Revision to Monthly Operating Rept for May 1980
ML18139A654
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/07/1980
From: Costello O
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139A655 List:
References
NUDOCS 8008190566
Download: ML18139A654 (1)


Text

.:..1-MAY ~CTED REPORT

. *OPEr~.TING DATA REPOiiT DOCKET NO. 50-280 DATE 07 AUG 80-*

COMPLETED BY 0 .J. COSTELW TELEPHO!iE 804-357-3184 OPERATING STATUS

1. UNIT NAME SURRY UNIT 1
2. REPORIING PERIOD 50180 TO 53180
3. LICENSED THERNAL PO'w'ER (MWT) 2441 I ----------------*-------,
4. NAMEPLATE RATING (GROSS Mv.'E) 847.5 INOTES I
5. DESIGN ELECTP.ICAL RATING (NE'I f.ff.t'E) 822 I I
6. MAXIXUM DEPENDABLE CAPACITY (GROSS MWE) 811 7 * .MAXIY:UM DEPENDABLE CAPACI1'Y (NET NWE) 775
8. IF CHANGES OCCUR IN CAPACITY RATINGS NIA (ITEMS 3 THROUGH 7) SINCE LAST REPOR:r. GIVE REASONS
9. POWER LEVEL TO w'HICH RES'l'RICTED. IF ANY NI A (NET Mw'E)
10. REASONS FOR RESTHICTIONS. IF ANY NI A THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPOETING PERIOD 744.0 3647.0 65231.0
12. N~~BER OF HOURS REACTOR WAS CRITIC'AL 487. 8 1504.0 40255.6
13. REACTOR RESERVE SHUTDOWN HOURS o.o 182.6 3731. 5
14. HOURS GENERATOR ON-LINE 481.2 1491.6 39396.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 183.6 3736.2
16. CROSS THEP.MAL ENERGY GENERATED (NY.'H) 1130680.0 3569020.0 912838 92. 0
17. GROSS ELECTRIC AL ENERGY GENERATED (NWH) 337905. 0 1123560. 0 29804058.0
18. !v'ET ELECTRICAL ENERGY GENERATED (Mh'H) 319190.0 1066000.0 28292899.0
19. UNIT SERVICE FACTOR 64.7 olo 40.9 olo 60.4 olo
20. UNIT AVAILABILITY FACTOR 64.7 olo 45.9 olo 66.1 olo
21. UNIT CAPACITY FACTOR (USING MDC NET) 55.4 olo 37.7 ala 56.0 olo
22. UNIT CAPACITY FACTOR (USING DER NET) 52.2 olo 35.6 olo 52. 8 olo
23. UNIT FORCED OUTAGE RATE 35.3 olo 59.1 o lo 27.1 olo j
24. SHUTDO'wNS SCHEDULED OVER NEXT 6 MONTHS 9115180 - SIG REPLAC&~ENT OUTAGE (TYPE.DATE.AND DUP~TION OF EACH) REFUELING - 1 YEAR
25. IF SHUT DOh'N AT END OF REPOJ?:I' PERIOD.

ESTL~ATE DATE OF STARTUP

26. UNITS IN TEST STATUS FORECAST ACHIEVED (PRIOR TO COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION