Similar Documents at Hatch |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
- - - - -
(.
G
DOCKET NO.80-321 DATE 10-10-80 COSIPLETED BY Pz t undarwood TELEPHONE 112-J6/-/781 OPERATING STATUS
' latch 1 Notes I 1. Unit Name:
- 2. Reporting Period: 9-80 i
- 3. Licensed Thermal Power (Mb ti: 74'26 4'
- 4. Nameplate Rating (Gross SIWE): 809.3 .
- 5. Design Electrical Rating (Net 5tWe): 777.3
- 6. Maximum Dependable Capacity (Gross SIWE): 796.3
- 7. Staximum Dependable Capacity (Net alwe): 764.3
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lesel To which Restricted. If Any (Net SIWE):
- 10. Reasons For Restrictions.If Any:
i 4
This Manth Yr..to.Date Cumulatise
. II. Hours in Reporting Pesiod 720 6575 41639 '
- 12. Number Of Hours Reactor Was Critical 703.5 _' 5593.3 31391.3
- 13. Reactor Resesse Shutdown Hours 0.0 O.0 0.0 4
- 14. Hours Generator On Line 693.0 5153.I 29421.5
- 15. Unit Reserve Shutdown Hours nn 0.0 0.0 j u 16. Gross Thermal Energy Generated _(MWH) 1575954 13588807 61941842-
~ *
- 17. Gross Electrical Energy Gener'sted (SIWH1 509060 _ , _ ,
3784830 20055770 '
- 18. Net Electrical Energy Generated (5tWH) 487132 3606894 10068827
- 19. Unit Sersice Factor 96.2 78.4 70.7
- 20. Unit Availability Factor 96.? 78.4 70.7 )
- 21. Unit Capacity Factor IUsing SIDC Nett 88.5 71.8 s;o . g
- 22. Unit Capacity ' Factor IUsing DER Net) 87.0 70.6 58.9 4
- 23. Unit Forced Outage Rate 3.8 21. 6 _, 20.9
- 24. Shutdowns Scheduled Oser Next 6 Stonths (Type, Date.and Duration of Eacht: .
Refuelino and torus work, 3-1-81. 13 wks.
l'
- 25. If Shut Down At Er.J Of P.eport Period. Estimated Date of Startup:
- 26. Units in Test Status tPrior to Commercial Operationi: Forecast Achiesed I
! =
INITIA L CRITICALITY INITIA L ELECTRICITY l-i Coil \tERCIA L OPER ATION i
l :i i
..L ~~-
t y I.
1 i
a- --x.-..-..-..-
8010210
_ _ ~ _ _
4 2... f _ -
?
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-321 (JNIT Hatch 1 DATE 10-10-80 4 C0\1PLETED BY P. R. Underwood
_ TELEPilONE 912-367-7781 C: MONTil 9-80 -
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL *
(MWe-Net) (MWe. Net i 3 746 751 17 2 744 is 753 3 741 748 19 4 447 20 743 5 429 21 391 6 574 376 22 7 635 23 691 8 622' 24 702 9 743 742 25 to -
753 26 741 11 749 27 731
"' 743 12 23 747 13 582 747 29 14 685 30 745 15 749 _
31 16 751 INSTRUCTIONS On this format. list the nerage daily unit power lese! in MWe Net for each day in the reportmg 14.inth. Compute the nearest whole megawatt.
(0177)
3- ____n.,,, - - .-.
._ . - - ~~ - - -
. ~ '.
DOCKETNo. 50-321 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Hatch 1 .
DATE IU-lU-W t.
COMPLETED BY P R. Underwood REPORT MONTH 9-M TELEPHONE 917-367-77H1 _ ,
~.
- E e
- ,$g "g' *Y3 Licensee E*, *g " . Cause & Corrective No. Daie $ Ti = g 3g& Event u A u?
9u Action to p,,,,,,g,,,,,,,c,
a 3 NA Hil HTEXCil Rx scram due to false high MSR level ,
80-46 800904 F 11.2 A caused by LS being grounded. 4 NA HH HTEXCH Unit on startup ramp from above shut-80-47 800904 'F 53.2 A 5 down, #80-46 12.9 D 5 NA RB CONROD ibduced load to perform rod pattern 80-48 800907 F adjustment NA RB CONROD Reduced load to perform turbine test t 80-49 800912 S 21.6 0 5 and rod pattern adjustment l 1
3 NA ZZ ZZZZZZ Rx scram due to transferring of RPS 80-50 800921 F 15.8 l
bus "B" from alt. to normal and a.
spurious trip on RPS " A" l g
3 4 i, I 2 Exhibit G-Instructions Reason: Method:
, F: Forced for Preparation of Data A liguipment Failure (Explain) 1-Manual S: Scheduled Entry Sheets for Licensee n Maintenance of Test 2 Manual Scram. .
