ML20002A738

From kanterella
Revision as of 17:16, 30 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-035/03L-0
ML20002A738
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/14/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20002A739 List:
References
MP-2-4520, NUDOCS 8011210455
Download: ML20002A738 (1)


Text

--

IETIE:!AISE' UTt!.ITCt!!i w.~...,.w.....m PO Box 270 HARTFQRO. CCNNrCTICUT 06101

.....'.'..'.ew.w.[.rl/g5I'id.N.,

(203) 666 6911 k

tIJ '

- ~ ~ '!.7,72,"O.'L'.'.'.' ,

November 14, 1980 MP-2-4520 I2 -

.? o

!!r. Boyce H. Grier

~

E Director, Region I Office of Inspection and Enforcement

._.:L 2 rd 75 -;

~-

U. S. fluclear Regulatory Commission [A". , 6:

631 Park Avenue King of Prussia, Pennsylvania 19406

=7 g s

g, id

~_; -

a o e

o a.:

Reference:

Facility Operating License flo. DPR-65 u Docket flo. 50-336 Reportable Acurrence R0-50-336/80-35/3L-0

Dear Mr. Grier:

This letter fomards Licensee Event Report 80-35/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendi.'

A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode pemitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST flVCLEAR EilERGY COMPAf4Y

'[ #f

-. . l'roczka Station Superintendent Millstone fluclear Power Station EJM/JLC:kaf

Attachment:

LER 80-36/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C.

(30)

Director, Office of Management Infomation and Program Control, Washington, D.C. (3) g U. S. fluclear Regulatory Commission, c.*o Cocument Management .

Branch, Washington, D.C. 20555 S

//

~

8011210 W5 S

-