Pilgrim - NRC Staff Letter Notifying the Administrative Judges and the Parties That the Hearing File and Mandatory Disclosures Are Available
ML063200344
Person / Time
Site: Pilgrim
Issue date: 11/15/2006
From: Roth D
NRC/OGC
To: Abramson P, Cole R, Austin Young
Atomic Safety and Licensing Board Panel
Giitter R
References
50-293-LR, ASLBP 06-848-02-LR, RAS 12545
Download: ML063200344 (62)


Text

November 15, 2006 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

Pursuant to 10 C.F.R. § 2.1203(a), the staff of the Nuclear Regulatory Commission (Staff) herein notifies the Licensing Board and the parties that a hearing file has been created for this proceeding. The hearing file includes materials required pursuant to 10 C.F.R. § 2.1203, as well as the Staffs mandatory disclosures produced pursuant to 10 C.F.R. § 2.336(b). Materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.

On or about Wednesday, November 15, 2006, the hearing file will be made available via the Electronic Hearing Docket (EHD), which may be accessed at the following URL:

http://www.nrc.gov/reading-rm/ehd.html/. The hearing file will be contained in a sub-folder entitled, Pilgrim Hearing File in the Pilgrim 293-LR" folder of the EHD.

R. Cole November 15, 2006 P. Abramson A. Young In addition, as required by 10 C.F.R. § 2.336(b)(5), the Staff is producing a privilege log at this time, which is appended hereto as Attachment 2. Also attached is the Declaration of Frank Gillespie formally invoking the deliberative process privilege with respect to each of the documents in Attachment 2. The Staff will preserve and maintain all privileged documents during the pendency of this proceeding.

10 C.F.R. § 2.336(c) requires that all disclosures are accompanied by a certification (by sworn affidavit) that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as of the date of the certification. The required affidavit of the Perry Buckberg, is attached but unsigned due to Mr. Buckberg's unavailability.

Mr. Buckberg's signed Affidavit will be provided upon his return to the office on or about November 16, 2006.

Sincerely,

/RA/

David E. Roth Counsel for NRC Staff

Enclosures:

Hearing File Index Privilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Frank Gillespie cc: Office of Commission Diane Curran, Esq. Molly H. Bartlett, Esq.

Appellate Adjudication Matthew Brock, Esq. Sheila Slocum Hollis Office of the Secretary Terence A. Burke, Esq. David R. Lewis, Esq.

ATTN: Rulemaking and Paul A. Gaukler, Esq. Town Manager, Adjudications Staff Richard R. MacDonald Town of Plymouth Atomic Safety and Licensing Board Panel

ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Initial Disclosures - November 15, 2006 ID # Accession Document Title/Description:

Number Date 00-001 ML003678174 1/7/2000 Letter informing that Entergy Nuclear Generation Company plans to submit a license renewal application in accordance with 10CFR54 for the Pilgrim Nuclear Power Station in the second half of 2004.00-002 ML041140047 4/15/2004 Deferral of the Pilgrim License Renewal Application.00-003 ML043440123 12/2/2004 Pilgrim, Notice of Intent to Submit License Renewal Application.00-004 ML062120491 1/25/2006 Email: (PA) Re: Checking In 00-005 ML060300028 1/25/2006 Pilgrim Nuclear Power Station License Renewal Application.00-006 ML060300026 1/25/2006 Transmittal of Pilgrim Nuclear Power Station License Renewal Application.00-007 ML060830611 1/25/2006 Pilgrim Nuclear Power Station Applicants Environmental Report Operating License Renewal Stage, Appendix E.00-008 ML060470240 1/25/2006 Package- Pilgrim, License Renewal Application Boundary Drawings.00-009 ML062120498 1/27/2006 Email: (PA) Receipt of License Renewal Applications for VY and Pilgrim 00-010 ML060310043 1/31/2006 Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.00-011 ML060310593 1/31/2006 Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station.00-012 ML060370581 2/3/2006 Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.00-013 ML062120499 2/3/2006 Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal Page 1 of 15

ID # Accession Document Title/Description:

Number Date 00-014 ML062120543 2/15/2006 Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.00-015 ML061430204 2/23/2006 Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts00-016 ML062120549 2/28/2006 Email: (PA) Closeout: G20060065/LTR-06-0042 - Letter for Mark D. Sylvia, Town of Plymouth, Regarding Relicensing of Pilgrim and Vermont Yankee and Response Letter from J.E. Dyer, NRR 00-017 ML062120625 3/21/2006 Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing 00-018 ML062480291 3/30/2006 Email: (PA) PNPS Audit Plan.00-019 ML062120629 3/31/2006 Email: (PA) Re: Request - License Renewal Work for CFEB 00-020 ML062120631 4/3/2006 Email: (PA) Re: Request - License Renewal Work for CFEB 00-021 ML062480085 4/4/2006 E-mail: (PA) Pilgrim Audit Plan 00-022 ML062120636 4/6/2006 Email: (PA) Audit Questions00-023 ML062120642 4/7/2006 Email: (PA) AMP, AMR, and TLAA questions for PNPS00-024 ML062130095 4/10/2006 Email: (PA) 1999 LR Guidance on Dams00-025 ML061160613 4/21/2006 Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.00-026 ML061170085 4/21/2006 Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.00-027 ML062120415 4/24/2006 E-mail: (PA) PNPS AMP Questions00-028 ML061160283 4/25/2006 Request for a List of Protected Species and Essential Fish Habitat Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.

Page 2 of 15

ID # Accession Document Title/Description:

Number Date 00-029 ML061160303 4/25/2006 Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.00-030 ML063070331 4/25/2006 E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.00-031 ML062090546 4/27/2006 Email: (PA) PNPS LRA Appendix C - BWRVIP Actions00-032 ML061180424 4/28/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)00-033 ML062090499 4/28/2006 Email: (PA) Pilgrim Questions to be Discussed at the Audit 00-034 ML062010482 4/30/2006 Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005 00-035 ML061430177 5/2/2006 Email from Gerard Zavaski to Fred Mogolesko re: Dose Data 2002-2005 inclusive 00-036 ML062090488 5/4/2006 Email: (PA) AMP questions00-037 ML062090496 5/4/2006 Email: (PA) PNPS Template for not consistent with Gall AMRs00-038 ML062120647 5/4/2006 Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X 00-039 ML062090322 5/5/2006 EMAIL: (PA) AMR Template for Not Consistent with Gall Section 00-040 ML062090498 5/5/2006 Email: (PA) Re: Bolting Integrity Program 00-041 ML062090493 5/5/2006 Email: (PA) Re: PNPS Template for not consistent with GALL AMRs00-042 ML062090324 5/8/2006 Email: (PA) AMR Questions for Pilgrim 00-043 ML062090328 5/9/2006 EMAIL: (PA) AMR Review of Section 3.3 00-044 ML063070393 5/10/2006 E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit -

for Pilgrim LRA.

Page 3 of 15

ID # Accession Document Title/Description:

Number Date 00-045 ML062480272 5/10/2006 Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.00-046 ML062480283 5/10/2006 Email: (PA) FWD: Pilgrim AMP Combined Questions00-047 ML061310234 5/11/2006 Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)00-048 ML063070402 5/11/2006 E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.00-049 ML062090333 5/11/2006 EMAIL: (PA) Table 3.3.1 AMR questions00-050 ML063050518 5/11/2006 EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.00-051 ML061380549 5/11/2006 Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.00-052 ML062410406 5/12/2006 PNPS License Scoping Comment - Tom Belcher.00-053 ML061420164 5/17/2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.00-054 ML063060296 5/19/2006 EMAIL: (PA-LR) Information re: Pilgrim LRA.00-055 ML061410001 5/19/2006 Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.00-056 ML063050506 5/22/2006 EMAIL: (PA-LR) Pilgrim ETE Comments.00-057 ML061440026 5/22/2006 Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).00-058 ML061650016 5/23/2006 U.S. Dept. Of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding:

Formal Consultation on Pilgrim License Renewal Not Required.00-059 ML061710601 5/24/2006 Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.00-060 ML062090338 5/28/2006 Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL Report 00-061 ML061560215 5/30/2006 Culture Resources Site Maps Page 4 of 15

ID # Accession Document Title/Description:

Number Date 00-062 ML063060299 5/30/2006 EMAIL: (PA-LR) PNPS License Renewal - Environmental.00-063 ML063050504 6/2/2006 EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.00-064 ML063060322 6/2/2006 EMAIL: (PA-LR) PNPS - Spotted Turtle.00-065 ML061650255 6/7/2006 Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01, Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell.00-066 ML061710422 6/7/2006 Pilgrim, License Renewal Application, Amendment 2.00-067 ML063070330 6/8/2006 E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).00-068 ML061710600 6/8/2006 Ltr from Mr. Colosi, NOAA to DLR addressing EFH.00-069 ML063070327 6/9/2006 E-Mail: The second set of AMR Questions.00-070 ML063050512 6/9/2006 EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.00-071 ML061670101 6/12/2006 Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrims License Renewal Application.00-072 ML061710104 6/14/2006 Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.00-073 ML061770277 6/15/2006 Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).00-074 ML061770407 6/15/2006 Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Stations License Renewal Application-Federal Register Notice, April 14, 2006.00-075 ML061770043 6/16/2006 Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.

