Category:CORRESPONDENCE-LETTERS
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L0911990-09-12012 September 1990 Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees ML18009A6581990-09-11011 September 1990 Submits Addl Info Re Use of Hafnium Control Rods at Facility.All Rods Will Be Removed During Spring 1991 Outage ML20059H4181990-09-0606 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-400/90-13.Corrective Action:Changes to EST-717 in Area of Power Normalization Under Study for Past Several Months ML17348B4941990-08-30030 August 1990 Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML20059D3511990-08-30030 August 1990 Forwards Decommissioning Financial Assurance Certification Rept Submitted by North Carolina Eastern Municipal Power Agency ML18009A6261990-08-10010 August 1990 Informs That Action Committed to in Response to Generic Ltr 88-14, Instrument Air Supply Sys, Completed ML18009A6241990-08-0303 August 1990 Forwards Addl Info Re Operator Action Times Assumed in Steam Generator Tube Rupture Analyses for Plant,Per 900712 Telcon ML18009A6081990-07-31031 July 1990 Forwards Plan for Shearon Harris Nuclear Power Plant Emergency Exercise - 900919, Per NRC Request.W/O Encl ML20055J4171990-07-30030 July 1990 Forwards Rev 5 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20055F9431990-07-12012 July 1990 Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices ML18009A5991990-07-0606 July 1990 Comments on Electrical Distribution Sys Functional Insp Rept 50-400/90-200 on 900212-0316.Seismic Qualification Package Subsequently Upgraded to Include Qualification Info Based on Receipt of Part 21 from Transamerica Delaval ML18009A5851990-06-28028 June 1990 Advises That Emergency Preparedness Exercise Scheduled on 900919.Exercise Will Consist of Simulated Accident at Plant Site & Will Involve Planned Response Actions.Objectives to Be Fulfilled Encl ML18009A5621990-05-30030 May 1990 Responds to NRC 900504 Ltr Re Violations Noted in Insp Rept 50-400/90-06.Corrective Actions:Procedures OST-1008 & OST-1108 Revised to Delete Stroke Testing of Valve 1ST-359 on Quarterly Basis ML18009A5141990-05-0303 May 1990 Forwards Eddy Current Exam CP&L Shearon Harris Nuclear Power Plant Steam Generators A,B & C, Providing Results of Inservice Insps Performed During Plant Second Refueling Outage in Oct 1989 ML18009A4941990-04-26026 April 1990 Forwards Radiological Environ Operating Rept,1989, Radiological Environ Operating Rept,Vol II,Jan-June 1989, Sample Analyses Data & Radiological Environ Operating Rept,Vol III,Jul-Dec 1989,Sample Analyses Data. ML18009A5031990-04-25025 April 1990 Submits Suppl 2 to Relief Request R2-001 Re Plant 10-yr Inservice Insp Plan,Per 880129 Request ML18009A4911990-04-24024 April 1990 Forwards Addl Info Re Proposed Wakesouth Regional Airport to Be Located Near Facility,Per 900411 Request.Info Previously Provided to NRC During 900320 & 23 Telcons ML18009A4841990-04-24024 April 1990 Forwards Corrected Bases marked-up Page to 900226 Tech Spec Change Request Re Surveillance Intervals ML18009A4251990-03-30030 March 1990 Submits Supplemental Response to Station Blackout Rule Based on Guidelines Provided in NUMARC 87-00, Guidelines & Technical Bases for NUMARC Initiatives.... No Changes to Previous Calculations Necessary & One Deviation Noted ML18009A4231990-03-29029 March 1990 Suppls Response to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Actions:Surveys Performed to Determined Extent & Level of Contamination & Personnel Involved Decontaminated ML18009A4111990-03-23023 March 1990 Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-400/90-02.Corrective Actions:Personnel Involved W/ Quadrant Power Tilt Ratio Calculations & Operability Determination Counseled ML18009A4121990-03-23023 March 1990 Forwards Rev 17 to PLP-201, Emergency Plan & Fission Product Barrier Analysis.Rev to Emergency Plan Incorporates Comments Received During Recent Licensed Operator Requalification Training in Emergency Plan Procedures ML18009A4151990-03-22022 March 1990 Responds to NRC SALP Rept for Jul 1988 - Nov 1989.Contrary to Statement in Rept Significant Amount of Refresher Training Was Conducted During SALP Assessment Period Including Termination & Splicing & Motor & Bus Relays ML18009A4081990-03-19019 March 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Rept 50-400/90-01.Corrective Actions:All Calibr Required by Tech Specs for Power Range Nuclear Instrumentation Satisfactorily Completed ML18022A7891990-03-0909 March 1990 Forwards Vols 1 & 2 of Inservice Insp Summary 1st Interval 1st Period,2nd Refueling Outage Completed 891222. ML18022A7881990-03-0606 March 1990 Confirms Understanding of Status of NRC Activities Re Proposed Wakesouth Regional Airport Located Near Plant Site. Pending Issues Should Be Resolved by 900331 to Enable Util to Complete Negotiations W/Airport Authority ML18022A7851990-03-0202 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-400/89-34.Corrective Actions:Valve SI-332 Closed & Gravity Drain Path Isolated & Shift Foreman Required to Review MMM-012 Re Priority/Emergency Maint Work Control ML18022A7721990-02-26026 February 1990 Forwards Application for Amend to License NPF-63,revising Tech Spec Surveillance 4.0.2 to Permit Surveillances to Be Extended Up to 25% of Specified Interval & Removing 3.25 Limitation from Spec,Per Generic Ltr 89-14 ML20011F3821990-02-26026 February 1990 Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices ML18022A7701990-02-14014 February 1990 Notifies of Issuance of Renewal of NPDES Permit for Plant. Permit Encl ML18009A3831990-02-0909 February 1990 Responds to 900112 Ltr Re Violation Noted in Insp Rept 50-400/89-35.Corrective Actions:Valves ICS-775 & ICS-776 Added to Inservice Insp Program for Back Seat & Full Flow Testing & ICS-525 Revised to Satisfy Tech Spec Requirements ML18009A3751990-02-0101 February 1990 Forwards Retyped Tech Spec Pages Re 890630 Application for Amend to License NPF-63 Concerning RCS Pressure Temp Limits ML18009A3701990-02-0101 February 1990 Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301 IR 05000400/19890281990-02-0101 February 1990 Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301 ML18009A3631990-01-26026 January 1990 Responds to NRC Bulletin 88-008, Thermal Stratification in Piping Connected to Rcs. Design Differences That Either Minimize Potential of Occurrence or Enhance Possibility of Detection Should Scenario Be Created at Plant Determined ML18009A3531990-01-25025 January 1990 Forwards Reactor Containment Bldg Integrated Leak Rate Test Conducted in Oct 1989.Util Believes That Packing Leaks Discovered Are Isolated Failures & That Repair Should Prevent Recurrence ML18009A3501990-01-22022 January 1990 Forwards Revised Tech Spec Table 3.7-6, Area Temp Monitoring, Per 891218 Tech Spec Amend Request ML18022A7591990-01-17017 January 1990 Submits Results of Aircraft Hazards Study Associated W/ Proposed Wakesouth Regional Airport & Facility ML20005G5731990-01-16016 January 1990 Forwards Response to Insp Rept 50-400/89-32.Encl Withheld (Ref 10CFR73.21) ML18009A3351990-01-0505 January 1990 Forwards Rev 16 to Vol 1,Part 2 of Plant