Forwards LER 81-021/03L-0.Detailed Event Analysis Encl
ML20009A455
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/02/1981
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009A456 List:
References
MP-2-4823, NUDOCS 8107130154
Download: ML20009A455 (2)


Text

,

~

INNtTHI!AST IFFII.ITIIES 1 E  :::%2:T' %~%7'" 00f oiE CONNECTICUT 06101 l

?l'.* :::::::t;: =::"""" an sene11 L L ia :n::.J.;;:ll'fWI7l July 2, 1981 MP-2-4823 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 Reportable Occurrence R0-50-336/81-021/3L-0

Dear Mr. Grier:

Th:s letter forwards Licensee Esent Report 81-021/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, l

NORTHEAST NUCLEAR ENERGY COMPANY v /h' eg?:: +

nn lf<}b E. Mroczka /o ' '

  • h b

l Station Superintendent p' 9 Millstone Nuclear Power Station; ,q 10196hm -

EJM/JLC:ws *O k

Attachment:

LER 81-021/3L-0 I

q(g #

cc: Director, Office of Inspection and Enforcement, Washington, D. C. (30)

Director, Office of Management Information and Program Control, Washington, D. C. (3)

U. S. Nuclear Regulatory Commis< a, c/o Document Management Branch, Washington, D. C. 20555 h6y e1on20m e10702 PDR ADOCK 05000336 S PDR

i

, o ATTACHMENT TO LER 81-021/3L-0 NORTHEAST NUCLEAR ENERGY COMPANY MILLSTUNE NUCLEAR POWER STATION - UNIT 1 PROVISIONAL LICENSE NUMBER DPR-65 DOCKET NUMBER 50-336 EVENT DESCRIPTION With the plant at 100 percent power level, the 'A' and 'B' charging pumps were declared inoperable when it was discovered that flushing connection blank flanges were incorrectly installed on both pumps. the 'C' charging pump was verified operable and the plant operated in accordance with Technical Specification Action Statements 3.5.2.a and 3.1.2.4. The 'A' and 'B' pumps were taken out of service, the necessary flange modifications made and the

'A' and 'B' charging pumps returned to service.

CAUSE DESCRIPTION Notification by the charging pump vendor (Gaulin Corporation) indicated that the recently installed 'A' and B' charging pumps had suction and discharge seal cylinder assembly flushing nipple blank flanges installed incorrectly, due to a design drawing error. Specifically, low pressure, (150 lbs. rated) blank flanges were installed on the discharge (1500 lbs.) high pressure side of the pump and the high presiure blank flanges were installed on the low pressure, suction side of the pump.

The pumps were removed from service, the 150 lbs. rated flange assembly removed from the high pressure flushing nipple and a 3/4", 3000 pound stainless steel pipe cap welded onto the flush:.1g nipple, in accordance with original vendor specifications. The 1500 lbs. rated blank flanges were left intact on the suction, low pressure side of the pumps since this installation exceeded the low pressure design rating of the seal cylindcr assembly flushing nipples.

The 'A' and 'B' charging were returned to service within 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> and the applicable design drawing changes implemented to reflect as-built conditions.