ML19249C093

From kanterella
Revision as of 02:06, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Semiannual Monitoring Rept for Jan-June 1979
ML19249C093
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/29/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19249C094 List:
References
NUDOCS 7909070405
Download: ML19249C093 (1)


Text

I Wisconsin Electnc ecara couei <

231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 August 29, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555

Dear Mr. Denton:

DOCKET NOS. 50-266 AND 50-301 SEMIANNUAL MONITORING REPORT POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 Enclesed herewith are forty copies of the Point Beach Nuclear Plant Units 1 and 2 Semiannual Monitoring Report for the period from January 1 to June 30, 1979. This report is submitted in accordance with Technical Specification 15.6.9.3.C and contains information regarding plant releases, new fuel receipts, environmental radiological monitoring, and leak testing of sources during the reporting period.

Very truly yours, V.

  • trw -

C. W. Fay, Director N clear Power Department Enclosures 1

3r.00l 5@

7 00007 0 yoS