|
---|
Category:Inspection Report
MONTHYEARIR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 IR 05000327/20200032020-11-10010 November 2020 Integrated Inspection Report 05000327/2020003, 05000328/2020003 and 07200034/2020002 IR 05000327/20200122020-10-20020 October 2020 Plants - Triennial Fire Protection Inspection Report 05000327/2020012 and 05000328/2020012 IR 05000327/20204012020-09-21021 September 2020 Cyber Security Inspection Report 05000327-2020401 and 05000328-2020401 IR 05000327/20204022020-09-18018 September 2020 Regulatory Commission Security Baseline Inspection Report 05000327/2020402 and 05000328/2020402 IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000327/20200052020-08-18018 August 2020 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020005 and 05000328/2020005 IR 05000327/20200022020-07-23023 July 2020 Integrated Inspection Report 05000327/2020002 and 05000328/2020002 IR 05000327/20200012020-05-0505 May 2020 Integrated Inspection Report 05000327/2020001 and 05000328/2020001 IR 05000327/20203012020-04-24024 April 2020 NRC Operator License Examination Report 05000327/2020301 and 05000328/2020301 IR 05000327/20200102020-04-21021 April 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000327/2020010 and 05000328/2020010 ML20086M0062020-03-26026 March 2020 Information Request for the Cyber Security Inspection and Notification to Perform Inspection 05000327/2020401 and 05000328/2020401 2024-01-11
[Table view] Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] |
Text
UNITED STATES ber 20, 2010
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000327/2010501 AND 05000328/2010501
Dear Mr. Krich:
On November 19, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results which were discussed on November 19, 2010, with Mr. R.
Detwiler, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
Enclosure:
Inspection Report 05000328/2010501 and 05000327/2010501 w/Attachment: Supplemental Information
REGION II==
Docket Nos.: 05000327, 05000328 License Nos.: DPR-77, DPR-79 Report No.: 05000327/2010501 and 05000328/2010501 Licensee: Tennessee Valley Authority (TVA)
Facility: Sequoyah Nuclear Plant, Units 1 and 2 Location: Soddy-Daisy, TN Dates: November 15, 2010 through November 19, 2010 Inspectors: J. Beavers, Emergency Preparedness Inspector C. Young, Senior Resident Inspector M. Speck, Resident Inspector C. Fontana, Emergency Response Coordinator Approved by: B. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000327/2010501 and 05000328/2010501; 11/15/2010 - 11/19/2010; Sequoyah Nuclear
Plant, Units 1 and 2; Baseline Inspection.
This report covered an announced inspection by a regional emergency preparedness inspector, a senior resident inspector, a resident inspector and an emergency response coordinator.
NRC-Identified and Self-Revealing Findings
No findings were identified
Licensee-Identified Violations
None
REPORT DETAILS
REACTOR SAFETY
1EP1 Exercise Evaluation
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the Nuclear Regulatory Commission (NRC) to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14).
The onsite inspection consisted of the following review and assessment:
- The adequacy of the licensees performance in the biennial exercise conducted on November 17, 2010, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and
- (10) which address emergency classification, offsite notification, radiological assessment, and protective action recommendations respectively.
- The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC) and Emergency Operations Facility (EOF).
- Other performance areas such as: the Emergency Response Organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
- The post-exercise critique process and the presentation to the licensee's senior management conducted on November 18, 2010, to evaluate the licensees self-assessment of its Emergency Response Organization (ERO) performance during the exercise, and to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g.
The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
b. Findings
No findings were identified.
1EP4 Emergency Action Level and Emergency Plan Changes
a. Inspection Scope
Since the last NRC inspection of this program area, revisions 90, 91, and 92 of the Emergency Plan were implemented based on the licensees determination, in accordance with 10 CFR 50.54(q), that the changes resulted in no decrease in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The inspectors conducted a sampling review of the implementing procedure changes made between October 1, 2009, and October 31, 2010, to evaluate for potential decreases in effectiveness of the Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator Verification
a. Inspection Scope
The inspectors sampled licensee submittals relative to the Performance Indicators (PIs)listed below for the period July 1, 2009, through September 30, 2010. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used to confirm the reporting basis for each data element.
Emergency Preparedness Cornerstone
- Emergency Response Organization Drill/Exercise Performance (DEP)
- Emergency Response Organization Readiness (ERO)
- Alert and Notification System Reliability (ANS)
For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspector verified the accuracy of the DEP through review of a sample of drill and event records. The inspector reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. The inspector verified the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment.
The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the three
- (3) Emergency Preparedness PIs, i.e., DEP, ERO, and ANS, on an annual basis.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
On November 19, 2010, the lead inspector presented the inspection results to Mr. R.
Detwiler, and other members of licensee management. The inspector confirmed that proprietary information was not provided or examined during the inspection.
- Supplemental Information
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- R. Detwiler, Director, Safety and Licensing
- J. Furr, Quality Assurance Manager
- W. Lee, Corporate Emergency Preparedness Manager
- S. McCamy, Radiation Protection Manager
- P. Simmons, Operations Manager
- D. Sutton, Licensing Engineer
- R. Thompson, Emergency Preparedness Manager
- B. Wetzel, Site Licensing Manager
- J. Williams, Director, Site Engineering
LIST OF DOCUMENTS REVIEWED