Operating Manual PLP-201, Emergency Plan. Revised NUREG-0654 Comparison W/ Plant Emergency Action Level Flow Path Also Encl for Review ML18009A3171989-12-21021 December 1989 Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-21.Corrective Actions:Incident Reviewed by Both Plant & Nuclear Engineering Dept Personnel to Avoid Future Miscommunication ML18009A3181989-12-15015 December 1989 Forwards Retyped Amend Bar Pages to Tech Spec Table 3.3-3 Re Auxiliary Feedwater Manual Initiation,Per 891026 Application for Amend to License NPF-63 ML18009A3011989-12-15015 December 1989 Forwards Proprietary WCAP-12403 & Nonproprietary WCAP-12404, LOFTTR2 Analysis for Steam Generator Tube Rupture W/Revised Operator Action Times for Shearon Harris Nuclear Power Plant. WCAP-12403 Withheld (Ref 10CFR2.790(b)(4)) ML18022A7371989-12-13013 December 1989 Forwards Change 3 to Rev 2 to State of Nc Emergency Response Plan in Support of Shearon Harris Nuclear Power Plant, Incorporating Administrative Enhancements. W/One Oversize Encl ML18009A2971989-12-0808 December 1989 Responds to NRC 891108 Ltr Re Violations Noted in Insp Rept 50-400/89-23.Corrective Action:Min of Four Decontamination Personnel Will Be Assigned 24 H Per Day During Fuel/Cask Handling to Maintain Cleanliness in Fuel Handling Bldg ML18009A2841989-11-30030 November 1989 Forwards Rev 0 to Core Operating Limits Rept in Support of Cycle 3 Operations ML18005B1531989-11-27027 November 1989 Forwards Retyped Amend Bar Pages to 890630 Request for Rev to License NPF-63 Re RCS pressure-temp Limits ML18022A7311989-11-27027 November 1989 Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements. ML18005B1511989-11-17017 November 1989 Forwards 15-day Special Rept Identifying Number of Steam Generator Tubes Plugged During Current Inservice Insp Period ML18005B1501989-11-13013 November 1989 Suppls 890403 Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Addl Nontraceable Molded Case Circuit Breakers (MCCB) & MCCBs Traceable to Refurbishers Noted During Records Review 1990-09-06
[Table view] |
Text
TBHBUTION DEMON WTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9001250346 DOC. DATE: 90/01/17 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CUTTER,A.B. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits results of aircraft hazards study associated w/ I proposed Wakesouth regional airport & facility.
D' DISTRIBUTION CODE A001D COPIES RECEIVED LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400
/
RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 D BECKER,D 5 5 1' -D INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E '1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS1 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELPUS TO REDUCE WASTEI CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25
0 '
F
CML Carolina Power & Light Company P.O. Box 1551 ~ Raleigh, N.C. 27602 JAN 1 7 1990 A. B CUTTER SERIAL: NLS-90-012 Vice President Nuclear Services Department United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 WAKESOUTH REGIONAL AIRPORT Gentlemen:
Carolina Power 6 Light Company hereby submits the results of an aircraft hazards study associated with the proposed WakeSouth Regional Airport and the Shearon Harris Nuclear Power Plant. As discussed in a meeting with the NRC staff on December 21, 1989, this information is being submitted under oath and affirmation.
Please refer any questions regarding this submittal to Mr. John Eads at (919) 546-4165.
Yours very trul A. B. Cutter JHE/jhe A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light:
Company.
Notary (Seal)
\lit'5111lrgrr My commission expires: 4" 7 g3 cc: Mr. R. A. Becker Mr. S. D. Ebneter Mr. J. E. Tedrow PU
( 9001250346 900ii7 PDR ADOCK 05000400 P PDC rie111111111
\
Carolina Power & Light Company WAKESOUTH REGIONAL AIRPORT AIRCRAFT HAZARDS STUDY
INTRODUCTION BACKGROUND INFORMATION ORIENTATION OF AIRPORT CONCLUSION OF ANALYSIS
HARRlS PIAHT f/
j.8 Mi J
PROPOSED RUNWAY LOCATION SCALE.: 1" = APPROX. 4000' 4000 8000 12,000
P Abbreviations Used in Presentation GAMA General Aviation Manufacturers Association AOPA Aircraft Owners 8 Pilots Association FAA Federal Aviation Administration NTSB National Transportation Safety Board GA General Aviation WSRA WakeSouth Regional Airport SRP Standard Review Plan
PRESENTATION OUTLINE I. Standard Review Plan 3.5.1.6 "Aircraft Hazards"
-Acceptance Criteria
-Prove by:
II. Impact Evaluation & Probability Equation
-SRP Evaluation Method
-Probability Equation
-Results
-NUS Review & Concurrence III. Probability Equation Factors IV. Methodology Overview V. Case-by-Case Analysis of Factors
- 1. Target Area
- 2. Crash Rate
- 3. Number of Operations Vl. Probability Calculation Vll Fire Analysis
~
VIII Conclusion
~
IX . Analysis Conservatisms & Considerations
STANDARD REVlEW PLAN Acce tance Criteria: Probability of Radiological Release exceeding Part100 exposure guidelines resulting from aircraft accidents is less than 1.0E-7/year.
Note: We assume "accident" implies both impacts and fires.
~Pb:
- 1. Showing probability of structural damage to safety related structures due tc ~irn acts is less than 1.0E-7/year.
(Conservatism: Only a very low percentage of structurally damaging crashes would result in Part 100 releases.)
- 2. Assessing that potential fires do not adversely affect safe shutdown capability of plant nor radioactive release probability.
II.
IMPACT EVALUATION PROBABILITYE UATION SRP Evaluation Method SRP Proximity Criteria is NA (Plant is less than 5 miles away)
SRP Evaluation Criteria lll.3 was used Civilian 8 Militar Air orts ei- orts actuation from iii.3 to calculate probability, P P = (Crash Rate X (Number of Movements X (Effective Plant per sq mi per year) Target Area) per movement)
P = (C) (A)
P = Sum of [Cx NxA] (For all a licablet esof aircraft)
SRP states that interpretation of factors may vary because of specific conditions or changes in accident statistics.
Analysis performed at)0-year projection from WSRA Master Plan RESULTS'robability of Potentially Damaging Impact < 1.0E-7 per year (Probability is also ( 1.0E-7 per year at 20-year projection)
REVIEW:
NUS (D.G. Eisenhut & E.R. Schmidt) reviewed & concurred with methodology, assumptions, & results.
~
~
PROBABILITYE UATION FACTORS C - Crash Rate o Only fatal crash data used (pilot control factor) o Depends on, type of aircraft o Depends on window of data collection N- Number of Movements or 0 erations (ie, take-offs + landings) o Divided by type of aircraft LATED t4 o Depends on size of impacting aircraft o Used tornado missile analysis for comparison Calculation becomes complex
-Factors are inter-related P
-Methods of data collection change over time
-Types of data collected change over time
-Necessity to "dissect" available data
IV.
METHODOLOGY OVERVIEW Im act Probabilit TARGET AREA SRP Safety-related structures are included in Target Area Resistance to impacts determined using tornado missile analyses
-Penetration & "Equivalent Dead Load" failur'e modes considered
-Planes < 8000 Ib do not exceed dead load nor penetration criteria
-Planes between 8,000 & 12,500 Ib may exceed dead load criteria for most buildings; penetration criteria not exceeded
-Planes > 12,500 Ib are assumed to cause structural damage to any building NUIVIBER OF OPERATIONS Value for each type of aircraft taken from Master Plan CRASH RATE SRP value is from 1964-68; is for ALLGeneral Aviation combined Derived new crash rate values based on: 1985-87 data Type/weight of plane Calculated Annual Impact Probability With SRP Equation and New Factors
V.
