JUNE CORRECTED REPG.RT OPERATING DATA.REPORT DOCKET NO. 50-280 DATE 07 AUG 80.

COMP LE'I'ED BY SUE D. DUNN TELEPHONE 804-357-3184 OPERATING STATUS

1. UliIT NAME
2. REPOR'IING PERIOD
3. LICENSED. THERMAL POWER (Mt\\'

1T)

4. NANEPLATE RA'I'ING (GROSS MWE)
5. DESIGN ELECTRICAL RATING (NET MW'E)
6. t.;AXIMU/1, IiEPEl/DABLE CAPACITY (GROSS Kw'E)
7. MAXIMUt-: DEPENDABLE CAPACITY (NET MWE)
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS SURRY UNIT 1 60180 TO 63080 2441

,------~~--------------,

847.s. !NOTES I

822 I

I 740 704 NIA Max. Dependability Capacity (Gross.+ Net)

Rating changed due to L-3 Blading Removed From Both L/P Rotors

9. POh1ER LEVEL TO WHICH RES'1'RICTED. IF ANY NI A (NET MW"E) 1C. REASONS FOR RESTRICTIONS. IF ANY NIA
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR il1AS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDO-,,,'N HOURS
16. GROSS 'l'HERNAL ENERGY GENERATED (MWH)
17. GROSS ELECTRICAL ENERGY GENERATED (J.fWH)
18. NET ELECTRICAL ENERGY GENERATED (KWH)
19. UNIT SERVICE FACTOR
20. UUIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE
24. SHUTDOw'NS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
25. IF SHUT DOWN AT END OF REPOKI' PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION THIS MONTH YR-TO-DATE.CUMULATIVE 720.0 436 7. 0 65951. 0 705.7 2209.7 40961. 3 o.o 182.6 3731. 5 701. 5 2193.1 40098.1 0.0 183.6 3736.2 1699785.0 5268805. 0 92983677.0 507900.0 1631460.0 30311958.0 479886.0 1545886.0 287727 85. 0 97.4 olo 50.2 olo

60. 8 olo 97.4 olo 54.4 olo 66.5 olo 94.7 olo 50.3 olo 62.0 olo 81.1 olo 43.1 olo 53.1 olo 2.6 olo 49.8 olo 26.8 olo 9115180 - SIG REPLACEMENT OUTAGE REFUELING - 1 YEAR FORECAST ACHIEVED

.8008190S°~

1--...

JUNE CORRECTED REPORT OPERATiiv'C DATA REPOm' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELUJ TELEPHONE 804-357-3184 OPERATING STATUS

1. UNIT NAME
2. REPORTING PERIOD
3. LICENSED THEPJ<tfAL POi,./ER (M'r</T)
4. NAMEPLATE RA'.tING (GROSS /'!'l;;'E)

S. DESIG!J ELECTRICAL RATING (NET-t.f1t'E)

6. MAXIMUM DEPENDABLE CAPACITY (GROSS M'iv'E)
7. MAXINUM DEPENDABLE CAPACITY (NET l>IWE)
8. IF CHANGES OCCUR IN CAPACITY RATINGS (I TENS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS SURRY UNIT 2 60180 2441 847. 5 822 811 775 NIA TO 63080 1---------------------~-,

I NOTES I

I I

I I

1------------------------1

9. PO';('ER LEVEL TO WHICH RESTRICTED. IF ANY NIA (NET M'w'E)
10. REASONS FOR RESTRICTIONS. IF ANY NI A
11. HOURS IN REPOF:J.'ING PERIOD
12. NUMBER OF HOURS REAC'TOR lv'AS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. Ull'IT RESERVE SHUTDO'r<iN HOURS
16. GlWSS '1.'HERMAL ENERGY GENERATED C."'fWH)
17. CROSS ELECTRICAL ENERGY GENERATED (Jvf'llH)
18. NET ELECTP.ICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILI'I.~ FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. uWIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE
24. SHUTDO~'NS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
25. IF SHUT DOWN AT END OF REPOJ(f PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST S'l.'ATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY IJVITIAL ELECTRICITY CO/>!MERCIAL OPERATION THIS MONTH YR-TO-DATE CUMULATIVE 720.0 436 7. 0 62831.0 o.o o.o 34499.9 o.o 0.0 o.o o.o o.o 33996.2 o.o 0.0 o.o 0.0 0.0 79194083.0 0.0 0.0 25868844.0 0.0 o.o 24536605.0 o.o olo 0.0 olo 54.1 olo 0.0 olo o.o olo 54.1 olo 0.0 olo o.o olo 50.4 olo o.o olo o.o olo

