05000336/LER-1980-035, Forwards LER 80-035/03L-0

From kanterella
(Redirected from ML20002A738)
Jump to navigation Jump to search
Forwards LER 80-035/03L-0
ML20002A738
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/14/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20002A739 List:
References
MP-2-4520, NUDOCS 8011210455
Download: ML20002A738 (1)


LER-1980-035, Forwards LER 80-035/03L-0
Event date:
Report date:
3361980035R00 - NRC Website

text

--

IETIE:!AISE' UTt!.ITCt!!i w.~...,.w.....m PO Box 270

.....'.'..'.ew.w.[.rl/g5I'id.N.,

HARTFQRO. CCNNrCTICUT 06101 (203) 666 6911 k

t I J

- ~ ~ '!.7,72,"O.'L'.'.'.'

November 14, 1980 MP-2-4520 I2

.?

o

!!r. Boyce H. Grier E

~

Director, Region I

._.:L 7

Office of Inspection and Enforcement 2 rd 5

~-

U. S. fluclear Regulatory Commission [A".

6:

631 Park Avenue

=7 id s

King of Prussia, Pennsylvania 19406 g

g,

~_;

a o

e o

a.:

Reference:

Facility Operating License flo. DPR-65 u

Docket flo. 50-336 Reportable Acurrence R0-50-336/80-35/3L-0

Dear Mr. Grier:

This letter fomards Licensee Event Report 80-35/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendi.'

A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode pemitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST flVCLEAR EilERGY COMPAf4Y

'[

  1. f

. l'roczka Station Superintendent Millstone fluclear Power Station EJM/JLC:kaf

Attachment:

LER 80-36/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C.

(30)

Director, Office of Management Infomation and Program Control, Washington, D.C.

(3) g U. S. fluclear Regulatory Commission, c.*o Cocument Management Branch, Washington, D.C.

20555 S

/ /

~

8011210 W5 S