CASE-BY-CASE ANALYSIS OF FACTORS TARGET AREA Dependent on
- 1. Surface area
- 2. Structural strength Plant Structures Included in Evaluation
-Waste Processing Bldg
-Fuel Handling Bldg
-Reactor Auxiliary Bldg
-Containment
-Condensate Storage Tank
-Control Bldg
-DG Bldg
-Underground, hardened DG Fuel Oil Storage Tanks
-Emergency Service Water Screening Structure
-Emergency Service Water Intake Structure
TARGET AREA (CONT'D)
Calculations Assum tions
-Plan view areas of structures calculated
-Calculated area increased to account for skid & shadow/impact angle effects
-No credit for shadow shielding by Containment
-Shielding of walls by adjacent structures is considered
-All impacts assumed to occur at 90 degrees to impacted surface
-Tornado missile analysis used to assess aircraft impact damage potential
-Both failure modes (puncture & equivalent dead load) were considered
-Target area varies due to aircraft wgt/velocity & building strength
TARGET AREA (CONT'D)
Structural Anal sis Results Target Area for aircraft below 8,000 Ib = ZERO Target Area for aircraft between 8,000 & 12,500 Ib = 0.00708 sq mi Target Area for aircraft over 12,500 Ib = 0.00792 sq mi Difference in areas is because 0.00084 sq mi is OK for all aircraft below 12,500 Ib tie, Containment (13,266 sq ft) + 10,000 more sq ft]
Other PWR studies have target area = 0.005 sq mi
V. CASE-BY-CASE ANALYSIS OF FACTORS 2.
CRASH RATE SRP Crash rate for GA at 4-5 mi. = 1.2E-8 crash per sq. mi. per op'n.
(crash/sm/op)
Basis for SRP Data This value originated from Time Period: 1964-1 968 Total fatal crashes = 2993 Total GA operations = 3.2E+ 8 Current data (from FAA & NTSB): 1985-87 window Total fatal crashes = 1275 Total GA operations = 2.44E+8 Ratio values and 'pro-rate'er SRP Table yields 6.7E-9 crash/sm/op (For overall GA population)
[NOTE: Current Data is 45% lower than SRP Data]
~ ~
CRASH RATE (CONT'D)
Dissection of General Aviation CRASH RATE DATA Aircraft over 12 500 Ib Another data source (Boonin, 1966-70) gave overall GA crash rates nearly identical to SRP Boonin divided data into two aircraft types (by weight)
First category is GA over 12,500 Ib Second category is GA under 12,500 Ib For aircraft over 12,500 lb at 4.3 mi, crash rate is 7.5 times lower than overall GA population Therefore, Crash rate for aircraft over 12,500 Ib = 8.9E-10 crash s mi o
CRASH RATE (CONl"D)
Aircraft between 8000 and 12 500 lb Discussions with GAMA, AOPA, FAA, NTSB, consultants, GA pilots Very similar features to aircraft over 12,500 Ib BETTER PILOTS & BETTER AIRCRAFT
-High cost of purchase
-Cost of insurance
-Corporate ownership
-Business purposes
-More experienced pilots
-Commercial License (req'd if "fly for pay")
-250 hours vs 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> for private license
-Instrument rating required
-Conscientious maintenance
-Better instrumentation, navigation equipment
-Better communication equipment Crash Rate should be similar to aircraft over 12,500 Ib (Factor = 7.5)
Conservatively, a factor of 4.0 was selected (compared to overall GA)
Therefore, Crash rate for aircraft between 8000 and 12,500 Ib =
1.68E-9 crash s mi o
V. CASE-BY-CASE ANALYSIS OF FACTORS 3.
NUMBER OF OPERATIONS Based Aircraft 1988 ~5- r ~10- r ~20- r SE1-3 PL 17 23 29 38 SE4+ PL 31 42 52 71 ME Piston < 12,500¹ 17 24 31 42 ME Piston > 12,500¹ 2 ME TP > 12,500¹ 2 3 Corp. Jet > 12,500¹ 'i 2 Helicopter 2 2 Number of operations per based aircraft 650 700 750 800 per year Annual 0 erati n (calculated from above) 1988 ~5- r ~10- r ~20- r SE1-3 PL 11,050 12,100 21,750 30,400 SE4+ PL 20,150 29,400 39,000 56,800 ME Piston < 12,500¹ 11,050 16,800 23,250 33,600 ME Piston > 12,500¹ 700 750 1)600 ME TP > 12,500¹ 700 'i,500 2,400 Corp. Jet > 12,500¹ 750 1,600 Helicopter 650 700 'i,500 1,600 Source of D t: "Master Plan for the WakeSouth Regional Airport,"
dated October, 1987 prepared by Hobbs, Upchurch, & Associates, P.A.
in Southern Pines, NC.
~4bt I SE Single Engine PL Place (ie, No. of seats)
ME Multiple Engine TP Turbo Prop
¹ Weight in pounds
NUMBER OF OPERATIONS CONT'D MEP between 8000 and 12 500 Ib Discussions with knowledgeable individuals (GAMA, FAA, NTSB, AOPA, pilots) conservatively indicate that less than 15% of MEP <12,500 Ib P
are >8,000 lb.
At 10 year projection (Master Plan),
Number of Operations for 8000< MEP <12,500 Ib =
(.15) x (23,250) = 3 488 Other Cate pries Number of Operations for MEP > 12,500 Ib 750 for ME TP > 12,500 Ib 1,500 for Cor Jet > 12 500 Ib 750 Subtotal for all aircraft > 12,500 = 3 000
Vl.
PROBABILITYCALCULATION For aircraft > 12 500 Ib Cx NxA =
(8.9E-1 0) (3,000) (0.00792) = 2.11E-8 crashes r For aircraft between 8 000 & 12 500 Ib CxNxA=
(1.68E-9) (3,488) (0.00708) = 4.15E-8 crashes r Total Potentiall Dama in Crash Probabilit = 6.26E-8 er ear LESS THAN SRP ACCEPTANCE CRITERIA OF 1.0E-7 er ear
Vll.
FIRE ANALYSIS Basis o Effects of fire associated with structural damage are already included o Fire analysis evaluated impact of aircraft that cause no structural damage Analysis Performed by CP&L Nuclear Engineering Department Items Assessed
-Potential Release of Stored Chemicals
-HVAC Inlets/Ingestion of Burning Fuel Review conducted with Reference 3 of SRP 3.5.1.6 as guidance "Appraisal of Fire Effects from Aircraft Crash at Zion Power Reactor Facility" Chemicals Nitro en Stora e Effects bounded by SRP reference and FSAR Section 2.2.3.3 "Design Basis Toxic Chemicals" HVAC Inlet Features Disclosed no vulnerability to ingestion CONCLUSION No Problems Identified
Vill.
CONCLUSION CONCLUSION: SRP Acce tance Criteria are met IMPACT PROBABILITYis < 1.0E-7 per year at 10-year projection (also at 20-year projection)
FIRE ANALYSIS No effect on radioactive release probability nor on safe shutdown capability.
IX.
UALITATIVECONSERVATISMS IN ANALYSIS 8r. OTHER CONSIDERATIONS '
Conditional probability of radioactive release exceeding Part 100 given an impact is assumed to be 1.0 o Pilot Control o 90 degree impact angle o Master Plan Growth Rate Higher than FAA o Larger Aircraff Take-off & Landing Pattern o Simultaneous Crash and Need for Emergency Equipment o SRP Acceptance Criteria is Stringent
)
t~~
e
FUTURE CONTROL o Potential Administrative Controls o Restrictive Covenants will be incorporated into the Deed of Transfer to assure primary assumptions in the CP &L analysis remain valid.
0 j
~ 5
~O A
1 l