ML19325E990

From kanterella
Revision as of 01:27, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs,Deleting 3.25 Limit from Spec 4.0.2,per Generic Ltr 89-14 Re line-item Improvements in Tech Specs - Removal of 3.25 Limit on Extending Surveillance Intervals
ML19325E990
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1989
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19325E985 List:
References
GL-89-14, NUDOCS 8911130150
Download: ML19325E990 (2)


Text

I I

. . )

APPLIQABILITY SURVEILLANCE RinEREME2HS l

4.0.1 Surveillance Requinsnents shall be applicable during the OPERATIONAL j M300S or other conditions specified for iniividtnl Limiting conditions for ~

Operation unless otherwise stated in an individual Surveillance Requirement.

4.0.2 Eacti Surveillance Requirement shall be performed within the specified j time interval with a maxinun allowable extensior, not to eM 25% of the '

surveillance interval, l

l l

4.0.3 Performance of a Surveillance Requirement within the specified time interval shall constitute ocmpliance with OPERABILITV requiruments for a Limiting Condition for Operation and associated Action statements unless otherwise required by the specification. Surveillance Requirements do not have to be perfoned on incperable equipnent.

4.0.4 Entry into an OPERATIONAL 100E or other specified applicability coniitions shall not be mMe unless the Surveillance Requirement (s) associated with the Limiting coniition for Operation has been performed within the stated surveillance interval or as otherwise specified.

4.0.5 Surveillance Requirements for inservloe inspection and testing of ASME code class 1,2, and 3 wigwnts shall be aplicable as follcus: i

a. Ibr the time period frun issuanoe of the Facility Operating License to the start of facility comercial cperation, inservice testing of ASME Code Class 1,2, and 3 punps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel code 1974 Diition, and Adderda through Sumer 1975, except where speciffc written relief has been granted by the Ocanission.
b. For the time period folicwing start of facility cannercial operation, inservice inspection of ASME code Class 1,2, and 3 wiWwnts and inservice testing of ASME Code Class 1,2, and 3 punps and valves shall be perfarmed in accordance with Section XI of the ASME Boiler and Pressne Vessel Code and applicable Addenia as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been '

l granted by the rW=nimaion pursuant to 10 CFR 50, Section

! 50.55a(g) (6) (i) .

CRfSTAL RIVER - LNIT 3 3/4 0-2 Amentient No.

$T11130150 syju3; rDR ADOCK 05000302 P PDC

1 i

APPilCABIllTY l

BhSES '

i subsystaans, trains, cruponents and devices sqplied by the inoperable normal I pwar sources, both of the offsite cirulits, would also be inoperable. This  !

sculd dictate invoking the agplicable AcrIm statanents for eat of the i applionble D:Ds. However, the prtwisions of Specification 3.0.5 permit the l time limits for centinand cperation to be consistent with the AcrIm statament ,

for the inoperable nonnal power sources instead, prtwided the other specified  !

oorditions are satisfied. In this case, this would mean that for one division  !

the asner9ency power scuros must be OPERABIZ (as must be the a.ir< wits supplied l by the amargency power source) ard all redundant systems, subsystems, trains, r

+-sis and devions in the other division must be OERABIE, or likewise  !

satisfy Specification 3.0.5 (i.e., be capable of performing their design i functions and have an amargency power source ORRABIE). In other words, both i emergency power sources must be ORRABIE ard all redundant systans, subsystems, tra. ins, wi its and devices in both divisions must also be OPERABII. If  ;

these corditions are not satisfied, shutdown is required in accordance with this specification.

i In ) ODES S or 6, Specification 3.0.5 is not applicable, and thus the individual I ACTIN statements for and applicable Limiting Cordition for Operation in thcao '

! )OWS nust be a&ered to. i I

l 4.0.1 'this specification prtwides that surveillance activities man to l insure the Limiting conditicms for operaticm are met and will be performed  ;

t

' during OMRATImhL PONS or other ocrditions for whid the Limiting Conditions l for operaticm are applicable. Prtwisions for additicmal surveillance '

activities to be performed without regard to the applicable OPERATINAL PONS .

l or other conditicms are provided in the individual Surveillance Requirements. {

4.0.2 'Ihe prtwision of this specificatico establishes the limit for which i the specified time interval for Surveillarce Haquirunants may be extended. It  :

permits an allowable extension of the normal surveillance interval to [

facilitate surveillance scheduling and ocmsiderstice of plant operating ,

conditions that may not be suitable for conducting the surveillance; e.g., i

, transient conditions or other ongoing surveillance or maintenance activities. ,

It also prtwides flexibility to arw-rdate the length of a fuel cycle for surveillances that are performed at and refueling cutage and are specified  ;

with an 18-aanth surveillance interval. It is not intended that this prtwision be used repeatedly as a convenience to extend surveillance intervals beyond  !

that specified for surveillances that are not performed during refueling i eutages. 'Ihm limitation of Specificatica 4.0.2 is based on angineering ,

judgement ard the w.windtion that the nost probable result of any particular surveillance being performed is the verification of conformance with the  :

( Surveillance Requirements. 'this prtwision is sufficient to ensure that the i

reliability ensured through surveillance activities is not significantly ,

deg 3ed beyond that cbtained frtan the specified surveillance interval. ,

4.0.3 'Ihm prtwisicms of this specification set forth the criteria for determination of cxmpliance with the OEPABILITY requirunents of the Limiting Ccmditions for Operation. Under this critaria, equi;xnent, systems or cuur -its are assumed to be OPERABIE if the associated surveillance activities have been satisfactorily performed within the mYSML RIVER - WIT 3 B 3/4 0-3 Amerdment No.

.- - --- - . . - -_