ML20052B277

From kanterella
Revision as of 21:34, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Updated LER 79-038/99X-1
ML20052B277
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/21/1982
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20052B278 List:
References
MP-2-5131, NUDOCS 8204300248
Download: ML20052B277 (1)


Text

-

u IWMtTHI!Afr IrrII.rrIIES 5

r = lJl' Z 7 " % ".7"" $8?o%7. CONNECTICUT 06101

!.C= ;' %l.'Jll%'"'*"" n m) ses-esii L L J ::"=;":l:: Z"'J llr""

April 21, 1982 MP 5131 Mr. Ronald C. Haynes Regional Administrator, Region I

  • _0 '

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission sP k 631 Park Avenue King of Prussia, Pennsylvania 19406 p HECEfVED; .

Reference:

Facility Operating License No. DPR-65 APR 29 }gg 3 -

Docket No. 50-336 Reportable Occurrence R0-50-336/79-38/3X-1 C #$f;jjQy N

% //

Dear Mr. Haynes:

4 This letter forwards Licensee Event Report 79-38/3X-1 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specification, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operations. This update report provides additional information for the cause of the event. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY E. . Mroczka Station Superintendent Millstone Nuclear Power Station EJM/SS:mo

Attachment:

LER R0-79-38/3X-1 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, Washington, D.C. (3)

U.S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 l

l 8204300 I

l

+ I