MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24270A0042024-10-0202 October 2024 Fitpatrick Pre-submittal Meeting Slides, October 2, 2024 ML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24052A3902024-02-27027 February 2024 PSEG Presentation for Presubmittal Meeting Regarding Improved Technical Specifications Conversion on February 27, 2024 (Slides) ML24053A1282024-02-27027 February 2024 24 Month Fuel Cycle Pre-Submittal Meeting Presentation ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22222A1122022-08-0404 August 2022 NMP1 Torus Corrosion Presentation for August 2022 Final ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information ML22076A1942022-03-23023 March 2022 Constellation Presentation March 23, 2022 NRC Di_C Workshop ML22080A1522022-03-21021 March 2022 Non-Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML22010A0692022-01-10010 January 2022 Jan 11 2022 LGS Digital Modernization Pre-submittal Meeting Slides ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides 2024-08-20
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24302A2422024-10-29029 October 2024 ECCS Compensated Level System Replacement Project Pre-Submittal Meeting Slides ML24270A0042024-10-0202 October 2024 Fitpatrick Pre-submittal Meeting Slides, October 2, 2024 ML24249A3092024-09-0606 September 2024 September 6, 2024, Public Meeting Related to Digital Instrumentation and Control Amendment Slides ML24220A1002024-08-20020 August 2024 August 20, 2024, PSEG Pre-Planning Meeting Slides for Salem Stretch Power Uprate Project ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24052A3902024-02-27027 February 2024 PSEG Presentation for Presubmittal Meeting Regarding Improved Technical Specifications Conversion on February 27, 2024 (Slides) ML24053A1282024-02-27027 February 2024 24 Month Fuel Cycle Pre-Submittal Meeting Presentation ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23291A1392023-10-18018 October 2023 PSEG Presentation Slides for Pre Submittal Meeting on 10-24-2023 ML23271A1612023-09-28028 September 2023 PSEG Non-Proprietary Presentation for Pre-submittal Meeting on September 28, 2023 ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23144A0072023-05-24024 May 2023 PSEG Slides: NRC Pre-Submittal Meeting, May 25, 2023 ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23080A2972023-03-21021 March 2023 Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A2432022-11-17017 November 2022 Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22222A1122022-08-0404 August 2022 NMP1 Torus Corrosion Presentation for August 2022 Final ML22195A2172022-07-12012 July 2022 D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22153A3602022-06-0909 June 2022 Constellation'S Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project ML22187A0652022-06-0808 June 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides ML22132A0042022-05-26026 May 2022 PSEG Pre-submittal Meeting Slides - May 26, 2022 ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) 2024-09-06
[Table view] |
Text
2023 Annual Assessment Meeting
Region I King of Prussia, PA May22, 2024
1 Meeting Conduct
- All participants will be muted during presentations by NRC staff.
- The chat is enabled to allow you to ask questions during the meeting.
- We encourage mutual respect on the part of NRC staff and attendees.
2 How to Ask a Question
- Type in your question at any time using Microsoft Teams.
- or -
- You can wait until the question-and-answer session to ask your question orally.
3 Agenda
- Reactor Oversight Process (ROP)
- 2023 Safety Performance Overview
- FitzPatrick
- Ginna
- Nine Mile Point
- Beaver Valley
- Calvert Cliffs
- Hope Creek
- Salem
- Limerick
- Peach Bottom
- Susquehanna
- Question-and-Answer Session 4
Our Mission
To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.
5 Action Matrix Concept
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone
Increasing Safety Significance
Increasing NRC Inspection Efforts
Increasing NRC/Licensee Management Involvement
Increasing Regulatory Actions
6 Reactor Oversight Process
7 Types of Inspections
- Baseline Inspection Program
- Minimum level of inspection conducted at all facilities regardless of their performance.
- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.
- Supplemental Inspections (e.g., IP 95001)
- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.
8 Reactor Oversight Process
9 Facility Information Finder
- Additional Plant Information
- Safety Performance Summary
10 Projects Branch 1
Erin Carfang Branch Chief
Ginna FitzPatrick Nine Mile Point
11 R.E. Ginna Resident Inspectors
Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector
Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1
12 R.E. Ginna 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 4,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of inspectionand related activities
- Green Performance Indicators
13 James A. FitzPatrick Resident Inspectors
Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector
Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1
14 James A. FitzPatrick 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 6,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of inspection and related activities.
- Green Performance Indicators
15 Nine Mile Point Resident Inspectors
Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector
Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2
16 Nine Mile Point 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 9,100hours of inspection and related activities
- Green Performance Indicators
17 Projects Branch 2
Matt Young Branch Chief
Beaver Valley
18 Beaver Valley Resident Inspectors
Neil Day Alex Nugent Senior Resident Inspector Resident Inspector
Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2
19 Beaver Valley 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 5,700hours of inspection and related activities
- Green Performance Indicators
20 Projects Branch 3
Brice Bickett Branch Chief
Calvert Cliffs Hope Creek Salem
21 Calvert Cliffs Resident Inspectors
Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector
Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2
22 Calvert Cliffs 2023 Assessment Summary
- Operated safely and in a manner that preserved thepublic health and safety and protected theenvironment
- Unit 1 - Regulatory Response Column (Licensee Response Column as of March 21, 2024)
Unit 2-Licensee Response Column
- 8,200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of inspection and related activities
- Green Performance Indicators
- 10 Green & 1 White Findings
- 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response
Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance
- The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
- Supplemental Inspection (IP 95001) was recently completed, and the plant transitioned from the Regulatory Response to the Licensee Response Column effective March 21, 2024.
24 Hope Creek Resident Inspectors
Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1
25 Hope Creek 2023 Assessment Summary
- Operatedsafely and in a manner thatpreservedthepublic health and safety and protectedtheenvironment
- 4,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of inspection and related activities
- Green Performance Indicators
26 Salem Resident Inspectors
Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2
27 Salem 2023 Assessment Summary
- Operatedsafely and in a manner that preserved thepublic health and safety and protected theenvironment
- 6,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection andrelated activities
- Green Performance Indicators
28 Projects Branch 4
Jon Greives Branch Chief
Limerick Peach Bottom Susquehanna
29 Limerick Resident Inspectors
Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2
30 Limerick 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 5,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection and related activities
- Green Performance Indicators
31 Peach Bottom Resident Inspectors
Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector
Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3
32 Peach Bottom 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Unit 2 - Licensee Response Column(June 8, 2023)
Unit 3-Licensee Response Column
- 7,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of inspection and related activities.
- Green Performance Indicators
- 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone
Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.
34 Susquehanna Resident Inspectors
Jennifer England Erin Brady Senior Resident Inspector Resident Inspector
Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2
35 Susquehanna 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- 5,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> of inspection and related activities
- Green Performance Indicators
36 How to Ask a Question
- Type your question in the meeting chat
- Use the hand raise feature
- Phone only attendees will also be asked if they have any questions (*5 - hand raise,
37 NRC Social Media Channels
- Facebook www.facebook.com/nrcgov
- Twitter twitter.com/nrcgov
- YouTube www.youtube.com/user/NRCgov
- Instagram www.instagram.com/nrcgov
- Flickr www.flickr.com/photos/nrcgov/sets
- LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
- GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new
38 More Information
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html
- Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
39 Supplemental Meeting Feedback
We are looking for specific feedback on the format and content of this meeting
https://feedback.nrc.gov/pmfs/feedback/form?meetingcode=20240563