JUNE CORRECTED REPG.RT OPERATING DATA .REPORT DOCKET NO. 50-280 DATE 07 AUG 80 .

COMP LE'I'ED BY SUE D. DUNN TELEPHONE 804-357-3184 OPERATING STATUS

1. UliIT NAME SURRY UNIT 1
2. REPOR'IING PERIOD 60180 TO 63080
3. LICENSED. THERMAL POWER (Mt\' T)1 2441 ,------~~--------------,
4. NANEPLATE RA'I'ING (GROSS MWE) 847.s. !NOTES I
5. DESIGN ELECTRICAL RATING (NET MW'E) 822 I I
6. t.;AXIMU/1, IiEPEl/DABLE CAPACITY (GROSS Kw'E) 740
7. MAXIMUt-: DEPENDABLE CAPACITY (NET MWE) 704
8. IF CHANGES OCCUR IN CAPACITY RATINGS NIA Max. Dependability Capacity (Gross.+ Net)

(ITEMS 3 THROUGH 7) SINCE LAST Rating changed due to L-3 Blading Removed REPORT. GIVE REASONS From Both L/P Rotors

9. POh1ER LEVEL TO WHICH RES'1'RICTED. IF ANY NI A (NET MW"E) 1C. REASONS FOR RESTRICTIONS. IF ANY NIA THIS MONTH YR-TO-DATE.CUMULATIVE
11. HOURS IN REPORTING PERIOD 720.0 436 7. 0 65951. 0
12. NUMBER OF HOURS REACTOR il1AS CRITICAL 705.7 2209.7 40961. 3
13. REACTOR RESERVE SHUTDOWN HOURS o.o 182.6 3731. 5
14. HOURS GENERATOR ON-LINE 701. 5 2193.1 40098.1
15. UNIT RESERVE SHUTDO-,,,'N HOURS 0.0 183.6 3736.2
16. GROSS 'l'HERNAL ENERGY GENERATED (MWH) 1699785.0 5268805. 0 92983677.0
17. GROSS ELECTRICAL ENERGY GENERATED (J.fWH) 507900.0 1631460.0 30311958.0
18. NET ELECTRICAL ENERGY GENERATED (KWH) 479886.0 1545886.0 287727 85. 0
19. UNIT SERVICE FACTOR 97.4 olo 50.2 olo 60. 8 olo
20. UUIT AVAILABILITY FACTOR 97.4 olo 54.4 olo 66.5 olo
21. UNIT CAPACITY FACTOR (USING MDC NET) 94.7 olo 50.3 olo 62.0 olo
22. UNIT CAPACITY FACTOR (USING DER NET) 81.1 olo 43.1 olo 53.1 olo
23. UNIT FORCED OUTAGE RATE 2.6 olo 49.8 olo 26.8 olo
24. SHUTDOw'NS SCHEDULED OVER NEXT 6 MONTHS 9115180 - SIG REPLACEMENT OUTAGE (TYPE.DATE.AND DURATION OF EACH) REFUELING - 1 YEAR
25. IF SHUT DOWN AT END OF REPOKI' PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST STATUS FORECAST ACHIEVED (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

.8008190S°~

1--

... JUNE CORRECTED REPORT OPERATiiv'C DATA REPOm' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELUJ TELEPHONE 804-357-3184 OPERATING STATUS

1. UNIT NAME SURRY UNIT 2
2. REPORTING PERIOD 60180 TO 63080
3. LICENSED THEPJ<tfAL POi,./ER (M'r</T) 2441 1---------------------~-,
4. NAMEPLATE RA'.tING (GROSS /'!'l;;'E) 847. 5 INOTES I S. DESIG!J ELECTRICAL RATING (NET- t.f1t'E) 822 I I
6. MAXIMUM DEPENDABLE CAPACITY (GROSS M'iv'E) 811 I I
7. MAXINUM DEPENDABLE CAPACITY (NET l>IWE)
8. IF CHANGES OCCUR IN CAPACITY RATINGS 775 NIA 1------------------------1 (I TENS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS
9. PO';('ER LEVEL TO WHICH RESTRICTED. IF ANY NIA (NET M'w'E)
10. REASONS FOR RESTRICTIONS. IF ANY NI A THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPOF:J.'ING PERIOD 720.0 436 7. 0 62831.0
12. NUMBER OF HOURS REAC'TOR lv'AS CRITICAL o.o o.o 34499.9
13. REACTOR RESERVE SHUTDOWN HOURS o.o 0.0 o.o
14. HOURS GENERATOR ON-LINE o.o o.o 33996.2
15. Ull'IT RESERVE SHUTDO'r<iN HOURS o.o 0.0 o.o
16. GlWSS '1.'HERMAL ENERGY GENERATED C."'fWH) 0.0 0.0 79194083.0
17. CROSS ELECTRICAL ENERGY GENERATED (Jvf'llH) 0.0 0.0 25868844.0
18. NET ELECTP.ICAL ENERGY GENERATED (MWH) 0.0 o.o 24536605.0
19. UNIT SERVICE FACTOR o.o olo 0.0 olo 54.1 olo
20. UNIT AVAILABILI'I.~ FACTOR 0.0 olo o.o olo 54.1 olo
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 olo o.o olo 50.4 olo
22. uWIT CAPACITY FACTOR (USING DER NET) o.o olo o.o olo 47. 5 olo
23. UNIT FORCED OUTAGE RATE o.o olo 0.0 olo 21.0 olo
24. SHUTDO~'NS SCHEDULED OVER NEXT 6 MONTHS (TYPE .DATE .AND DURATION OF EACH)
25. IF SHUT DOWN AT END OF REPOJ(f PERIOD. 7110180 ESTIMATE DATE OF STARTUP
26. UNITS IN TEST S'l.'ATUS FORECAST ACHIEVED (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY IJVITIAL ELECTRICITY CO/>!MERCIAL OPERATION