Page 5 of 15

ID # Accession Document Title/Description:

Number Date 00-076 ML061770045 6/16/2006 Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.00-077 ML061770395 6/20/2006 Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.00-078 ML062510359 6/21/2006 Email: (PA) Additional Missing AMPs00-079 ML062510361 6/22/2006 Email: (PA) Additional Missing AMPs00-080 ML062510295 6/22/2006 Email: (PA) Additional missing AMPs00-081 ML061740031 6/23/2006 Press Release-I-06-038: Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.00-082 ML062120410 6/25/2006 E-mail: (PA) Additional AMR Question - Section 3.1.1 00-083 ML061780159 6/26/2006 Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re:

Limited Appearance Statements00-084 ML063070323 6/26/2006 E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.00-085 ML062130145 6/26/2006 Email: (PA) Audit Report Attachment 5 - List of Documents00-086 ML063050509 6/26/2006 EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006.00-087 ML063060267 6/26/2006 EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].00-088 ML062120407 6/27/2006 E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses00-089 ML062090388 6/27/2006 Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses Page 6 of 15

ID # Accession Document Title/Description:

Number Date 00-090 ML063050396 6/27/2006 EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.00-091 ML062120406 6/29/2006 E-mail: (PA) - None -

00-092 ML062130057 6/29/2006 Email: (PA) Additional Question from Bob Jackson 00-093 ML062090309 6/29/2006 Email: (PA) Jim and Peter 00-094 ML062130056 6/29/2006 Email: (PA) Non-Safety Related SCs00-095 ML062090319 6/29/2006 Email: (PA) PNPS Shell 00-096 ML062090318 6/29/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-097 ML062130058 6/29/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-098 ML063050603 6/29/2006 EMAIL: (PA-LR) Additional Questions From Bob Jackson 00-099 ML063050610 6/29/2006 EMAIL: (PA-LR) Non-Safety Related SCs.00-100 ML061810424 6/30/2006 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station.00-101 ML062120423 6/30/2006 Email: (PA) Draft AMP Section of Audit Report 00-102 ML062510364 6/30/2006 Email: (PA) Draft AMP Section of Audit Report 00-103 ML062480379 6/30/2006 Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.00-104 ML062480297 6/30/2006 Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.00-105 ML062090380 6/30/2006 Email: (PA) Response to ARM Questions 482 and 483 00-106 ML063050613 6/30/2006 EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.00-107 ML062130018 6/30/2006 Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews Page 7 of 15

ID # Accession Document Title/Description:

Number Date 00-108 ML062090565 7/3/2006 Email: (PA) Re: QA for Aging Management of NSR Components00-109 ML062130053 7/5/2006 Email: (PA) Comments on the AMP writeup 00-110 ML062130091 7/5/2006 Email: (PA) FW: Handing of Generic Issues00-111 ML062090297 7/5/2006 Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 00-112 ML062090563 7/5/2006 Email: (PA) PNPSs TLAA Section 4.6 00-113 ML062090305 7/5/2006 Email: (PA) PNPSs TLAA Section 4.6 00-114 ML062090304 7/5/2006 Email: (PA) Quality Assurance for Aging Management of NSR Components00-115 ML062090561 7/5/2006 Email: (PA) Quality Asurance for Aging Management of NSR Components00-116 ML062090303 7/5/2006 Email: (PA) Re: Draft AMP Section of Audit Report 00-117 ML062130064 7/5/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components00-118 ML062130054 7/5/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components00-119 ML061940175 7/5/2006 Pilgrim - License Renewal Application Amendment 3.00-120 ML061930418 7/5/2006 Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.00-121 ML061930218 7/6/2006 Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.00-122 ML062130061 7/6/2006 Email: (PA) Additional AMR questions00-123 ML062130086 7/6/2006 Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 00-124 ML062120477 7/6/2006 Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.00-125 ML063060309 7/6/2006 EMAIL: (PA-LR) FW: PNPS ER EJ writeup.

Page 8 of 15

ID # Accession Document Title/Description:

Number Date 00-126 ML062070067 7/7/2006 Pilgrim - Limited Appearance Statement by Maurice C. Cion.00-127 ML062060607 7/7/2006 Pilgrim - Limited Appearance Statement by W. Bramhall 00-128 ML062120412 7/7/2006 E-mail: (PA) Re: Comments on Pilgrim AMP document 00-129 ML062120480 7/7/2006 Email: (PA) Comments on Pilgrim AMP document 00-130 ML062090293 7/7/2006 Email: (PA) Re: Comments on Pilgrim AMP Document 00-131 ML063070319 7/10/2006 E-Mail: FWD: Response to your question regarding Radwaste Piping.00-132 ML062090362 7/11/2006 CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.00-133 ML063060302 7/11/2006 EMAIL: (PA-LR) FW: Pilgrim Document 83.00-134 ML063070536 7/12/2006 E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.00-135 ML062070224 7/13/2006 Pilgrim - Limited Appearance Statement of John R. Glover.00-136 ML061940368 7/13/2006 Press Release-I-06-040: NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.00-137 ML061700055 7/13/2006 Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.00-138 ML062070051 7/17/2006 Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) .00-139 ML063070252 7/17/2006 E-Mail: Core shroud tie rod upper support cracking- information request.00-140 ML063060239 7/17/2006 Email: (PA-LR) Additional info for ER.00-141 ML063060259 7/17/2006 EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson].00-142 ML063060249 7/17/2006 EMAIL: (PA-LR) Re: Pilgrim.

Page 9 of 15

ID # Accession Document Title/Description:

Number Date 00-143 ML062090075 7/19/2006 Pilgrim - License Renewal Application Amendment 5.00-144 ML062080142 7/19/2006 Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.00-145 ML062090383 7/21/2006 Email: (PA) Fwd: Re: RAI for section 3.5 00-146 ML063070318 7/24/2006 E-Mail: FW: Pilgrim LRA Amendment 5.00-147 ML062090387 7/24/2006 Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.00-148 ML062070305 7/25/2006 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.00-149 ML062510296 7/25/2006 Email: (PA) Piligrim AMP/AMR Audit Report 00-150 ML062480362 7/25/2006 EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.00-151 ML062070240 7/25/2006 Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-152 ML062070295 7/25/2006 Summary of Conference Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676).00-153 ML063070241 7/26/2006 E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.00-154 ML062480388 7/26/2006 EMAIL: (PA) Revised AMR 3.4 Input 00-155 ML062120464 7/26/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).00-156 ML063070246 7/27/2006 E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.00-157 ML063070595 7/27/2006 Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.

Page 10 of 15

ID # Accession Document Title/Description:

Number Date 00-158 ML062510306 7/27/2006 Email: (PA) PNPS Q&Q 00-159 ML063070232 7/31/2006 E-Mail: Fwd: PNPS Q&A Data Base.00-160 ML062510302 7/31/2006 Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRA 00-161 ML062510299 7/31/2006 Email: (PA) Urgent - revised section 3.0.4 input for QA program 00-162 ML062120662 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-163 ML062120743 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-164 ML062120752 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.00-165 ML062480391 8/2/2006 EMAIL: (PA) AMR Audit Report Section 3.3 00-166 ML062480361 8/2/2006 EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)00-167 ML062510324 8/2/2006 Fax to Brian Ford/Fred Mogolesko from RAMS.00-168 ML063070332 8/2/2006 FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.00-169 ML062480385 8/3/2006 EMAIL: (PA) Ducs Audit and Review Report Input 00-170 ML062480383 8/3/2006 EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.00-171 ML062480381 8/3/2006 EMAIL: (PA) TLAA Input 00-172 ML062480395 8/3/2006 EMAIL: (PA) TLAA Section 4.3 Input 00-173 ML063070219 8/7/2006 E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.

Page 11 of 15

ID # Accession Document Title/Description:

Number Date 00-174 ML063070220 8/7/2006 E-Mail: FW: RAM.00-175 ML063070239 8/7/2006 E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.00-176 ML063070225 8/10/2006 E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.00-177 ML063070228 8/11/2006 E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.00-178 ML062510343 8/11/2006 Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRA 00-179 ML062510350 8/14/2006 Email: (PA) LRA B.1.1, Boraflex Program 00-180 ML062510346 8/14/2006 Email: (PA) RAIs 3.5.1-1 and 3.5.1-2 00-181 ML062290474 8/14/2006 RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-182 ML062280218 8/15/2006 Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station.00-183 ML063040463 8/16/2006 EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).00-184 ML063070230 8/18/2006 E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.00-185 ML063070188 8/21/2006 E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).00-186 ML062990442 8/21/2006 EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.00-187 ML062990253 8/21/2006 EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.00-188 ML062420060 8/22/2006 Pilgrim - License Renewal Application Amendment 6.00-189 ML062350440 8/22/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-190 ML063070217 8/23/2006 E-Mail: FW: Pilgrim License Renewal Application Amendment 6.

Page 12 of 15

ID # Accession Document Title/Description:

Number Date 00-191 ML063070190 8/23/2006 E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.00-192 ML063050296 8/23/2006 EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).00-193 ML062360514 8/23/2006 Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No. MC9676).00-194 ML062980322 8/25/2006 Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA.00-195 ML062510307 8/25/2006 Email: (PA) Pilgrim Audit Report Peer Review AMP Sections00-196 ML062410379 8/25/2006 Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.00-197 ML063070361 8/28/2006 E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.00-198 ML063070375 8/28/2006 E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.00-199 ML063070367 8/28/2006 E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.00-200 ML062650221 8/30/2006 Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney Generals Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).00-201 ML062980258 8/30/2006 E-mail: (PA) SER Input.00-202 ML062500117 8/30/2006 Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.00-203 ML063110209 9/5/2006 EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).00-204 ML063060595 9/7/2006 E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.

Page 13 of 15

ID # Accession Document Title/Description:

Number Date 00-205 ML062490501 9/7/2006 Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).00-206 ML062990446 9/8/2006 EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.00-207 ML062500431 9/8/2006 Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.00-208 ML062500401 9/8/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).00-209 ML063070420 9/13/2006 E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.00-210 ML062650072 9/13/2006 Pilgrim - License Renewal Application Amendment 8.00-211 ML062710517 9/26/2006 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Entergy Nuclear Operations, Inc., for Renewal of the Operating License for Pilgrim Nuclear Power Station.00-212 ML063050380 10/3/2006 E-MAIL: (PA-LR) Information from the Conference call on 9/26/06.00-213 ML063110171 10/6/2006 Email: (NPA-PD-LR) Fwd: Pilgrim LRA Amendment 9 10/6/2006.00-214 ML062910173 10/6/2006 Pilgrim, License Renewal Application Amendment 9, Revised List of Regulatory Commitments and Response to RAIs on Aging Management Review in LRA Section 3.2 Engineered Safety Features and Time Limiting Aging Analysis in LRA Section 4.2 Reactor Vessel....00-215 ML063070406 10/12/2006 Email: (NPA-PD-LR) Requested Documents [Sending USPS 2 Documents].00-216 ML063050385 10/19/2006 E-MAIL: (PA-LR) FW: Figure 2-1.00-217 ML063050392 10/19/2006 EMAIL: (PA-LR) FW: Drawing.00-218 ML063050388 10/19/2006 EMAIL: (PA-LR) FW: Figure 3-1.00-219 ML063050501 10/23/2006 EMAIL: (PA-LR) Re: Pilgrim - Amendments to the LRA.

Page 14 of 15

ID # Accession Document Title/Description:

Number Date 00-220 ML062850407 10/23/2006 Summary of Conference Call on October 10, 2006 with Entergy Nuclear Operations. Inc.,

to Clarify Information Sent to the NRC in Response to Requests for Additional Information Regarding the Pilgrim License Renewal Application (TAC NO. MC9669).00-221 ML062890001 10/24/2006 Summary of Conference Call with Entergy Nuclear Operations, Inc, to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station.

Page 15 of 15

ATTACHMENT 2 PILGRIM NUCLEAR POWER STATION HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Initial Disclosures - November 15, 2006 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.

§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-001 ML062980 Hurley B, Earth EMAIL: (NPA-PD-LR) 04/19/2006 E-Mail Schaaf R G, Status of the 2 597 Tech, Inc Pre-Audit Draft TER. Williamson A Pre-Audit Draft R, RC Version of the TER Associates, Inc DP-00-002 ML063050 Schaaf R G, EMAIL: (NPA-PD-LR) 04/20/2006 E-Mail Williamson A Scouting Trip Notes 16 403 NRC/NRR Pilgrim Scout Trip R, NRC Notes.

DP-00-003 ML063050 Schaaf R G, EMAIL: (NPA-PD-LR) 04/20/2006 E-Mail Mullins A J, Discussions on 2 408 NRC/NRR Re: Possible Tribe Williamson A tribal recognition Info. R, NRC DP-00-004 ML062990 Schaaf R G, EMAIL: (NPA-PD-LR) 04/24/2006 E-Mail Hurley B, Internal 20 242 NRC/NRR Draft Audit Checklists. Szeligowski transmission of draft J, Earth Tech, checklists to aid Inc subject matter experts DP-00-005 ML062980 Schaaf R G, EMAIL: (NPA-PD-LR) 04/24/2006 E-Mail Szeligowski Discussions on 4 602 NRC Comments/Questions J, Earth Tech, water quality, socio-Re: Information Inc economics, and Requests. alternatives Page 1 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-006 ML062980 Schaaf R G, EMAIL: (NPA-PD-LR) 04/24/2006 E-Mail Szeligowski Internal questions 3 600 NRC/NRR Resending - Another J, Earth Tech, on regional Question on Info Inc demography Requests [Another 2 Questions].

DP-00-007 ML062980 Schaaf R G, EMAIL: (NPA-PD-LR) 04/24/2006 E-Mail, Palla R L, Coordination of 19 598 NRC Fwd: Revised RAIs. Request for Williamson A review of revised Additional R, NRC SAMA RAIs Information (RAI)

DP-00-008 ML062980 Schaaf R G, EMAIL: (NPA-PD-LR) 04/24/2006 E-Mail Szeligowski Internal questions 3 599 NRC/NRR Resending - Another J, Earth Tech, and comments on Question on Info Inc state criteria Requests.

DP-00-009 ML062990 Schaaf R G, EMAIL: (NPA-PD-LR) 04/25/2006 E-Mail Szeligowski Internal request to 3 243 NRC/NRR Info Needs J, Earthtech, clarify RA Clarification Inc Requested.

DP-00-010 ML063110 Rubin M P, (NPA-PD-LR) Memo 04/26/2006 Memoranda Franovich R Internal 8 133 NRC/NRR/ to R. Franovich Re: L, NRC/NRR/ transmission of ADRA/DRA/AP Request for Additional ADRO/DLR/R RAIs from LA Information to Support EBA Probabilistic Risk the Staff's Severe Assessment Accident Mitigation Licensing Branch A Alternative Review for Division of Risk Pilgrim Nuclear Power Assessment Office Station (TAC No. of Nuclear Reactor MC9676). Regulation Page 2 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-011 ML062070 Prepared by S117763 04/26/2006 OCR from Prepared for Audit and Review 233 Advanced Scanned Division of Plan for Plant Aging Technologies Image License Management and Renewal Reviews and Laboratories Programs International, Inc. Contract No. DR 06-030 DP-00-012 ML063040 Szeligowski J, EMAIL: (NPA-PD-LR) 04/27/2006 E-Mail Williamson A Internal 6 439 Earth Tech, Inc Final Set of PNPS R, transmission of Audit Questions. RAIs DP-00-013 ML063040 Palla R L, NRC EMAIL: (NPA-PD-LR) 04/27/2006 E-Mail, Emch R L, Internal 18 432 SAMA RAIs for Request for Schaaf R G, transmission of and Pilgrim and VY. Additional NRC discussion of SAMA Information RAIs (RAI)

DP-00-014 ML063060 Emch R L, EMAIL: (NPA-PD-LR) 04/28/2006 E-Mail Palla R L, Discussions of draft 3 385 NRC Re: Pilgrim and VY Schaaf R G, RAIs RAI Deletions. NRC DP-00-015 ML063110 Pope S, ISL, EMAIL: (NPA-PD-LR) 05/05/2006 - No Stubbs A, Internal 17 599 Inc Delivery of Subtasks Document NRC Transmission of 1 and 2a for Contract Type review results and

  1. NRC-03-03-038, Applies, E- RAIs Pilgrim Task Order Mail 24, Balance of Plant Branch, JCN J-3157, TAC No. MC9669.

Page 3 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-016 ML063050 Nash H L, NRC EMAIL: (NPA-PD-LR) 05/08/2006 E-Mail Benner E J, Internal Comment 2 413 Winter Flounder Duda S, on internet Hatchery. Schaaf R G, information on Williamson A hatchery.

R, Earth Tech, Inc, NRC DP-00-017 ML063060 Szeligowski J, EMAIL: (NPA-PD-LR) 05/09/2006 E-Mail, Williamson A Internal 10 152 Earth Tech, Inc Document Request Graphics R, NRC transmission of List. incl Charts document request and Tables list generated during the PNPS Site Audit.

DP-00-018 ML062980 Wen P C, NRC Email: (NPA-PD-LR) 05/10/2006 E-Mail Subbaratnam Internal 48 359 Fwd: Pilgrim AMP R, NRC transmission of Combined Questions. Pilgrim AMP Combined Questions DP-00-019 ML063060 Nash H L, NRC EMAIL: (NPA-PD-LR) 05/10/2006 E-Mail Benner E J, Discussion of policy 2 156 Re: EFH meeting with Mullins A, for meeting NMFS (5/16). Schaaf R G, Williamson A R, NRC DP-00-020 ML062980 Subbaratnam Email: (NPA-PD-LR) 05/10/2006 E-Mail Davis J A, Discussion/request 2 360 R, NRC Re: AMP Questions NRC of form and status for Pilgrim. of AMP questions Page 4 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-021 ML062980 Davis J A, NRC Email: (NPA-PD-LR) 05/10/2006 E-Mail Subbaratnam Internal 40 357 Questions for the R, NRC transmission of Pilgrim AMP Audit. questions for the Pilgrim AMP audit.

DP-00-022 ML063060 Flynn C, Earth EMAIL: (NPA-PD-LR) 05/11/2006 E-Mail Emch R L, Comment on team 5 094 Tech, Inc FW: PNPS Site Audit, NRC makeup and Radwaste Systems. document keeping DP-00-023 ML062980 , - No Known Email: (NPA-PD-LR) 05/11/2006 E-Mail Davis J A, Internal 10 361 Affiliation Table 3.3.1 AMR Hoang D V, transmission of Questions. Jackson W R, AMR questions Nguyen D T, Patel E, Pavinich W, Pavinich W A, Subbaratnam R, Wen P C, -

No Known Affiliation, NRC DP-00-024 ML062980 Weaver K D, EMAIL: (NPA-PD-LR) 05/12/2006 E-Mail Subbaratnam SRI's comments on 5 364 NRC Fwd: Re: Pilgrim's R, NRC LRA review Progress, CDBI Daily Update 5/11.

DP-00-025 ML063060 Franovich R L, Email: (NPA-PD-LR) 05/15/2006 E-Mail Williamson A Speaker's Notes for 13 158 NRC Script for Rani. J, NRC public meeting.

Page 5 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-026 ML063060 Duda S, Email: (NPA-PD-LR) 05/17/2006 E-Mail Williamson A, Internal 4 161 Earthtech, Inc Addt'l Questions for NRC transmission of Entergy. RAIs on environment DP-00-027 ML062970 Raymond W J, Email: (NPA-PD-LR) 05/18/2006 E-Mail Powell R J, Internal thoughts on 8 384 NRC/RGN- Comments on LRA NRC May 17th LRA I/DRP/PB5 Public Meeting. Public Meeting on Environmental Scoping Process DP-00-028 ML063100 Pappalardo M, EMAIL: (NPA-PD-LR) 05/23/2006 E-Mail Williamson A Discussions of 2 088 Earthtech, Inc Re: Pilgrim Site Audit R, NRC data/report Data Requests. information requests and a plant contact DP-00-029 ML063100 Craig N, Earth EMAIL: (NPA-PD-LR) 05/24/2006 E-Mail Williamson A Discussion 3 116 Tech, Inc Re: Pilgrim Site Audit R, NRC regarding Data Requests documentation

[missing information].

DP-00-030 ML063060 Franovich R L, EMAIL: (NPA-PD-LR) 05/31/2006 E-Mail Emch R L, Comment on 2 358 NRC T-line for NRC strategy for VY/constructive feedback feedback to Entergy on the Pilgrim and VY Audits.

Page 6 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-031 ML063040 Patel E, - No EMAIL: (NPA-PD-LR) 05/31/2006 E-Mail Davis J A, Internal guidelines 5 435 Known Guidelines for AMP Hoang D V, to make all sections Affiliation write-up. Nguyen D T, consistent.

Subbaratnam R, Wen P C, NRC DP-00-032 ML063100 Nash H L, NRC EMAIL: (NPA-PD-LR) 05/31/2006 E-Mail Dillard S, Discussion 2 109 Re: PNPS License Williamson A regarding spotted Renewal - Spotted R, Earth turtle Turtle [one more Tech, Inc, thought]. NRC DP-00-033 ML063060 Franovich R L, EMAIL: (NPA-PD-LR) 05/31/2006 E-Mail Emch R L, Comments on 2 354 NRC Need a conference Palla R L, SAMA analysis call on VY/Pilgrim Schaaf R G, reviews SAMA analysis RAIs. Williamson A R, NRC DP-00-034 ML063100 Nash H L, NRC Email: (NPA-PD-LR) 05/31/2006 E-Mail Dillard S, Discussion 2 114 Re: PNPS License Earth Tech, regarding spotted Renewal - Spotted Inc turtle Turtle.

DP-00-035 ML063060 Palla R L, NRC EMAIL: (NPA-PD-LR) 06/01/2006 E-Mail Williamson A Planned discussion 3 360 Re: Availability for R, NRC topics for phone call SAMA phone call for Pilgrim.

DP-00-036 ML063100 Hurley B, Earth EMAIL: (NPA-PD-LR) 06/05/2006 E-Mail, Williamson A Internal discussion 21 059 Tech, Inc Re: Pilgrim Scoping Meeting R, NRC of transcript Meeting Transcripts. Transcript Page 7 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-037 ML063060 Craig N, Earth Email: (NPA-PD-LR) 06/08/2006 E-Mail Williamson A Pilgrim Nuclear 12 333 Tech, Inc Re: Pilgrim Site Audit R, NRC Power Station Site Data Requests. Audit Document Request List (last updated 6/6/06) plus comments/

corrections DP-00-038 ML063100 Palla R L, NRC EMAIL: (NPA-PD-LR) 06/12/2006 E-Mail Jacobs C J, Discussion of 2 107 Fwd: Re: Pilgrim Site Williamson A unresolved items Audit Data Requests. R, NRC DP-00-039 ML063060 Emch R L, Email: (NPA-PD-LR) 06/12/2006 E-Mail Luu A, NRC Internal review 5 378 NRC Andy - Take a look at request these for me [from R.

Emch to A. Luu Pilgrim Contention 1

& 5].

DP-00-040 ML063060 Emch R L, Email: (NPA-PD-LR) 06/13/2006 E-Mail Luu A, NRC Discussions on Pu 3 374 NRC Re: Plutonium Levels Sediment Report.

DP-00-041 ML063060 Emch R L, Email: (NPA-PD-LR) 06/13/2006 E-Mail Luu A, NRC Assessment of Pu 4 367 NRC Re: Plutonium Levels Sediment Report

[closer look].

DP-00-042 ML063060 Duda S, Earth EMAIL: (NPA-PD-LR) 06/13/2006 E-Mail Nash H L, Draft meeting 8 104 Tech, Inc Pilgrim - NMFS Williamson A minutes for Pilgrim Meeting Notes. R, NRC License Renewal Meeting with NMFS May16, 2006 Page 8 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-043 ML063050 Subbaratnam Email: (NPA-PD-LR) 06/14/2006 E-Mail Auluck R C, Internal Comment 3 416 R, NRC Re: LR -VY and Dudley N F, on contentions Pilgrim contentions - Rowley J G, information Revised [from R. Uttal S L, Subbaratnam.] Young M A, NRC DP-00-044 ML063060 Jacobs C, NRC EMAIL: (NPA-PD-LR) 06/14/2006 E-Mail Palla R L, Discussion/ 3 109 Re: Potential Schmidt B, - coordination of open Followup call on No Known issues Pilgrim. Affiliation, ISL, Inc, NRC DP-00-045 ML063060 Craig N, Earth EMAIL: (NPA-PD-LR) 06/15/2006 E-Mail, Williamson A Internal corrections 20 351 Tech, Inc Document Request. Graphics R, NRC to/ comments incl Charts onPilgrim Nuclear and Tables Power Station Site Audit Document Request List DP-00-046 ML063110 Pope S L, ISL, Email: (NPA-PD-LR) 06/15/2006 E-Mail, Stubbs A, Internal 10 602 Inc Delivery of Subtask 5, Letter, Trip NRC transmission of trip Site Visit Trip Report Report report.

of Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC MC9669.

Page 9 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-047 ML063110 Pope S, Email: (NPA-PD-LR) 06/15/2006 E-Mail, Stubbs A, Internal 5 607 Information Delivery of Subtask Letter, NRC transmission of Systems Labs, 2c for Contract # Request for review results Inc NRC-03-03-038, Additional Pilgrim Task Order Information 24, Balance of Plant (RAI)

Branch, JCN J-3157, TAC No. MC9669.

DP-00-048 ML063050 Dudley N F, EMAIL: (NPA-PD-LR) 06/15/2006 E-Mail Subbaratnam Discussions of 2 342 NRC Re: LR - VY and R, NRC Contentions Pilgrim Contentions -

Revised.

DP-00-049 ML063060 Ellis D, Entergy (NPA-PD-LR) Notes 06/15/2006 Environmen , Handwritten notes 4 408 Nuclear 6/15/06. tal Impact plus portion of open Operations, Inc Statement, item list Note, Status Report DP-00-050 ML063050 Shea J J, EMAIL: (NPA-PD-LR) 06/16/2006 E-Mail Schaaf R G, Discussions and 2 346 NRC/NRR/ Pilgrim License Subbaratnam review of draft ADRO/DORL/L Renewal Status for R, NRC briefing package PLA Briefing Package.

DP-00-051 ML063060 Duda S, Earth EMAIL: (NPA-PD-LR) 06/19/2006 E-Mail, Nash H L, Draft of the minutes 10 349 Tech, Inc Entergy Meeting Meeting Williamson A from meeting with Notes. Summary R, NRC Entergy.

Page 10 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-052 ML063100 Palla R L, NRC EMAIL: (NPA-PD-LR) 06/19/2006 E-Mail Emch R L, Internal comment/ 2 101 Pilgrim RAIs Vs the Williamson A suggestion NEI Guidelines. R, NRC regarding RAIs and NEI guidelines DP-00-053 ML063040 Williamson A R, EMAIL: (NPA-PD-LR) 06/19/2006 E-Mail Fields L C, Internal 5 430 NRC Re: Need Pilgrim NRC transmission of Bullets by COB today. review status and Lessons Learned DP-00-054 ML063050 Fields L C, EMAIL: (NPA-PD-LR) 06/20/2006 E-Mail Franovich R Review copy 6 354 NRC Pilgrim and VY L, Lund L A, including Lessons briefing sheets for Mathew R K, Learned and Frank. Zimmerman J Technical Issues I,

DP-00-055 ML063050 Lavretta A, Email: (NPA-PD-LR) 06/20/2006 E-Mail, Iqbal N, NRC Draft Fire Protection 10 348 NRC Pilgrim LRA - Draft Memoranda RAIs RAIs for FP Scoping. , Request for Additional Information (RAI)

DP-00-056 ML063110 Pope S, ISL, EMAIL: (NPA-PD-LR) 06/20/2006 E-Mail Stubbs A, Comments on draft 5 619 Inc Reworded Draft RAls NRC RAIs for Pilgrim under Subtask 2.

Page 11 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-057 ML063050 Dudley N F, EMAIL: (NPA-PD-LR) 06/22/2006 E-Mail Subbaratnam Shell for the 67 358 NRC/NRR LR - S&S Shell R, NRC/NRR Scoping and Pilgrim. Sreening Results:

Mechanical Systems for Pilgrim.

DP-00-058 ML063110 Stubbs A, NRC EMAIL: (NPA-PD-LR) 06/22/2006 E-Mail Pope S, ISL, Transmission of 70 242 SER Shell for Pilgrim Inc draft writeup LRA Section 2.3.

DP-00-059 ML063100 Hurley B, Earth EMAIL: (NPA-PD-LR) 06/23/2006 E-Mail Williamson A Discussion of RAI 3 086 Tech, Inc Re: Status on RAIs. R, NRC status and scheduling DP-00-060 ML063050 Subbaratnam Email: (NPA-PD-LR) 06/26/2006 E-Mail Iqbal N, discussion on pre- 2 360 R, NRC Fwd: Pilgrim LRA - Lavretta A, submittal call for Draft Pilgrim Scoping NRC RAI and Screening Qs.

DP-00-061 ML063050 Rogers B H, EMAIL: (NPA-PD-LR) 06/26/2006 E-Mail Subbaratnam Internal submittal of 6 361 NRC/NRR Draft Pilgrim RAIs. R, NRC RAI DP-00-062 ML061780 Wilson G A, Pilgrim Nuclear 06/27/2006 Memoranda Lund A L, Internal RAIs from 3 081 NRC/NRR/ Station Regarding , Request NRC/NRR/ Electrical ADES/ Request for Additional for ADRO/DORL/ Engineering DE/EEEB Information - License Additional LPLA BranchDivision of Renewal Application, Information Engineering Section 2.5. (RAI)

Page 12 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-063 ML061730 Tatum J E, SBPB Request for 06/27/2006 Memoranda Zimmerman J Internal RAIs from 13 041 NRC/NRR/ Additional Information , Request I, NRC/NRR/ Balance-of-Plant ADES/ for the Review of the for ADRO/DLR/R BranchDivision of DSS/SBPB Pilgrim license Additional EBB, Safety Systems renewal application Information NRC/NRR/

(Tac No. MC9669). (RAI) ADRO/DLR/R LRB DP-00-064 ML061700 Weerakkody S Request for Additional 06/27/2006 Memoranda Lund A L, Internal RAIs from 7 514 D, NRC/NRR/ Information Regarding NRC/NRR/ Fire Protection ADRA/DRA/AF the License Renewal ADRO/DLR/R Branch Division of PB Application - Pilgrim LRA Risk Assessment Nuclear Power Office of Nuclear Station - Fire Reactor Regulation Protection (TAC No.

MC9669).

DP-00-065 ML063100 Duda S, Earth EMAIL: (NPA-PD-LR) 06/28/2006 E-Mail Williamson A Internal 2 103 Tech, Inc Pilgrim Reference. R, NRC transmission of reference from a previous discussion DP-00-066 ML063100 Craig N, Earth EMAIL: (NPA-PD-LR) 06/28/2006 E-Mail Williamson A Internal discussion 2 095 Tech, Inc Re: Requested R, NRC of receipt of two Documents. documents Page 13 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-067 ML061790 Hamzehee H Request for Additional 06/28/2006 Memoranda Kuo P T, Internal RAIs from 6 540 G, NRC/NRR/ Information (RAI) , Request NRC/NRR/ Quality & Vendor ADES/ Regarding Entergy for ADRO/DLR Branch B Division of DE/EQVB Nuclear Operations, Additional Engineering Office Inc., License Renewal Information of Nuclear Reactor Application for the (RAI) Regulation Pilgrim Nuclear Power Station, Dated January 27, 2006.

DP-00-068 ML063050 Dudley N F, EMAIL: (NPA-PD-LR) 06/28/2006 E-Mail, Rodriguez V Internal shell for 90 579 NRC LR - Shell to S&S for Report, M, NRC Scoping and Pilgrim. Miscellaneo Screening Results us for Mechanical Systems (sec. 2.3),

Structures (sec.

2.4), and Electrical and Instrumentation and Control Systems DP-00-069 ML063110 Pope S M, Email: (NPA-PD-LR) 06/29/2006 E-Mail, Stubbs A, Internal 5 610 Information Delivery of Subtask 2, Letter NRC/NRR/ transmission of Systems Labs, Recommended ADES/ DSS inspection Inc Inspection Items for recommendations Regional Inspection, for Contract # NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No. MC9669.

Page 14 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-070 ML063040 Cheruvenki G EMAIL: (NPA-PD-LR) 06/30/2006 E-Mail Subbaratnam Internal 3 425 S, NRC Fwd: RAI, TAC No. R, NRC transmission of RAI MC9669, Pilgrim LRA.

DP-00-071 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 06/30/2006 E-Mail, Medoff J, Internal review 79 428 R, NRC Fwd: Questions and Status NRC copies of Questions Answers of Pilgrim Report and Answers of LRA Aging Pilgrim LRA Aging Management Management Reviews. Reviews DP-00-072 ML061860 Cranston G V, Request for Additional 06/30/2006 Memoranda Lund L A, Internal RAIs from 3 006 NRC/NRR/ Information (RAI) on NRC/NRR/ BWR Systems ADES/ Pilgrim License ADRO/DLR/R Branch Division of DSS/SBWB Renewal Application. LRA Safety Systems Office of Nuclear Reactor Regulation DP-00-073 ML063060 Jacobs C, NRC EMAIL: (NPA-PD-LR) 07/07/2006 E-Mail Williamson A Draft copy of 9 143 Re: Site Audit R, NRC References

[Revised attached Collected at the with corrections Pilgrim Nuclear incorporated]. Power Station Site Audit May 1-4, 2006 Page 15 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-074 ML063120 Pope S M, ISL, EMAIL: (NPA-PD-LR) 07/10/2006 E-Mail Stubbs A, Transmission of 102 214 Inc Delivery of Subtask 3, NRC draft SER shell SER Input Using the writeup SER Shell for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No.

MC9669.

DP-00-075 ML063040 Reddy D K, EMAIL: (NPA-PD-LR) 07/10/2006 E-Mail Subbaratnam Internal discussions 4 427 NRC Fwd: Response to R, NRC on radwaste piping your question regarding Radwaste Piping.

DP-00-076 ML063060 Hurley B, Email: (NPA-PD-LR) 07/10/2006 E-Mail Williamson A Draft answer to 3 148 Earthtech, Inc Monitoring Programs. R, NRC question about monitoring program DP-00-077 ML063100 Hurley B, Earth Email: (NPA-PD-LR) 07/11/2006 E-Mail, Williamson A Internal 120 090 Tech, Inc Response to Report, R, NRC Transmission of comment - preliminary Miscellaneo draft Pilgrim generic report. us responses report DP-00-078 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 07/12/2006 E-Mail Dudley N F, Talking notes for 4 424 R, NRC Fwd: Pilgrim Briefing NRC project managers notes for 3-State meeting attached.

Page 16 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-079 ML063040 Jeng D C, NRC EMAIL: (NPA-PD-LR) 07/13/2006 E-Mail Subbaratnam Internal request for 2 423 Fwd: Pilgrim LRA R, NRC review material Amendment 1.

DP-00-080 ML063040 Jeng D C, NRC EMAIL: (NPA-PD-LR) 07/13/2006 E-Mail Subbaratnam Internal request for 2 422 Pilgrim LRA Drywell R, NRC review material Corrosion issue review.

DP-00-081 ML062980 Jeng D C, NRC EMAIL: (NPA-PD-LR) 07/14/2006 E-Mail Subbaratnam EGCB response to 3 412 Re: Pilgrim LRA R, NRC e-mail on Internal Drywell Corrosion work coordination Issue Review (from on Pilgrim LRA David Jeng). Drywell Corrosion issue review DP-00-082 ML062980 Subbaratnam EMAIL: (NPA-PD-LR) 07/14/2006 E-Mail Jeng D C, Internal work 3 411 R, NRC Re: Pilgrim LRA NRC coordination on Drywell Corrosion Pilgrim LRA Drywell Issue Review. Corrosion issue review DP-00-083 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 07/14/2006 E-Mail Hoang D V, Internal work 2 410 R, NRC Fwd: Pilgrim LRA NRC coordination Drywell Corrosion issue review.

DP-00-084 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 07/17/2006 E-Mail Lavretta A, Discussions on Call 3 453 R, NRC Re: Fwd: Pilgrim NRC content plus call requested a coordination telephone call on the Fire Protection RAIs on Pilgrim LRA.

Page 17 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-085 ML063040 Lavretta A, EMAIL: (NPA-PD-LR) 07/17/2006 E-Mail, Subbaratnam Draft of conference 13 457 NRC Re: Fwd: Pilgrim Note to File R, NRC call summary plus requested a incl Telcon comments telephone call on the Record, Fire Protection RAIs Verbal on Pilgrim LRA [from Comm Angela Lavretta].

DP-00-086 ML063070 Hurley B, Earth Email: (NPA-PD-LR) 07/17/2006 E-Mail Williamson A Internal 35 588 Tech, Inc Response to R, NRC transmission of draft Comments - Pilgrim. responses to public comments DP-00-087 ML062980 Stubbs A, E-MAIL: (NPA-PD- 07/17/2006 E-Mail Subbaratnam Recommendations 5 416 NRC/NRR LR) Fwd: Delivery of R, NRC/NRR for systems to be Subtask 2, included as Recommended inspection items.

Inspection Items for Regional Inspection, for Contract #NRC-03-03.

DP-00-088 ML063100 Hurley B, EMAIL: (NPA-PD-LR) 07/17/2006 E-Mail Williamson A Internal 5 053 Earthtech, Inc SAMA Comments R, NRC/NRR transmission of

[Initial Start]. proposed skeleton writeup for SAMA comments DP-00-089 ML062980 Lavretta A, EMAIL: (NPA-PD-LR) 07/18/2006 E-Mail, Subbaratnam Internal 22 590 NRC Re: As discussed- 2 Request for R, transmission of RAI for the review of Additional Draft RAIs Pilgrim. Information (RAI)

Page 18 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-090 ML063040 , - No Known EMAIL: (NPA-PD-LR) 07/19/2006 E-Mail Hoang D V, Audit report with 76 390 Affiliation [erachp@comcast.net NRC/NRR comments

] review of AMR audit report section 3.5 DP-00-091 ML062990 Medoff J, NRC EMAIL: (NPA-PD-LR) 07/20/2006 E-Mail Subbaratnam Internal work 4 245 FYI: Forwarding What R, NRC coordination We Want DCI/CFEB to look at for the Pilgrim Flaw Growth Analyses.

DP-00-092 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 07/20/2006 E-Mail, Lavretta A, Internal 11 247 R, NRC Your Pilgrim RAIs for Request for NRC transmission of fire e-concurrence. Additional protection RAIs Information (RAI)

DP-00-093 ML062980 Hoang D V, E-MAIL: (NPA-PD- 07/21/2006 E-Mail Subbaratnam Internal 3 405 NRC LR) RAI for section R, NRC transmission of fire 3.5. protection RAIs DP-00-094 ML062980 Cheruvenki G EMAIL: (NPA-PD-LR) 07/21/2006 E-Mail Subbaratnam Internal 7 409 S, NRC Emailing: Pilgrim R, NRC transmission of LRA-RA (7-21).wpd. RAIs DP-00-095 ML063040 , - No Known EMAIL: (NPA-PD-LR) 07/21/2006 E-Mail Hoang D V, Internal discussion 3 449 Affiliation Re: RAI for section Subbaratnam of draft RAIs 3.5 [from R, NRC erachp@comcast.net]

Page 19 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-096 ML062080 Mitchell M A, Request for Additional 07/21/2006 Memoranda Lund A L, Internal RAI from 4 554 NRC/NRR/ Information on , Request NRC/NRR/ Vessels & Internals ADES/ Management of Aging for ADRO/DLR/R Integrity Branch DCI/CVIB of Reactor Vessels Additional LRA Division of and Internals, Pilgrim Information Component Integrity Nuclear Power (RAI) Office of Nuclear Station, License Reactor Regulation Renewal Application DP-00-097 ML062980 Subbaratnam E-MAIL: (NPA-PD- 07/21/2006 E-Mail Hoang D V, Acknowledgment of 2 406 R, NRC LR) Re: RAI for NRC Internal section 3.5 (from Ram transmission of fire Subbaratnam). protection RAIs DP-00-098 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 07/24/2006 E-Mail Kuo P T, Status of RAIs and 3 446 R, NRC No. of Staff RAIs NRC comments on Received on Pilgrim possible more LRA (docket 50-293) as of date [July 24, 2006].

DP-00-099 ML063100 Cheruvenki G EMAIL: (NPA-PD-LR) 07/25/2006 E-Mail Gruss K A, Discussion of 3 061 S, NRC Fwd: FYI: Forwarding NRC evaluations of the What We Want effect of the crack DCI/CFEB to Look at growth For the Pilgrim, Flaw ,

Growth Analyses.

Page 20 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-100 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 07/25/2006 E-Mail Cheruvenki Coordination of 4 443 R, NRC Fwd: FYI: Forwarding G, Sydnor C discussion on crack What We Want R, NRC growth DCI/CFEB to Look at For the Pilgrim-Flaw Growth Analyses.

DP-00-101 ML063070 Palla R L, NRC EMAIL: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal question on 6 463 Pilgrim Scoping R, NRC SAMA writeup Comments and Response. doc.

DP-00-102 ML063070 Jacobs C J, Email: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal 2 579 NRC/NRR/ Proposed Response R, NRC transmission of draft ADRO/DLR Language re: writeup of Radioactive Release groundwater to GW. release info.

DP-00-103 ML063100 Jacobs C J, EMAIL: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal 2 047 NRC/NRR Proposed KI R, NRC/NRR transmission of Responses. proposed writeup for potassium iodide DP-00-104 ML063070 Jacobs C J, Email: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal 2 566 NRC Re: SAMA Words. R, transmission of draft portion of SAMA writeup DP-00-105 ML063100 Hurley B, Earth EMAIL: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal discussion 2 045 Tech, Inc Re: PNPS Scoping R, NRC/NRR of proposed human Summary [Human health -

Health demographics Demographics]. writeup Page 21 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-106 ML063050 Jacobs C, NRC EMAIL: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Comment on siren 2 586 Link to NRC R, NRC inspection Inspection Procedure procedure for Sirens.

DP-00-107 ML063070 Jacobs C J, EMAIL: (NPA-PD-LR) 07/27/2006 E-Mail Williamson A Internal discussions 2 471 NRC More KI Info. R, NRC of NRC policy DP-00-108 ML063030 , - No Known EMAIL: (NPA-PD-LR) 07/30/2006 E-Mail Davis J A, Internal comments 3 451 Affiliation LRA Amendment NRC on LRA Amendment letter July 19, 2006. letter July 19, 2006 DP-00-109 ML063030 Stubbs A, NRC EMAIL: (NPA-PD-LR) 07/31/2006 E-Mail Subbaratnam Internal trip report 10 448 Fwd: Site Visit Trip, R, NRC on BOP systems for Contract No. NRC-03-03-038, Pilgrim Task Order 24, B.

DP-00-110 ML063030 , - No Known E-MAIL: (NPD-PD- 07/31/2006 E-Mail Davis J A, Revisions to SER 6 446 Affiliation LR) Urgent - revised NRC/NRR writeup section 3.0.4 Input for QA Program DP-00-111 ML063070 Hurley B, Earth Email: (NPA-PD-LR) 07/31/2006 E-Mail Williamson A questions on status 2 475 Tech, Inc Thoughts on the R, NRC of several issues following?

Page 22 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-112 ML063030 Rogers B H, EMAIL: (NPA-PD-LR) 08/01/2006 E-Mail Subbaratnam Draft input for 2 443 NRC Re: Input for the R, NRC meeting summary Public exit meeting Summary for Pilgrim LRA AMP/AMR/Scoping and Screening audit 7/19.

DP-00-113 ML063070 Jacobs C J, Email: (NPA-PD-LR) 08/01/2006 E-Mail Williamson A Internal 2 546 NRC Postulated Accident R, NRC transmission of Search Results. NRC response to comments at Hatch DP-00-114 ML063040 Nguyen D T, EMAIL: (NPA-PD-LR) 08/02/2006 E-Mail Davis J A, Internal 4 459 NRC RAI for electrical audit NRC transmission of report at Pilgrim. electrical RAIs DP-00-115 ML062990 Davis J A, NRC EMAIL: (NPA-PD-LR) 08/02/2006 E-Mail Subbaratnam Transmission of 4 463 Meeting Summary R, NRC Internal Draft (July 19, 2006). meeting summary DP-00-116 ML062990 Hoang D V, EMAIL: (NPA-PD-LR) 08/02/2006 E-Mail Subbaratnam Transmission of 4 466 NRC RAI for Section 3.5 R, NRC draft RAI (Dan Hoang).

DP-00-117 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 08/02/2006 E-Mail Raymond W Transmission of 9 460 R, NRC Draft Meeting J, NRC Internal Draft Summary of the July meeting summary 19, 2006 at Radisson.

Page 23 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-118 ML063070 Hurley B, Earth EMAIL: (NPA-PD-LR) 08/02/2006 E-Mail Williamson A Discussion of status 4 559 Tech, Inc Re: Thoughts on the R, NRC of various tech.

following? issues DP-00-119 ML063070 Palla R L, NRC Email: (NPA-PD-LR) 08/03/2006 E-Mail Williamson A Draft of Pilgrim 6 465 Pilgrim Scoping R, NRC Scoping Comments Comments and and Response Responses.

DP-00-120 ML062990 Medoff J, NRC EMAIL: (NPA-PD-LR) 08/03/2006 E-Mail Subbaratnam Discussing FSAR 2 458 (to Ram Subbaratnam R, NRC information from James Medoff) clarification of the Question tracking.

DP-00-121 ML063070 Palla R L, NRC Email: (NPA-PD-LR) 08/07/2006 E-Mail, Williamson A Internal request to 5 466 Request for Request for R, NRC provide attached Clarification on Additional RAIs to licensee Pilgrim RAI Information Responses.wpd. (RAI)

DP-00-122 ML062980 Wen P C, EMAIL: (NPA-PD-LR) 08/08/2006 E-Mail Adams S A, Internal Request 3 428 NRC/NRR Asking ATL to NRC/NRR regarding internal Prepare the Final work coordination SER Input.

DP-00-123 ML062980 Sheng C F, EMAIL: (NPA-PD-LR) 08/08/2006 E-Mail Subbaratnam Internal Statement 3 432 NRC [Simon] still Waiting R, NRC of need of on stress analysis, information flaw evaluation, and a disposition.

Page 24 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-124 ML062210 Karas R L, Request for Additional 08/09/2006 Memoranda Lund A L, Internal RAI from 4 412 NRC/NRR/ Information Regarding , Request NRC/NRR/ Geoscience and ADES/ Section 2.4, "Scoping for ADRO/DLR/R Civil Engineering DE/EGCB and Screening Additional LRB Branch Division of Results: Structures," Information Engineering Office Pilgrim Nuclear Power (RAI) of Nuclear Reactor Station License Regulation Renewal Application.

DP-00-125 ML062980 Sheng C F, EMAIL: (NPA-PD-LR) 08/11/2006 E-Mail, Subbaratnam Internal 5 423 NRC/NRR RAI for Flaw Issues Request for R, NRC transmission of for the Pilgrim LRA. Additional vessel internals Information RAIs (RAI)

DP-00-126 ML062980 , - No Known EMAIL: (NPA-PD-LR) 08/14/2006 E-Mail Subbaratnam Internal 4 410 Affiliation RAIs 3.5.1-1 and R, NRC transmission of 3.5.1-2. revised RAIs DP-00-127 ML063070 Emch R L, EMAIL: (NPA-PD-LR) 08/16/2006 E-Mail Franovich R Strategy on 3 469 NRC Re: Fwd: Staff L, NRC response to Response to Pilgrim comments Watch Petition for use in responding the GT20060714.

DP-00-128 ML062980 Gruss K A, EMAIL: (NPA-PD-LR) 08/17/2006 E-Mail Subbaratnam Internal 3 593 NRC Re: RAI on Chapter R, NRC transmission of 4.0 TLAAs [From RAIs Kimberly Gruss].

Page 25 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-129 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 08/17/2006 E-Mail Gruss K A, Discussion of work 2 452 R, NRC Re: RAI on Chapter NRC coordination 4.0 TLAAs.

DP-00-130 ML062980 Subbaratnam EMAIL: (NPA-PD-LR) 08/18/2006 E-Mail Raymond W Internal planning of 3 591 R, NRC Re: Cable Vaults with J, NRC/RGN- scope of inspection Submerged Cables. I/DRP/PB5 DP-00-131 ML062010 Lavertta A, Summary of July 12, 08/20/2006 Memoranda Weerakkody Internal summary 413 NRC/NRR/ 2006, Teleconference S D, memo including ADRA/DRA/AF Regarding Draft NRC/NRR/ assessment of P Request for Additional ADRA/DRA/A information from Information on Pilgrim FP teleconference License Renewal Application - Fire Protection Scoping Review.

DP-00-132 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 08/21/2006 E-Mail Auluck R, Discussion on 5 254 R, NRC Fwd: Re: Cable NRC scope of evaluation Vaults with Submerged Cables.

DP-00-133 ML062990 , - No Known EMAIL: (NPA-PD-LR) 08/21/2006 E-Mail Subbaratnam Discussion of Draft 5 250 Affiliation Re: Additional draft R, NRC/NRR RAIs (draft RAIs) the Audit Team Requested (August 21, 2006).

DP-00-134 ML062990 Patel E, - No EMAIL: (NPA-PD-LR) 08/21/2006 E-Mail Subbaratnam Statement regarding 6 444 Known FW: Additional AMR R, NRC need for RAI Affiliation Questions. response Page 26 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-135 ML062980 Sydnor C R, E-mail: (NPA-PD-LR) 08/23/2006 E-Mail, Subbaratnam Internal 8 329 NRC Re: RAI on Chapter Memoranda R, NRC transmission of draft 4.0 TLAAs. , Request RAIs for the TLAA's for in Section 4.2 of the Additional PNPS LRA.

Information (RAI)

DP-00-136 ML063070 Nash H L, NRC Email: (NPA-PD-LR) 08/23/2006 E-Mail Williamson A Internal discussions 3 460 Fwd: RE: EFH outline. R, NRC on EFH outline DP-00-137 ML062980 Subbaratnam E-mail: (NPA-PD-LR) 08/24/2006 E-Mail Pal A N, NRC Discussion of draft 3 325 R, NRC Pilgrim LRA Section switchyard RAIs 2.5 Scoping &

Screening Review -

Your Draft RAI Request Dt: 6/27/06.

DP-00-138 ML062980 Subbaratnam Email: (NPA-PD-LR) 08/25/2006 E-Mail Sydnor C R, Discussion of draft 2 324 R, NRC Re: RAI on Chapter NRC RAIs for Section 4.2 4.0 TLAAs for Pilgrim of the PNPS LRA.

LRA.

DP-00-139 ML062980 Subbaratnam Email: (NPA-PD-LR) 08/25/2006 E-Mail Sydnor C R, Discussion of RV 2 321 R, NRC Re: RAI on Chapter NRC Chemistry and 4.0 TLAAs for Pilgrim Temperature data LRA.

DP-00-140 ML062980 Subbaratnam Email: (NPA-PD-LR) 08/25/2006 E-Mail Nguyen D T, Internal question of 3 323 R, NRC Pilgrim LRA Audit NRC fuse program Review.

Page 27 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-141 ML062980 , - No Known Email: (NPA-PD-LR) 08/28/2006 E-Mail Davis J A, Discussion of model 3 319 Affiliation Pilgrim SER. Subbaratnam for SER preparation R, NRC DP-00-142 ML062980 Subbaratnam E-mail: (NPA-PD-LR) 08/29/2006 E-Mail Auluck R C, Discussion of fuse 2 316 R, NRC Fwd: Re: [Another] NRC program Pilgrim LRA Audit Review.

DP-00-143 ML062980 Auluck R C, Email: (NPA-PD-LR) 08/29/2006 E-Mail Subbaratnam Discussion of draft 2 317 NRC Fwd: Pilgrim LRA R, NRC RAIs Section 2.5 Scoping &

Screening Review -

Your draft RAI request Dt: 6/27/06.

DP-00-144 ML063000 , - No Known EMAIL: (NPA-PD-LR) 08/29/2006 E-Mail Subbaratnam Draft SER and 570 419 Affiliation Pilgrim SER Input R, NRC/NRR comments DP-00-145 ML062510 Mitchell M A, Request For 08/30/2006 Memoranda Lund A L, Internal RAI from 5 043 NRC/NRR/ Additional Information , Request NRC/NRR/ Vessels and ADES/ On Time-Limited for ADRO/DLR/R Internals Integrity DCI/CVIB Aging Analyses For Additional LRA Branch Division of The Reactor Vessel Information Component Integrity And Internals, Pilgrim (RAI) Office of Nuclear Nuclear Power Reactor Regulation Station, License Renewal Application (TAC NO. MC9669).

Page 28 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-146 ML063000 , - No Known EMAIL:(NPA-PD-LR) 08/30/2006 E-Mail McCaughey Draft SER 577 417 Affiliation Pilgrim SER Input B, - No Known Affiliation DP-00-147 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 08/31/2006 E-Mail Auluck R C, Internal 7 409 R, NRC Fwd: Pilgrim LRA - NRC transmission of RAIs for 4.2, 4.7.1, RAIs 4.7.2.1, and 4.7.2.2 (TLAAs).

DP-00-148 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 09/05/2006 E-Mail Stubbs A, Internal discussion 2 399 R, NRC Fwd: Re: LRA: VY NRC on SER input Section 2.3.3.13 and Pilgrim 2.3.3.14.

DP-00-149 ML063040 Stubbs A, EMAIL: (NPA-PD-LR) 09/05/2006 E-Mail, Pope S, Internal work 66 406 NRC/NRR Pilgrim LRA - RAI Letter coordination for Responses from review of licensee Entergy (NRC responses Contract NRC-03 038, Task Order 24).

DP-00-150 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 09/06/2006 E-Mail Medoff J, Internal discussions 3 394 R, NRC/NRR Re: Fwd: Revision to NRC on writeup for Commitments C-31 Revision to and C-35. Commitments C-31 and C-35 Page 29 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-151 ML063040 Sydnor C R, EMAIL: (NPA-PD-LR) 09/06/2006 E-Mail, Subbaratnam Internal draft Pilgrim 8 395 NRC/NRR Pilgrim TLAA RAIs Request for R, NRC/NRR TLAA RAIs revised revised per the Sept. Additional per the Sept. 6, 6, 2006 conference Information 2006 conference call. (RAI) call DP-00-152 ML063040 Subbaratnam EMAIL: (NPA-PD-LR) 09/06/2006 E-Mail Auluck R, Internal notes on 4 398 R, NRC/NRR Fwd: ATL-NRC NRC/NRR Pilgrim SER input meeting on Pilgrim meeting SER.

DP-00-153 ML063070 Emch R L, EMAIL: (NPA-PD-LR) 09/06/2006 E-Mail Williamson A Comment on and 4 464 NRC Human Health R, NRC revision to Human Section of Pilgrim Health Section of Scoping Summary Pilgrim Scoping Report. Summary Report DP-00-154 ML063070 Hurley B, EMAIL: (NPA-PD-LR) 09/07/2006 E-Mail Williamson A Internal work 2 437 Earthtech, Inc Appendix A, C, and R, NRC assignment G. discussions DP-00-155 ML063060 Emch R L, EMAIL: (NPA-PD-LR) 09/08/2006 E-Mail Benner E J, Human health and 3 382 NRC Training. Franovich R monitoring L, comments and Klementowicz responses for the S P, Luu A, Pilgrim Scoping NRC Summary Report, Page 30 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-156 ML063070 Emch R L, EMAIL: (NPA-PD-LR) 09/08/2006 E-Mail Williamson A Recommendations 4 440 NRC Monitoring R, NRC regarding human Comments. health and monitoring comments and responses for the Pilgrim Scoping Summary Report DP-00-157 ML063070 Luu A, NRC Email: (NPA-PD-LR) 09/13/2006 E-Mail Williamson A Comment on Tritium 2 444 Travel and Tritium R, NRC and Pilgrim Issue.

DP-00-158 ML063120 Stubbs A, NRC EMAIL: (NPA-PD-LR) 09/14/2006 E-Mail Subbaratnam Comments on 2 198 Pilgrim LRA - Chapter R, NRC previous answers to 3 Tables Impacted by RAIs Additional Components Added to Scope as a Result of RAIs.

DP-00-159 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 09/14/2006 E-Mail Buckberg P Status update on 3 451 R, NRC Pilgrim SER - Chapter H, NRC the last chapter 4.0 4.0 Status. SER DP-00-160 ML062990 Subbaratnam EMAIL: (NPA-PD-LR) 09/14/2006 E-Mail Buckberg P Coordination of 2 447 R, NRC Fwd: Pilgrim LRA - H, NRC review Chapter 3 Tables impacted by additional components added to scope as a resu.

Page 31 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-161 ML062980 Buckberg P, EMAIL: (NPA-PD-LR) 09/14/2006 E-Mail Davis J A, Discussion of RAIs 5 594 NRC/NRR Fwd: Pilgrim LRA - NRC Chapter 3 Tables impacted by additional components added to scope as a result.

DP-00-162 ML062980 Subbaratnam EMAIL: (NPA-PD-LR) 09/14/2006 E-Mail Buckberg P Internal status 3 596 R, NRC Pilgrim SER - Chapter H, NRC update on the last 4.0 Status. chapter 4.0 SER which relates to TLAAs.

DP-00-163 ML063060 Emch R L, EMAIL: (NPA-PD-LR) 09/18/2006 E-Mail Hurley R, Luu Internal Peer 4 369 NRC Fwd: Re: Southeast A, Earth Review of the Massachusetts Health Tech, Inc, Southeastern Study [useful info NRC Massachusetts from Senior Technical Health Study expert].

DP-00-164 ML063070 Emch R L, Email: (NPA-PD-LR) 09/18/2006 E-Mail Holahan E V, Internal status of 2 447 NRC Southeast NRC review of health Massachusetts Health study Study.

DP-00-165 ML063110 Stubbs A, NRC Email: (NPA-PD-LR) 09/18/2006 E-Mail Subbaratnam Discussion of RAIs 3 153 Follow Required to R, NRC Applicant RAI Responses.

Page 32 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-166 ML063110 Pope S, ISL, EMAIL: (NPA-PD-LR) 09/18/2006 - No Stubbs A, Internal 3 622 Inc Delivery of Subtask 6 Document NRC transmission of draft Partial Results, RAI Type RAIs plus responses that Applies, E- comments Require Followup, for Mail Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3157, TAC No.

MC9669.

DP-00-167 ML063050 Subbaratnam Email: (NPA-PD-LR) 09/18/2006 E-Mail Buckberg P Discussions of need 2 302 R, NRC Fwd: Follow Required H, NRC for RAIs to Applicant RAI Responses.

DP-00-168 ML062650 Mitchell M A, Pilgrim License 09/18/2006 Final Safety Lund A L, Internal SER from 6 293 NRC/NRR/ Renewal Application Evaluation NRC/NRR/ Vessels & Internals ADES/ Final Safety Report ADRO/DLR/R Integrity Branch DCI/CVIB Evaluation Report (FSER), LRA Division of Sections On The Memoranda Component Integrity Aging Management Office of Nuclear Programs For The Reactor Regulation Reactor Vessel (TAC NO. MC9669)

Page 33 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-169 ML063110 Pope S, ISL, EMAIL: (NPA-PD-LR) 09/21/2006 E-Mail Stubbs A, Internal request re 3 616 Inc Fwd: Re: Pilgrim LRA NRC RAIs for telecon.

Technical Meeting -

Conference Call -

Additional RAI Clarification.

DP-00-170 ML063110 Stubbs A, NRC Email: (NPA-PD-LR) 09/21/2006 E-Mail Buckberg P Discussion of RAI 3 604 Fwd: Re: Pilgrim LRA H, NRC clarification Technical Meeting -

Conference Call -

Additional RAI Clarification.

DP-00-171 ML063070 Franovich R L, EMAIL: (NPA-PD-LR) 09/25/2006 E-Mail Schaaf R G, Questions/revisions 2 458 NRC Questions/Revisions Uttal S L, to the scoping to the Scoping Williamson A summary report for Summary Report for R, NRC Pilgrim Pilgrim.

DP-00-172 ML063050 Subbaratnam Email: (NPA-PD-LR) 09/26/2006 E-Mail Buckberg P Discussions of 3 292 R, NRC Re: Pilgrim A(2) H, NRC review assignments scoping information.

DP-00-173 ML062980 , - No Known EMAIL: (NPA-PD-LR) 09/27/2006 E-Mail Davis J A, Comment on 23 595 Affiliation Re: Section 4.3. NRC UFSAR Supplement evaluation input.

Page 34 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-174 ML062680 Dennig R L, Safety Evaluation 09/27/2006 Memoranda Lund A L, Internal SER from 11 079 NRC/NRR/ Report Regarding the , Safety NRC/NRR/ Containment and ADES/ License Renewal Evaluation ADRO/DLR/R Ventilation Branch DSS/SCVB Application for Pilgrim Report EBA Division of Safety Nuclear Power Systems Office of Station (TAC NO. Nuclear Reactor MC9669). Regulation DP-00-175 ML063050 Subbaratnam E-MAIL: (NPA-PD- 09/27/2006 E-Mail Buckberg P Discussions of SER 2 288 R, NRC/NRR LR) Re: Vessels & H, NRC Inputs Internals Integrity Branch SER Input.

DP-00-176 ML063060 Flynn C, Earth EMAIL: (NPA-PD-LR) 09/28/2006 E-Mail Emch R L, Internal 11 343 Tech, Inc Sections for CRF. Hurley B, Luu transmission of draft A, Earth input Tech, Inc, NRC DP-00-177 ML063060 Flynn C, Earth EMAIL: (NPA-PD-LR) 09/28/2006 - No Emch R L, Draft edits of 14 095 Tech, Inc Section 4.7, 092806 Document Hurley B, Luu Section 4.7 1915H. Type A, Earth Applies, E- Tech, Inc, Mail NRC DP-00-178 ML062710 Weerakkody S Safety Evaluation 09/28/2006 Memoranda Lund A L, Internal SER from 17 173 D, NRC/NRR/ Input Regarding the , Safety NRC/NRR/ Fire Protection ADRA/DRA License Renewal Evaluation ADRO/DLR Branch Division of Application - Pilgrim Report Risk Assessment Nuclear Power Office of Nuclear Station - Fire Reactor Regulation Protection (TAC NO.

MC9669)

Page 35 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-179 ML063060 Hurley B, Earth EMAIL: (NPA-PD-LR) 09/29/2006 E-Mail Emch R L, Comments on 4 165 Tech, Inc Re: Section 4.7, Flynn C, Luu writeup for Section 092806 1915H. A, Earth 4.7 Tech, Inc, NRC DP-00-180 ML063120 Pope S M, ISL, EMAIL: (NPA-PD-LR) 10/02/2006 E-Mail Stubbs A, Transmission of 64 241 Inc Delivery of Subtask 6, NRC Review and Evaluation of RAI evaluation of rai Responses, Update of responses, update the Draft SER Input of Draft ser input with Open Items for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No.

MC9669.

DP-00-181 ML062770 Cranston G V, Safety Evaluation of 10/03/2006 Memoranda Lund A L, Internal SER from 18 446 NRC/NRR/ License Renewal , Safety NRC/NRR/ BWR Systems ADES/ Application for Evaluation ADRO/DLR/R Branch Division of DSS/SBWB Pilgrim. LRA Safety Systems Office of Nuclear Reactor Regulation Page 36 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-182 ML063120 Pope S M, ISL, EMAIL: (NPA-PD-LR) 10/03/2006 E-Mail Stubbs A, Transmission of 63 250 Inc Re: Delivery of NRC word perfect version Subtask 6, Evaluation of the draft SER of RAI Responses, input.

Update of the Draft SER Input with Open Items, for Contract #

NRC-03-03-038, Pilgrim Task Order 24, Balance of Plant Branch, JCN J-3269, TAC No. MC9669.

DP-00-183 ML063070 Palla R L, NRC Email: (NPA-PD-LR) 10/04/2006 E-Mail Fleishman L, Revised 45 419 Pilgrim - Revised Green K, Probabilistic Risk SER. Information Assessment Systems Licensing Branch A Labs, Inc Division of Risk Assessment input DP-00-184 ML062790 Rubin M P, Evaluation of Severe 10/04/2006 Memoranda Franovich R Internal Assessment 38 198 NRC/NRR/ Accident Mitigation , Report, L, NRC/NRR/ of SAMAs from ADRA/DRA/AP Alternatives for Technical ADRO/DLR/R Probabilistic Risk LA License Renewal of EBB Assessment Pilgrim Nuclear Power Licensing Branch A Station. Division of Risk Assessment Office of Nuclear Reactor Regulation Page 37 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-185 ML063060 Flynn C, Earth EMAIL: (NPA-PD-LR) 10/04/2006 E-Mail, Emch R L, Internal 23 344 Tech, Inc FW: PNPS, Revisions Report, NRC transmission of to CRF assigned text. Miscellaneo revisions/

us corrections to draft input DP-00-186 ML063070 Provenzano S, EMAIL: (NPA-PD-LR_ 10/05/2006 E-Mail Williamson A Discussion of use of 4 430 Earthtech, Inc FW: Pilgrim- R, NRC minority / low Minority/Low-Income income tables Tables.

DP-00-187 ML063070 Palla R L, NRC Email: (NPA-PD-LR) 10/10/2006 E-Mail Williamson A Discussions of 2 435 Re: Fwd: FW: Pilgrim R, NRC changes needed LRA Amendment 9 in based on SAMA pdf format. info DP-00-188 ML063070 Palla R L, NRC Email: (NPA-PD-LR) 10/10/2006 E-Mail Williamson A Suggested changes 2 414 Re: SAMA Memo. R, NRC to SAMA telecon memo DP-00-189 ML063070 Emch R L, Email: (NPA-PD-LR) 10/10/2006 E-Mail Flynn C R, comments on PNPS 5 418 NRC Re: PNPS SEIS re Earth Tech, SEIS re Sections Sections 4.2.1 and Inc 4.2.1 and 4.2.2, 4.2.2, Electromagnetic Electromagnetic Effects Effects.

Page 38 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-190 ML063060 Flynn C, Earth Email: (NPA-PD-LR) 10/10/2006 E-Mail, Emch R L, review copy and 8 410 Tech, Inc PNPS SEIS re Environmen NRC request for Section 4.2.1 and tal Impact assessment of SEIS 4.2.2, Statement Sections 4.2.1 and Electromagnetic 4.2.2, Effects. Electromagnetic Effects DP-00-191 ML063070 Flemming J L, EMAIL: (NPA-PD-LR) 10/11/2006 E-Mail Provenzano Internal assessment 3 410 NRC RE: Pilgrim SEIS - S, Earth of Water Use and revised water Tech, Inc Water Quality sections. sections DP-00-192 ML063110 Iqbal N, NRC EMAIL: (NPA-PD-LR) 10/11/2006 E-Mail Buckberg P Comments on 2 156 Re: Ganesh/Naeem H, NRC documentation of

[Revised Sentence on RAI discussions RAIs].

DP-00-193 ML063070 Raymond W J, EMAIL: (NPA-PD-LR) 10/12/2006 E-Mail Williamson A SRI's review of 2 412 NRC/RGN- Re: PNPS Scoping R, NRC pertinent sections of I/DRP/PB5 Summary Report. the scoping report plus comments on public's comment DP-00-194 ML063070 Raymond W J, EMAIL: (NPA-PD-LR) 10/13/2006 E-Mail Powell R J, SRI's assessment of 3 407 NRC/RGN- Reply: Requested NRC public's comment I/DRP/PB5 Documents.

Page 39 of 40

PDP No. Accession Author Name/ Title/Description: Document Document Addressee / Comment Page Number Affiliation: Date Type Addressee Count Affiliation DP-00-195 ML063110 Pope S, ISL, EMAIL: (NPA-PD-LR) 10/16/2006 - No Stubbs A, Transmission of 66 596 Inc Delivery of Subtask 6, Document NRC updated Draft SER Evaluation of revised Type input.

RAI Responses and Applies, E-Update of the draft Mail SER input with Open Items using the Final Pilgrim SER Shell, for Contract # NRC 03-038, Pilgrim Task Order 24, Balance of plant Branch, JCN J-3269...

DP-00-196 ML062900 Mitchell M A, Pilgrim License 10/16/2006 Memoranda Lund A L, Internal SER from 5 196 NRC/NRR/ Renewal Application , Safety NRC/NRR/ Vessels & Internals ADES/ Final Safety Evaluation ADRO/DLR/R Integrity Branch DCI/CVIB Evaluation Report Report LRA Division of Sections on the Aging Component Integrity Management Reviews Office of Nuclear for the Reactor Vessel Reactor Regulation and its Internal Components (TAC NO. MC9669).

DP-00-197 ML063110 , Advanced Audit and Review 11/01/2006 Audit , NRC/NRR/ Draft audit report 563 278 Technologies & Report for Plant Aging Report ADRO/DLR/R Labs Management Reviews LRC International, and Programs Pilgrim Inc Nuclear Power Station Page 40 of 40

November __, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Perry Buckberg, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R.

§ 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.

3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Perry Buckberg Executed in Rockville, MD this __ day of November, 2006

November 15, 2006 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

DECLARATION OF FRANK GILLESPIE I, Frank Gillespie, do hereby state as follows:

1. I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR).

My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.

2. As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the November 15, 2006, submission of the Staffs Hearing File.
3. I have personally reviewed the documents identified as privileged in , and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part

of the deliberative process necessary to the Staffs review of the pending license renewal application.

4. Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
5. Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the November 15, 2006 submission of the Staffs Hearing File.
6. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

Frank Gillespie Executed in Rockville, MD this 15th day of November, 2006

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S.

mail system, as indicated by a double asterisk (**) this 15th day of November, 2006.

Administrative Judge* Administrative Judge*

Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: rfc1@nrc.gov E-mail: pba@nrc.gov Administrative Judge* Office of Commission Appellate

  • Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*

Diane Curran, Esq.** Attn: Rulemaking and Adjudications Staff Harmon, Curran, Spielberg Mail Stop: O-16C1

& Eisenberg, L.L.P. U.S. Nuclear Regulatory Commission 1726 M Street, NW., Suite 600 Washington, DC 20555-0001 Washington, DC 20036 E-mail: hearingdocket@nrc.gov E-mail: dcurran@harmoncurran.com

Atomic Safety and Licensing Board* Terence A. Burke, Esq.**

Mail Stop: T-3 F23 Entergy Nuclear U.S. Nuclear Regulatory Commission 1340 Echelon Parkway Washington, DC 20555-0001 Mail Stop: M-ECH-62 Jackson, MS 39213 Matthew Brock, Esq.**

Assistant Attorney General David R. Lewis, Esq.**

Office of the Massachusetts Attorney Paul A. Gaukler, Esq.

General Pillsbury, Winthrop, Shaw, Pittman, LLP Environmental Protection Division 2300 N Street, NW One Ashburton Place, Room 1813 Washington, DC 20037-1137 Boston, MA 02108-1598 E-mail: david.lewis@pillsburylaw.com E-mail: matthew.brock@ago.state.ma.us paul.gaukler@pillsburylaw.com Molly H. Bartlett, Esq.** Town Manager**

52 Crooked Lane Town of Plymouth Duxbury, MA 02332 11 Lincoln St.

E-mail: mollyhbartlett@hotmail.com Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us Richard R. MacDonald**

Town Manager Sheila Slocum Hollis**

878 Tremont Street Duane Morris LLP Duxbury, MA 02332 1667 K Street, NW, Suite 700 E-mail: macdonald@town.duxbury.ma.us Washington, DC 20006 Fax: 781-934-9011 E-mail: sshollis@duanemorris.com

/RA/

David E. Roth Counsel for the NRC Staff