ML20004E914

From kanterella
Revision as of 15:19, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-019/03L-0
ML20004E914
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/15/1981
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20004E915 List:
References
MP-2-4810, NUDOCS 8106160143
Download: ML20004E914 (1)


Text

--

m.

/ *

} -

m o

M3ttTEttitui'i' UTEE.E'E'((59 P.O. BOX 270

' l,["*j',Z'f,C,,",['s.,,,,,,

j HARTF ORD. CONNECTICUT 06101

(' '#"

y l3  %,......:'.1,'l,',

.s u- ~"L , 1 June 15, 1981 MP-2-4810

~

4 Mr. Boyce H. Grier /

\#' -)

Director, Region i //>

Office of Inspection and Enforcement jC gjb C U.S. Nuclear Regulatory Commission 6 -4 631 Park Avenue (g-  %  ;

King of Prussia, Pennsylvania 19406 \$ a

~ ci, p. 4

Reference:

Facility Operating License No. DPR-65 '

Docket No. 50-336 / .' TTQg Reportable Occurrence R0-50-336/81-019/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 81-019/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY ST i E . Mroczka

! Stati n Superintendent l Millstone Nuclear Power Station

( EJM/JGR:bjo

Attachment:

LER 81-019/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, '

Washington, D.C. (3)

U.S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 -

8106160/N S

1 - . -- ._ .- - _.