test
"*Cable fill Fire test with cable in test configuration (e g, test air drops with cable)
"*Circuit continuity
- Functionality is a method ofdemonstrating acceptance NtI E S7 Areas for Comment - Hemyc a Evaluation of test results Provide guidance on applying test results to configurations not tested
- Include mathematical model to support this guidance
- Guidance %ill assist inspectors and licensees in addressing configurations not tested NJIK Areas for Comment - Hemyc n Construction/test plan comments
"*Allow industry comment on detailed construction/test plan
"*Allow industry observance of assembly and testing
"*Detailed comments to be submitted NE!-
Areas for Comment Rockbestos Cable wNeed to
"*State specific construction of cable
"*Assure test configurations representative of plant use State applicability of3-hour test to I-hour apphcations inplants
"*State acceptance criteria go !