JUNE CORRECTED REPG.RT OPERATING DATA.REPORT DOCKET NO. 50-280 DATE 07 AUG 80.
COMP LE'I'ED BY SUE D. DUNN TELEPHONE 804-357-3184 OPERATING STATUS
- 1. UliIT NAME
- 2. REPOR'IING PERIOD
- 3. LICENSED. THERMAL POWER (Mt\\'
1T)
- 4. NANEPLATE RA'I'ING (GROSS MWE)
- 5. DESIGN ELECTRICAL RATING (NET MW'E)
- 6. t.;AXIMU/1, IiEPEl/DABLE CAPACITY (GROSS Kw'E)
- 7. MAXIMUt-: DEPENDABLE CAPACITY (NET MWE)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS SURRY UNIT 1 60180 TO 63080 2441
,------~~--------------,
847.s. !NOTES I
822 I
I 740 704 NIA Max. Dependability Capacity (Gross.+ Net)
Rating changed due to L-3 Blading Removed From Both L/P Rotors
- 9. POh1ER LEVEL TO WHICH RES'1'RICTED. IF ANY NI A (NET MW"E) 1C. REASONS FOR RESTRICTIONS. IF ANY NIA
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR il1AS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDO-,,,'N HOURS
- 16. GROSS 'l'HERNAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (J.fWH)
- 18. NET ELECTRICAL ENERGY GENERATED (KWH)
- 19. UNIT SERVICE FACTOR
- 20. UUIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOw'NS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
- 25. IF SHUT DOWN AT END OF REPOKI' PERIOD.
ESTIMATE DATE OF STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION THIS MONTH YR-TO-DATE.CUMULATIVE 720.0 436 7. 0 65951. 0 705.7 2209.7 40961. 3 o.o 182.6 3731. 5 701. 5 2193.1 40098.1 0.0 183.6 3736.2 1699785.0 5268805. 0 92983677.0 507900.0 1631460.0 30311958.0 479886.0 1545886.0 287727 85. 0 97.4 olo 50.2 olo
- 60. 8 olo 97.4 olo 54.4 olo 66.5 olo 94.7 olo 50.3 olo 62.0 olo 81.1 olo 43.1 olo 53.1 olo 2.6 olo 49.8 olo 26.8 olo 9115180 - SIG REPLACEMENT OUTAGE REFUELING - 1 YEAR FORECAST ACHIEVED
.8008190S°~
1--...
JUNE CORRECTED REPORT OPERATiiv'C DATA REPOm' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELUJ TELEPHONE 804-357-3184 OPERATING STATUS
- 1. UNIT NAME
- 2. REPORTING PERIOD
- 3. LICENSED THEPJ<tfAL POi,./ER (M'r</T)
- 4. NAMEPLATE RA'.tING (GROSS /'!'l;;'E)
S. DESIG!J ELECTRICAL RATING (NET-t.f1t'E)
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS M'iv'E)
- 7. MAXINUM DEPENDABLE CAPACITY (NET l>IWE)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (I TENS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS SURRY UNIT 2 60180 2441 847. 5 822 811 775 NIA TO 63080 1---------------------~-,
I NOTES I
I I
I I
1------------------------1
- 9. PO';('ER LEVEL TO WHICH RESTRICTED. IF ANY NIA (NET M'w'E)
- 10. REASONS FOR RESTRICTIONS. IF ANY NI A
- 11. HOURS IN REPOF:J.'ING PERIOD
- 12. NUMBER OF HOURS REAC'TOR lv'AS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. Ull'IT RESERVE SHUTDO'r<iN HOURS
- 16. GlWSS '1.'HERMAL ENERGY GENERATED C."'fWH)
- 17. CROSS ELECTRICAL ENERGY GENERATED (Jvf'llH)
- 18. NET ELECTP.ICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILI'I.~ FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. uWIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDO~'NS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
- 25. IF SHUT DOWN AT END OF REPOJ(f PERIOD.
