ML19331C797

From kanterella
Revision as of 17:29, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1980 & Revised Monthly Operating Repts for May & June 1980
ML19331C797
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/15/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18139A655 List:
References
710, NUDOCS 8008190560
Download: ML19331C797 (4)


Text

VinossrA ELucturc Axn l'owan Cosinsv Ricnwox t>.VIHOINIA 2006)

August 15, 1980 THIS DOCUMEtlT CONTAINS POOR QUAUTY PAGES Mr. N. M. Haller, Director Serial No. 710 Office of Management and N0/RMT:jmj Program Analysis Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Washington, D.C. 20555 License Nos. DPR-32 DPR-37

Dear Mr. Haller:

Enclosed is the Monthly Operating Report for Surry Power Station Unit Numbers 1 and 2 for the month of July,1980. Also included with this report are corrected data sheets for bby and June, 1980.

Very truly yours, f , $$ '

B. R. Sylvia fanager - Nuclear Operations and Maintenance Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcecent - Region II 800819o pf g

-v s

  • VIRGINIA ELECTRIC AID POUER COMPA!N SURRY PC'a'ER STATION MONTHLY OPERATING REPORT REPORT NO. 80-07 JULY, 1980 1

o i

l APPROVED:

c~

n)* n MANAGER l

l L

~ ,

a e

~"

CO:.I.NTS

_ Pace

- Section 1

Operating Data Report - Unit #1 (MAY CORRECTED REPORT) 2 Operating Data Report - Unit #1 (JUNE CORRECTED REPORT) 3 Operating Data Report - Unit #2 (JUNE CORRECTED REPORT) 4 Operating Data Report - Unit #1 5

Operating Data Report - Unit #2 6

Unit Shutdowns and Power Reductions - Unit #1 7

Unit Shutdowns and Power Reductions - Unit #2 0

Load Reductions Dee to Environmental Restrictions - Unit #1 9

  1. 2 Load Reductions Due to Environmental Restrictions - Unit 10 Average Daily Unit Power Level - Unit #1 11 Average Daily Unit Power Level - Unit #2 12 Sussary of Operating Experience 13 Amendments to Pacility License or Technical Specifications 14 Facility Changes Requiring NRC Approval l'

Facility Changes That Did Not Require NRC Approval 10 Tests and Experi=ents Requiring NRC Approval 10 Tests and Experiments That Did Not Require NRC Approval

- 19 Other Changes, Tests and Experiments 20 Chemistry Report 21 Description of All Instances Where Ther=al Discharge Limits Were Exceeded 22 Fuel Handling 2'

Procedure Revisions That Changed the Operating Mode Described In The FSAR 25 Description of Periodic Tests Which Were Not Completed Within The Time Li=its Specified In Technical Specifications 26 Inservice Inspection 27 Reportable Occurrences Pertaining to Any Outage or Power Reductions

, e 11 CONTENTS, Section Pale Maintenance of Saf ety Related Syste=s During Outage or Reduced Power 28 Periods - Uni: #1 - Mcchanical Main:enance Main:enance of Saf e:y Related Systens During Outage or Reduced Power 30 Periods - Uni: #2 - Mechanical Maintenance Maintenance of Saf ety Related Systems During Outage or Reduced Power 36 Periods - Uni: #1 - Electrical Maintenance Maintenance of Saf e:y Related Syste=s During Outage or Reduced Power 38 Periods - Unit #2 - Electrical Maintenance Main:enance of Safe:y Related Sys:e=s During Outage or Reduced Power 42 Periods - Unic #1 - Ins:ru=ent Maintenance Maintenance of Saf ety Related Syste=s During Outage or Reduced Power 44 Periods - Uni: #2 - Instru=en: Maintenance Health Physics Su==ary 46 Procedure De'.tations Reviewed by Station Nuclear Saf ety and 47 Operating Co==1:cee af:er Ti=e Li=its Specified in T.S. ,