Supplements 790515 Response to IE Bulletin 79-03.All Youngstown Welding & Engineering Co Welded Pipe Being Used or Planned for Use in safety-related Pipe Spools Has Had 100% X-ray of Longitudinal Seam Weld
ML19253A685
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/02/1979
From: Counsil W
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AEC-MP3-190, NUDOCS 7909100672
Download: ML19253A685 (2)


Text

^

,, > -fA MOR'ITIIIAST ITTII.rTIIIS w a,.eem o v a* ==. cr-a- P O. BOX 270 3 7,$"" Z E Q HARTFCao, CONNECTICUT 00101 l m.,.-.-

m 66wn L ' s  :::=:===

WILUAM G. COUNSiL VtCE PRESCENT

    • UCLEAR ENGWEERiPeG ANO OPERATONS August 2,1979 United States fluclear Regulatory Conmission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 ATTil: Mr. B. H. Grier, Director Docket No. 50-423 AEC-MP3-190 Gentlemen:

SUBJECT:

Millstone Unit No. 3 I.E. Bulletin No. 79-03

References:

(1) B. H. Grier letter to W. G. Counsil dated March 12, 1979.

(2) W. G. Counsil letter to B. H. Grier dated May 15, 1979 (AEC-MP3-181).

In Reference (1) the subject I.E. Bulletin was transmitted to Northeast Nuclear Energy Company with appropriate action requested. A summary of the results of the investigation was transmitted to the NRC in Reference (2) noting that in several areas the investigation continued. A summary of the results of the investigation, now complete in all areas, can be found in Attachment 1 entitled Results of Investigation into NRC I.E. Bulletin 79-03.

Very truly yours, NORTHEAST NUCLEAR Ef!ERGY COMPAilY William G. Counsil Vice President Nuclear Engineering & Operations Attachment cc: Nuclear Regulatory Comission Office of Inspection and Enforcement Ditision of Reactor Operations Inspection Washington, D. C. 20555 O.,,.,4'

  • M" 7909100 9 2

i Results of Investigation into NRC. I.E. Bulletin 79-03 g

ATTACHMEtlT 1 Vendor / Purchaser System Results/ Comment

1) Westinghouse Reactor Coolant System No welded pipe supplied L/ Youngstown Welding and Engineering Company used on this order.
2) Stone & Webster Various - Saf" y Related flo welded pipe supplied by Youngstown Welding Construction Systems - Random Spools and Engineering Company used on these orders.

Purchase Orders

3) Tubeco, Inc. (M-150) Various - Safety Related Although substantial quantities of welded pipe Systems from Youngstown Welding and Engineering Company has been or will be used in the fabrication of Unit 3 safety-related pipe spools, all of the material involved have had 100% x-ray of the longitudinal seam weld and therefore are con-sidered acceptable.
4) 30uthwest Fabrication Various - Safety Related Although quantities of welded pipe from Youngstown and Uelding Company Systems Welding and Engineering Company has been or will be used in the fabrication of Unit 3 safety-related pipe spools, all of the material involved have had 100% x-ray of the longitudinal seam weld and therefore are considered acceptable.

'9 h 5) Miscellaneous Orders flo welded pipe of the type described in I.E. Bulletin M In Ubich Vendor May 79-03 supplied by Youngstown Welding and Engineering b Have Supplied Pipe Company used on these orders.

g s.s