ML19296B389

From kanterella
Revision as of 14:05, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-001/03L-0
ML19296B389
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/11/1980
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19296B390 List:
References
MP-2-4287, NUDOCS 8002200496
Download: ML19296B389 (1)


Text

.

li!012TM]!lMIT 18T0.1T515!i 1

w1a 5555555E i$[5S """"' '

< == ==:=

Mr. Boyce H. Grier February 11, 1980 Director, Region I MP 4287 Office of Inspection and Enforcement U. S. liuclear Regulatory Comaission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License fio. DPR-65 Docket tio. 50-336 Reportable Occurrence R0-50-336/80-01/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-01/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, J~

. F.C3 Opeka Station Superintendent

,,, Millstone riuclear Power Station JF0:JLC:cp

Attachment:

LER 80-01/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, Washington, D.C. (3) 800220(