ESTIMATE DATE OF STARTUP
- 26. UNITS IN TEST S'l.'ATUS (PRIOR TO COMMERCIAL OPERATION)
INITIAL CRITICALITY IJVITIAL ELECTRICITY CO/>!MERCIAL OPERATION THIS MONTH YR-TO-DATE CUMULATIVE 720.0 436 7. 0 62831.0 o.o o.o 34499.9 o.o 0.0 o.o o.o o.o 33996.2 o.o 0.0 o.o 0.0 0.0 79194083.0 0.0 0.0 25868844.0 0.0 o.o 24536605.0 o.o olo 0.0 olo 54.1 olo 0.0 olo o.o olo 54.1 olo 0.0 olo o.o olo 50.4 olo o.o olo o.o olo
- 47. 5 olo o.o olo 0.0 olo 21.0 olo 7110180 FORECAST ACHIEVED
.. OPERATING DATA REPOFiT OPERATING STATUS
- 1. UNIT NAME
'DOCKET NO. 50-280 DATE 07 AUG 80 COMPLETED EY SUE D. DUNN TELEPHONE 804-357-3184 SURRY UNIT 1
- 2. REPORTING PERI.OD 70180 TO 73180
- 3. LICENSED THERMAL PO'w"ER (MWT) 2441 1------------------------1
- 4. NAMEPLATE RATING (-GROSS. N}</E')
847. 5 I NOTES I
. 5. DESIGN ELECTRICAL RATING (N'E:I M'w'E) 822 I
I
- 5. MAXIMUM DEPENDABLE CAPACITY (GROSS N'tlE) 740
- 7. MAXIMUM DEPENDABLE CAPACITY (NET M',/E.)
704
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS NIA (ITEMS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS
- 9. POWER LEVEL 'l'O h-'HICH RESTRICTED. IF ANY NIA (NET MwE)
- 10. REASONS FOR RESTRICTIONS. IF ANY NIA THIS MONTH YR~TO-DATE CUMULATIVE
- 11. HOURS IN REPORIING PERIOD
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MW'H)
- 17. GROSS ELECTRICAL ENERGY GENERATED (fafl'IH)
- 18. NET ELECTRICAL ENERGY GENERATED (/.fs,./H)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDor,,ms SCHEDULED OVER NEXT 5 MONTHS (TYPE.DATE.AND DURATION OF EACH)
- 25. IF SHUT DOirf'N AT END OF REPOIIT PERIOD.
ESTIMATE DATE OF STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION 744. 0 5111.0 66695.0 744.0 2953.7 41705.3 0.0 182.6 3731. 5 744.0 2937.1 40842.1 0.0 183. 6 3736.2 1741501.0 7010406.0 94725278.0 515285.0 2146745.0 30827243.0 484396.0 2030282. 0 29257181.0 100.0 olo 57.' 5 olo 51.2 olo 100.0 olo 51.1 ala 66.8 o/o 92.5 olo 56.4 ale 52.3 ale 79.2 ale 48.3 o/o 53.4 ala 0.0 olo 42.5 olo 26.5 olo 9115180 - SIG REPLACEMENT OUTAGE REFUELING - 1 YEAR FORECAST ACHIEVED OPERATING DATA REPOKI' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELLO TELEPHONE 804-357-3184 OPERATING STATUS 1. UN IT NAME
- 2. RE:FOE?I'ING PEP.IOD
- 3. LICENSED THER'-1AL POWER (MWT)
- 4. NANEPLATE' RATING (GROSS /.fWE)
- 5. DESIGN ELECTRICAL RATING (NET !*ME)
- 6. MAXIf.:UM DEPENDABLE CAPACITY (GROSS MWE)
- 7. MAXINUM DEPENDABLE CAPACITY (NET t<,1'.'E)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPOKI'. GIVE REASONS SURRY UNIT 2 70180 TO 73180 2441,------------------------!
847.5 !NOTES I
822 I
I 811 I
I 775 NIA
- 9. POWER LEVEL TO w'HICH RESTRICTED. IF ANY NI A (NET M'w'E)
- 10. REASONS POR RESTRICTIONS. IF ANY NIA THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPOKI'ING PEP..IOD
- 12. NUMBER OF HOURS REACTOR 11iAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERA1'0R ON-LINE
- 15. UNIT RESERVE SHUTDOw'N HOURS
, 16. GROSS THERMAL ENERGY GENERA1'ED (M'w'H)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
- 25. IF SHUT DOWN AT END OF REPORT PERIOD.
ESTIMATE DATE OF STARTUP
- 26. UNITS Ill TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
INI17AL CP..ITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 744.0 5111.0 63575.0 o.o o.o 34499.9 o.o o.o 0.0 0.0 o.o 33996. 2 0.0 o.o 0.0 o.o 0.0 79194083. 0 0.0 o.o 25868844.0 0.0 0.0 24536605.0 0.0 0.0 53.5 ojo 0.0 0.0 53.5 olo o.o 0.0 49.8 olo, o.o o.o 47.0 olo 0.0 0.0
- 21. 0 olo FORECAST ACHIEVED