47. 5 olo o.o olo 0.0 olo 21.0 olo 7110180 FORECAST ACHIEVED

.. OPERATING DATA REPOFiT OPERATING STATUS

1. UNIT NAME

'DOCKET NO. 50-280 DATE 07 AUG 80 COMPLETED EY SUE D. DUNN TELEPHONE 804-357-3184 SURRY UNIT 1

2. REPORTING PERI.OD 70180 TO 73180
3. LICENSED THERMAL PO'w"ER (MWT) 2441 1------------------------1
4. NAMEPLATE RATING (-GROSS. N}</E')

847. 5 I NOTES I

. 5. DESIGN ELECTRICAL RATING (N'E:I M'w'E) 822 I

I

5. MAXIMUM DEPENDABLE CAPACITY (GROSS N'tlE) 740
7. MAXIMUM DEPENDABLE CAPACITY (NET M',/E.)

704

8. IF CHANGES OCCUR IN CAPACITY RATINGS NIA (ITEMS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS
9. POWER LEVEL 'l'O h-'HICH RESTRICTED. IF ANY NIA (NET MwE)
10. REASONS FOR RESTRICTIONS. IF ANY NIA THIS MONTH YR~TO-DATE CUMULATIVE
11. HOURS IN REPORIING PERIOD
12. NUldBER OF HOURS REACTOR lv'AS CF.ITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MW'H)
17. GROSS ELECTRICAL ENERGY GENERATED (fafl'IH)
18. NET ELECTRICAL ENERGY GENERATED (/.fs,./H)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE
24. SHUTDor,,ms SCHEDULED OVER NEXT 5 MONTHS (TYPE.DATE.AND DURATION OF EACH)
25. IF SHUT DOirf'N AT END OF REPOIIT PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION 744. 0 5111.0 66695.0 744.0 2953.7 41705.3 0.0 182.6 3731. 5 744.0 2937.1 40842.1 0.0 183. 6 3736.2 1741501.0 7010406.0 94725278.0 515285.0 2146745.0 30827243.0 484396.0 2030282. 0 29257181.0 100.0 olo 57.' 5 olo 51.2 olo 100.0 olo 51.1 ala 66.8 o/o 92.5 olo 56.4 ale 52.3 ale 79.2 ale 48.3 o/o 53.4 ala 0.0 olo 42.5 olo 26.5 olo 9115180 - SIG REPLACEMENT OUTAGE REFUELING - 1 YEAR FORECAST ACHIEVED OPERATING DATA REPOKI' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELLO TELEPHONE 804-357-3184 OPERATING STATUS 1. UN IT NAME

2. RE:FOE?I'ING PEP.IOD
3. LICENSED THER'-1AL POWER (MWT)
4. NANEPLATE' RATING (GROSS /.fWE)
5. DESIGN ELECTRICAL RATING (NET !*ME)
6. MAXIf.:UM DEPENDABLE CAPACITY (GROSS MWE)
7. MAXINUM DEPENDABLE CAPACITY (NET t<,1'.'E)
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPOKI'. GIVE REASONS SURRY UNIT 2 70180 TO 73180 2441,------------------------!

847.5 !NOTES I

822 I

I 811 I

I 775 NIA

9. POWER LEVEL TO w'HICH RESTRICTED. IF ANY NI A (NET M'w'E)
10. REASONS POR RESTRICTIONS. IF ANY NIA THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPOKI'ING PEP..IOD
12. NUMBER OF HOURS REACTOR 11iAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERA1'0R ON-LINE
15. UNIT RESERVE SHUTDOw'N HOURS

, 16. GROSS THERMAL ENERGY GENERA1'ED (M'w'H)

17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE.DATE.AND DURATION OF EACH)
25. IF SHUT DOWN AT END OF REPORT PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS Ill TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

INI17AL CP..ITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 744.0 5111.0 63575.0 o.o o.o 34499.9 o.o o.o 0.0 0.0 o.o 33996. 2 0.0 o.o 0.0 o.o 0.0 79194083. 0 0.0 o.o 25868844.0 0.0 0.0 24536605.0 0.0 0.0 53.5 ojo 0.0 0.0 53.5 olo o.o 0.0 49.8 olo, o.o o.o 47.0 olo 0.0 0.0

21. 0 olo FORECAST ACHIEVED