July 16, 2021
SUBJECT:
SEQUOYAH NUCLEAR PLANT - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000327/2021011 AND 05000328/2021011
Dear Mr. Barstow:
On June 24, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Sequoyah Nuclear Plant and discussed the results of this inspection with Mr. Chris Reneau, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews, the team found no evidence of challenges to your organizations safety-conscious work environment.
Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Thomas A. Stephen, Chief Reactor Projects Branch #5 Division of Reactor Projects
Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000327 and 05000328
License Numbers:
Report Numbers:
05000327/2021011 and 05000328/2021011
Enterprise Identifier: I-2021-011-0027
Licensee:
Tennessee Valley Authority
Facility:
Sequoyah Nuclear Plant
Location:
Soddy Daisy, TN 37379
Inspection Dates:
June 07, 2021 to June 24, 2021
Inspectors:
N. Childs, Resident Inspector
M. Kirk, Resident Inspector
S. Ninh, Senior Project Engineer
J. Seat, Project Engineer
Approved By:
Thomas A. Stephen, Chief
Reactor Projects Branch #5
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Sequoyah Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)
- (1) The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.
- Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems.
- Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits and self-assessments.
- Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.
INSPECTION RESULTS
Assessment 71152B Based on the samples reviewed, the team determined that the licensee's corrective action program (CAP) complied with regulatory requirements and self-imposed standards. The licensee's implementation of the CAP adequately supported nuclear safety.
1. Corrective Action Program Effectiveness
Problem Identification: The team determined that the licensee was generally effective in identifying problems and entering them into the CAP at the appropriate threshold. This conclusion was based upon the inspectors review of the requirements for initiating condition reports (CR) as prescribed by licensee procedure, NPG-SPP-22.300, "Corrective Action Program," and site management's expectation that employees are encouraged to initiate CRs. The inspection team observed licensee staff at the Plant Screening Committee (PSC)and Management Review Committee (MRC) meetings actively questioning and challenging CRs to ensure issues were adequately documented and entered into the CAP. Based on samples reviewed, the inspectors determined that licensee staff adequately trend equipment and programmatic issues at an appropriate level. The inspectors performed walkdowns, reviewed CRs, and system health and trend reports for the Component Cooling System (CCS), Emergency Diesel Generators, and Essential Raw Cooling Water (ERCW)
System. Based on reviews and system walkdowns, the inspectors determined that deficiencies were being identified and entered into the CAP. Overall, the team determined that issues were being identified and documented at the appropriate threshold.
Problem Prioritization and Evaluation: Based on the review of CRs sampled by the inspection team during the onsite period, the inspectors concluded that problems were prioritized and evaluated in accordance with the CAP requirements prescribed in procedure NPG-SPP-22.300. Based on reviews and observations, the inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors reviewed causal analyses to ensure licensee staff appropriately considered the extent of condition or problem, generic issues, and previous occurrences of the issue. The inspectors determined that plant personnel had generally conducted cause evaluations in compliance with the CAP procedures and performed adequate levels of analysis based on the significance of the issue being evaluated. Overall, the licensee's process for evaluating and prioritizing issues supported nuclear safety.
Effectiveness of Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that corrective actions were effective, timely, and commensurate with the safety significance of the issues. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence. The inspectors reviewed CRs and effectiveness reviews, as applicable, to verify that the significant conditions adverse to quality had not recurred. Effectiveness reviews for corrective actions to preclude repetition (CAPR) were sufficient to ensure corrective actions were properly implemented and were effective. The inspectors reviewed corrective action documents for NRC findings issued since the last problem, identification, and resolution (PI&R) biennial inspection. The team determined that corrective actions completed or planned, including expected completion dates, were adequate to address the NRC findings.
2. Use of Operating Experience (OE)
Based on a review of selected documentation related to OE issues, the team determined that the licensee was effective in screening operating experience for applicability to the plant. Industry OE was evaluated at either the corporate or plant level depending on the source and type of document. Relevant information was forwarded to the applicable department for further action or informational purposes. Operating experience issues requiring action were entered into the CAP for tracking and closure. The team determined that the licensee's use of industry and NRC OE was effective, and the program adequately supported nuclear safety.
3. Self-Assessments and Audits
The team determined that the scopes of assessments and audits were adequate. Self-assessments were generally detailed and critical. The team verified that CRs were created to document areas for improvement and findings resulting from self-assessments, and that actions had been completed consistent with the staff recommendations. Audits of the quality assurance program appropriately assessed performance and identified areas for improvement. Generally, the licensee performed evaluations that were technically accurate.
4. Safety Conscious Work Environments (SCWE)
Based on interviews with plant staff and reviews of the employee concerns program (ECP),
CRs, and the latest safety culture assessment results, the inspectors found no evidence of challenges to the safety conscious work environment. Employees interviewed appeared willing to raise nuclear safety concerns through at least one of several means available.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 24, 2021, the inspectors presented the biennial problem identification and resolution inspection results to Mr. Chris Reneau, Plant Manager, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
1096744
1191019
246672
1364613
1376156
1383541
1393611
1396860
1404119
1404171
24070
1436447
1438327
1459288
1466649
1467085
1469779
1478023
1485220
1491999
1497144
1497873
1498586
1507644
1507948
1508834
1513074
1515689
1516260
20621
20726
22545
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
24521
26168
26428
27311
28237
28243
29074
1530154
1530159
1532058
1533146
1534118
1535543
1536556
1536791
1537213
1537226
1539112
1539126
1544222
1544227
1544846
1548593
1546981
1547878
1550548
1550552
1551560
1553230
1554178
1556233
1558970
1559230
1559287
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1560185
1560409
1561136
1561202
1563833
1565699
1566459
1572651
1573093
1573472
1573726
1578600
1578708
1579205
1580587
1580779
1586184
1587965
1587974
1590030
1590551
1596820
1599699
1600942
1600953
1601743
1602795
1607309
1607353
1611217
1611705
1615005
1616525
1616533
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1618274
20231
25313
25372
25456
26031
27192
27194
27752
28045
28188
29477
1634550
1636605
1639059
1641685
1641712
1641725
1641731
1646424
1646839
1647725
1649323
1649710
1651597
1651613
1652910
1656464
1656894
1659301
1670044
1673465
1679682
1679684
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1679685
1680819
1683540
1687263
1689360
1690542
1691677
1699840
1516474
1516581
1516583
1517306
1518410
1554059
1554316
1557934
1565732
1580909
22043
1676122
1555831
1563326
1563420
1605671
1605726
1559894
1559882
1573190
22540
29694
1544976
1543380
1544977
1549710
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1554245
1554234
1548304
1548308
1548377
1548502
1548619
1586834
1586823
1659406
1636692
1616076
1647730
1658103
1672639
1619939
1353663
Corrective Action
Documents
Resulting from
Inspection
1698257,
1698617,
1700017,
1700043,
1700055,
1700060,
1700061,
1700062,
1700063,
1700064,
1700235,
1700289,
1700303,
1703096,
1703331
Drawings
1, 2-37W206-8
Mechanical Pumping Station Piping & Equipment
Revision 4
1, 2-47W845-1
Mechanical Flow Diagram - Essential Raw Cooling Water
Revision 54
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
System
1, 2-47W845-2
Mechanical Flow Diagram - Essential Raw Cooling Water
System
Revision 116
1, 2-47W845-5
Mechanical Flow Diagram - Essential Raw Cooling Water
System
Revision 63
Engineering
Changes
DCN T12553-A
Authorize use of Rains Flo packing on the ERCW pumps and
CCS pumps
Revision A
Engineering
Evaluations
SQN-20-1852
Qualify 47A056-1006 Supports Installed in the EDGB
2/10/2020
Miscellaneous
Level 2 Evaluation Report - Operations Department
Performance Gap
Revision 0
SQN Plant Screening Committee Package
06/10/2021
SQN Management Review Committee Meeting Agenda
06/10/2021
Level 2 Evaluation Report - Elevated Condensate Pressure
resulted in #3 HDT Runback and Rx Trip
01/13/2020
Level 2 Evaluation for CR 1559894
Operations Department Performance Assessment
2/28/2021
Operations Department Performance Assessment
06/30/2020
Control Room Deficiencies
04/09/2021
DC-V-13.9.9
Design Criteria - Component Cooling Water System (70)
Revision 29
SQN-DC-V-11.8
Diesel Generator and Auxiliary System Design Criteria
Document
Revision 15
SQN-DC-V-12.1
Flood Protection Provisions
Revision 21
System #67 -
Essential Raw
Cooling Water
Health Report Summary - P1
FY20 (Oct -
Mar)
System #67 -
Essential Raw
Cooling Water
Health Report Summary - P2
FY19 (Apr -
Sep)
System #70 -
Component
Cooling System
Health Report Scorecards - P2
FY18 - FY20
Procedures
NEDP-22
Operability Determinations and Functional Evaluations
Revision 21
NEDP-27
Past Operability Evaluations
Revision 5
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NPG-SPP-01.16
Condition Report Initiation
Revision 4
NPG-SPP-
09.0.1.1
System Monitoring and Trending
Revision 3
NPG-SPP-09.16
Plant Health Committee and Plant Health Sub-Committee
Revision 15
NPG-SPP-09.7
Corrosion Control Program
Revision 8
NPG-SPP-09.7.4
Boric Acid Corrosion Control Program
Revision 7
NPG-SPP-
2.000
Performance Improvement Program
Revision 10
NPG-SPP-
2.102
NPG Self-Assessment and Benchmarking Programs
Revision 10
NPG-SPP-
2.300
Corrective Action Program
Revision 21
NPG-SPP-
2.500
Operating Experience Program
Revision 14
NPG-SPP-
2.600
Issue Resolution
Revision 10
0-PI-CEM-015-
001.0
Steam Generator Hideout Return Sampling and Analysis
Revision 4
0-SI-OPS-067-
2.M
ERCW Flow Balance Valve Position Verification
Revision 35
0-SO-67-1
Essential Raw Cooling Water
Revision 114
0-SO-67-3
ERCW Strainers and Traveling Screens
Revision 33
0-TI-CEM-000-
001.1
Secondary Chemistry Specifications
Revision 63
0-TI-CEM-000-
001.3
Primary Chemistry Specifications
Revision 92
0-TI-CEM-000-
001.4
Auxiliary System and Common System Chemistry
Specifications
Revision 49
0-TI-DXX-000-
097.1
Boric Acid Control Program
Revision 15
0-TI-DXX-000-
915.0
Underground Piping and Tanks Integrity Program
Revision 7
0-TI-OPS-000-
2.64
Locked Valve List
Revision 33
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NPG-SPP-01.7.1
Employee Concerns Program
Revision 5
NPG-SPP-03.4
Maintenance Rule Performance Indicator Monitoring,
Trending and Reporting - 10CFR50.65
2/05/2014
NPG-SPP-
09.0.1.1
System Walkdown Checklist
Revision 7
NPG-SPP-09.15
Underground Piping and Tanks Integrity Program
Revision 9
NPG-SPP-
09.18.13
Equipment Failure Trending
Revision 2
TI-4
Maintenance Rule Performance Indicator Monitoring,
Trending, and Reporting - 10CFR50.65
Revision 35
Self-Assessments
Biennial Self-Assessment - Nuclear Safety Culture
11/15/2019 -
2/15/2019
SSA1907
Audit Report, Radiation Protection and Radwaste Sequoyah
Nuclear Plant (SQN)
07/15/2019 -
07/26/2019
CR 1553713
Shift Manager Effectiveness in Driving Crew Performance
Improvements
10/09/2019
CR 1582138
Bi-Monthly CAP Assessment
01/29/2020
CR 1598305
Pre-NIEP Self Assessment
05/15/2020
CR 1629512
Bi-Monthly CAP Assessment
08/13/2020
CR 1642281
NRC Graded Exercise/Baseline Inspection - Improvement
Opportunities
Revision 0
CR 1642686
Bi-Monthly CAP Assessment
10/15/2020
CR 1653113
Assess Operations implementation of the Clearance process
Revision 0
CR 1653137
Evaluate current status of operations department leadership
and team effectiveness and identify improvement
opportunities
Revision 0
CR 1659297
Bi-Monthly CAP Assessment
2/16/2020
CR 1659297
Bi-Monthly CAP Assessment
2/16/2020
CR 1673828
Bi-Monthly CAP Assessment
2/23/2021
CR 1675152
21 SQN Pre-Problem Identification and Resolution (PI&R)
Self-Assessment
03/01/2021 -
03/18/2021
CRP-QA-SA-20-
001 (CR
QA Assessment Program
11/06/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1553757)
CRP-QA-SA-20-
2 (CR
1555201)
QA Post DNP Assessment Program
2/20/2019
QA-SQ-19-011
Sequoyah Nuclear Plant - Quality Assurance June Site
Report
07/09/2019
QA-SQ-19-018,
Revision 1
Sequoyah Nuclear Plant - Quality Assurance September Site
Report
10/17/2019
QA-SQ-20-001
Sequoyah Nuclear Plant - Quality Assurance December Site
Report
01/08/2020
QA-SQ-20-008
Sequoyah Nuclear Plant - Quality Assurance March Site
Report
04/08/2020
QA-SQ-20-015
Sequoyah Nuclear Plant - Quality Assurance June Site
Report
07/09/2020
QA-SQ-20-022
Sequoyah Nuclear Plant - Quality Assurance September Site
Report
10/08/2020
QA-SQ-21-001
Sequoyah Nuclear Plant - Quality Assurance December Site
Report
01/12/2021
SQN-CEM-SA-
19-004
Secondary Chemistry Control
2/07/2019
SQN-CEM-SA-
19-006
Chemical Traffic Control Self-Assessment
01/07/2019
SQN-CEM-SA-
20-001
Chemistry QA/QC Self-Assessment
09/08/2020
SSA1906
Audit Report, Chemistry, Effluent, and Environmental
Monitoring Sequoyah (SQN)
06/03/2019 -
06/14/2019
SSA2002
Audit Report, Security and Safeguards Information (SGI),
Sequoyah Nuclear Plant
01/06/2020 -
01/16/2020
SSA2004
Audit Report, Maintenance, Sequoyah Nuclear Plant
03/16/2020 -
03/30/2020
SSA2107
Audit Report, Corrective Action Program
01/19/2021 -
01/28/2021
Work Orders
119534627
119593079
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
20011394
20323404
20405727
20556874
20561705
20609457
20609581
20715080
20799515
20845914
20915544
21128321
21274740
21276488
21283139
21352981
21353681
21367674
21583869
21702254
21722819
21749911
21923081
2090528