3-Automatic Scram. Event Report ILER) File INUREG- }
C Refueling .
D-Regulatory Restriction 4 -Continuations 0161) 1 E-Operator Training & Ucense Examination 5-Ioad Ibduction i 5
' F-AdministrasIve 9-Other (Explain) Exhibit I- Same Source G-Operational Errot (Emplain) *
(9/77) liether(Emplain)
. . j 1
i !
w y
DOCKET NO. 50-371 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Hatch 1 .
DATE 10-10-R)
COMPLETED BY P. R. (Indervood REPORT MONTH 9-80 T1ELEPliONE 912-367-7781 "t.c c Cause & Corrective l Eg Nie. Date h
.!"E 38
}= }.
m , se Licensee Event g,7 E3 A3"" '"
Prevent Recurrence i
mE' g H
$5 a'l j4c R* Port #
5 ftA ZZ ZZZZZZ Unit on startup ramp from above shut-80-51 800921 F 14.0 down, #80-50 ,
RB C0flROD ibduced load to perform a rod pattern 80-52 800923 F 4.0 D 5 f1A adjustment ftA WA FILTER Reduced load due to debris stopping !
80-53 800927 F 1.0 B 5 '
up PSW strainers
[
1 l j '
i i
3 4 I 2 Exhibit G-Instructions 1 Method:
F: Forced Reason 1-Manual for Pseparation of Data S: Scheduled A-L iui ment Failure (Explain) Entry Sheets for Licensee B4taintenance of Test 2-Manual Scram.
3 Automatic Scram. Event Repost (LER) Fde INUREG-C Refueling .
0161)
D Regulatory Restriction 4 -Continuations E-Operator Training & Ucense Examination 5-Ioad Reduction 5 t F Administrative 9-Other (Explain) Exhibit I Same Source GOperational Error (Emplain)
- l (9/77) 11Osher(Explain)
)
a 1 3
~
NARRATIVE REPORT UNIT 1 Sept. 4th Rx scram at 14:39 due to false high MSR level; scram ' caused by equipment failure of the LS on the MSR; LS was grounded Sept. 4th Startup from above shutdown, #80-46; Rx critical at 20:55, and generator on line at 01:49 on Sept. 5th.; unit -returned to 80% conditions at l
07:00 on Sept. 7th c
_q-Sept. 7th Reduced load in order to perform final rod pattern adjustment from above startup; unit returned to 80% conditions at 12:00 on Sept. 8th Sept. 12th Redu*ed load in order to perform weekly turbine tests and rod pattern adjustment; unit returned to 80% conditions at 21:30 on Sept. 13th i
Sept. 21st Rx auto scram at 12:53 due to the transferring of RPS channel "B" bus from alt to normal and a l spurtous trip on RPS channel "A"
. Sept. 21st Startup from above shutdown, #80-50; Rx critical at 23:05,- and generator on line at 04:44 on Sept. 22nd; unit returned to 80% conditions at t ;
3 18:45, Sept. 22nd ,
Sept. 23rd Reduced load in order to perform a rod pattern adjustment; unit returned to 80% conditions at 02:45 on Sapt. 24th Sept. 27th Reduced load due to debris 4
stopping up PSW strainers
- There was no single ' release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual-values during September of 1980.
t
-1 e
4
-%g $ $4lh us & %WMMP*M S M MOW >
8lBP_
- HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE-REPORTED FOR' SEPTEMBER 1980 NUMBER DATE COMPLETED DESCRIPTION 50-4447 6-26-80 Calibrated pressure switch on HCU 80-4188 8-28-80 Replaced CRD HCU pressure switch isolation valves; valves were suspected of leaking 80-4187 8-28-80 Replaced CRD HCU pressure switch g isolation valves; valves were suspected of leaking l 80-4186 8-28-80 Replaced CRD HCU pressure switch j isolation valves; valves were i suspected of leaking 80-4178 8-28-80 Replaced CRD HCU pressure switch isolation valves; valves were suspected of teaking j 80-4312 8-19-80 3/4" "B" core spray discharge test connection was found to have cracked between the nipple and j-the 3/4" valve. Replaced old pipe with new piece of pipe 80-4495 8-29-80 Snubber was found- to havc a seal l 1eak; replaced leaking snubber' with new snubber 80-4507 8-29-80 Snubber was found to have a seal
'g leak; removed snubber and rebuilt with all new parts; replaced snubber after being rebuilt 80-04429 8-28-80 Snubber was found- to be leaking fluid; replaced leaking snubber with new snubber l 80-4430 8-28-80 Snubber was .found to be leaking
! fluid; replaced leaking snubber j with new snubber l 80-4486 9-1-80 Replaced- fire detector and-j calibrated I
80-3988 8-29-80 Relocation of #2 fire pump controller D
.T k-
- N+f 5 %* &f #4%d OO %% O WM = - bE i W D -
'