.. OPERATING DATA REPOFiT

'DOCKET NO. 50-280 DATE 07 AUG 80 COMPLETED EY SUE D. DUNN TELEPHONE 804-357-3184 OPERATING STATUS

1. UNIT NAME SURRY UNIT 1
2. REPORTING PERI.OD 70180 TO 73180
3. LICENSED THERMAL PO'w"ER (MWT) 2441 1------------------------1
4. NAMEPLATE RATING (-GROSS. N}</E') 847. 5 I NOTES I

. 5. DESIGN ELECTRICAL RATING (N'E:I M'w'E) 822 I I

5. MAXIMUM DEPENDABLE CAPACITY (GROSS N'tlE) 740
7. MAXIMUM DEPENDABLE CAPACITY (NET M',/E.) 704
8. IF CHANGES OCCUR IN CAPACITY RATINGS NIA (ITEMS 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS
9. POWER LEVEL 'l'O h-'HICH RESTRICTED. IF ANY NIA (NET MwE)
10. REASONS FOR RESTRICTIONS. IF ANY NIA THIS MONTH YR~TO-DATE CUMULATIVE
11. HOURS IN REPORIING PERIOD 744. 0 5111.0 66695.0
12. NUldBER OF HOURS REACTOR lv'AS CF.ITICAL 744.0 2953.7 41705.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 182.6 3731. 5
14. HOURS GENERATOR ON-LINE 744.0 2937.1 40842.1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 183. 6 3736.2
16. GROSS THERMAL ENERGY GENERATED (MW'H) 1741501.0 7010406.0 94725278.0
17. GROSS ELECTRICAL ENERGY GENERATED (fafl'IH) 515285.0 2146745.0 30827243.0
18. NET ELECTRICAL ENERGY GENERATED (/.fs,./H) 484396.0 2030282. 0 29257181.0
19. UNIT SERVICE FACTOR 100.0 olo 57.' 5 olo 51.2 olo
20. UNIT AVAILABILITY FACTOR 100.0 olo 51.1 ala 66.8 o/o
21. UNIT CAPACITY FACTOR (USING MDC NET) 92.5 olo 56.4 ale 52.3 ale
22. UNIT CAPACITY FACTOR (USING DER NET) 79.2 ale 48.3 o/o 53.4 ala
23. UNIT FORCED OUTAGE RATE 0.0 olo 42.5 olo 26.5 olo
24. SHUTDor,,ms SCHEDULED OVER NEXT 5 MONTHS 9115180 - SIG REPLACEMENT OUTAGE (TYPE.DATE.AND DURATION OF EACH) REFUELING - 1 YEAR
25. IF SHUT DOirf'N AT END OF REPOIIT PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS IN TEST STATUS FORECAST ACHIEVED (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPEP.ATION

OPERATING DATA REPOKI' DOCKET NO. 50-281 DATE 07 AUG 80 COMPLETED BY O.J. COSTELLO TELEPHONE 804-357-3184 OPERATING STATUS 1 . UN IT NAME SURRY UNIT 2

2. RE:FOE?I'ING PEP.IOD 70180 TO 73180
3. LICENSED THER'-1AL POWER (MWT) 2441 ,------------------------!
4. NANEPLATE' RATING (GROSS /.fWE) 847.5 !NOTES I
5. DESIGN ELECTRICAL RATING (NET !*ME) 822 I I
6. MAXIf.:UM DEPENDABLE CAPACITY (GROSS MWE) 811 I I
7. MAXINUM DEPENDABLE CAPACITY (NET t<,1'.'E)
8. IF CHANGES OCCUR IN CAPACITY RATINGS 775  !------------------------!

NIA (ITEMS 3 THROUGH 7) SINCE LAST REPOKI'. GIVE REASONS

9. POWER LEVEL TO w'HICH RESTRICTED. IF ANY NI A (NET M'w'E)
10. REASONS POR RESTRICTIONS. IF ANY NIA THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPOKI'ING PEP..IOD 744.0 5111.0 63575.0
12. NUMBER OF HOURS REACTOR 11iAS CRITICAL o.o o.o 34499.9
13. REACTOR RESERVE SHUTDOWN HOURS o.o o.o 0.0
14. HOURS GENERA1'0R ON-LINE 0.0 o.o 33996. 2
15. UNIT RESERVE SHUTDOw'N HOURS 0.0 o.o 0.0

, 16. GROSS THERMAL ENERGY GENERA1'ED (M'w'H) o.o 0.0 79194083. 0

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 o.o 25868844.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 0.0 24536605.0
19. UNIT SERVICE FACTOR 0.0 0.0 53.5 ojo
20. UNIT AVAILABILITY FACTOR 0.0 0.0 53.5 olo
21. UNIT CAPACITY FACTOR (USING MDC NET) o.o 0.0 49.8 olo,
22. UNIT CAPACITY FACTOR (USING DER NET) o.o o.o 47.0 olo
23. UNIT FORCED OUTAGE RATE 0.0 0.0 21. 0 olo
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE .DATE .AND DURATION OF EACH)
25. IF SHUT DOWN AT END OF REPORT PERIOD.

ESTIMATE DATE OF STARTUP

26. UNITS Ill TEST STATUS FORECAST ACHIEVED (PRIOR TO COMMERCIAL OPERATION)

INI17AL CP..ITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION