Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 August 17, 2023 10 CFR 50.4 10 CFR 50.55a ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-77 NRC Docket No. 50-327
Subject:
Unit 1 Cycle 25 Refueling Outage Day Inservice Inspection Summary Report - Supplement
Reference:
TVA letter to NRC, ³Unit 1 Cycle 25 Refueling Outage Day Inservice Inspection Summary Report,' dated February 22, 2023 On February 22, 2023, the Tennessee Valley Authority (TVA) submitted the referenced letter in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Article IWA-6240 and Code Case N-532-5. A subsequent work order review identified that repair of the B-B Emergency Gas Treatment System cooler coil should have been reported under Table 2 of the Owner¶s Activity Report. Per ASME Code Case N-532-5, utilities are required to submit an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria.
The Enclosure to this letter contains a revised Owner¶s Activity Report that supersedes the one provided in the referenced letter. This issue has been entered into the TVA corrective action program for resolution.
There are no regulatory commitments associated with this submittal. Should you have any questions, please contact Rick Medina, Site Licensing Manager at (423) 843-8129.
Respectfully, Thomas Marshall Site Vice President Sequoyah Nuclear Plant
U.S. Nuclear Regulatory Commission Page 2 August 17, 2023
Enclosure:
Supplement to ASME Section XI Inservice Inspection Summary Report, Unit 1 Cycle 25 Refueling Outage cc (Enclosure):
NRC Regional Administrator +/- Region II NRC Senior Resident Inspector +/- Sequoyah Nuclear Plant NRC Project Manager +/- Sequoyah Nuclear Plant
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNIT 1 SUPPLEMENT TO ASME SECTION XI INSERVICE INSPECTION
SUMMARY
REPORT UNIT 1 CYCLE 25 REFUELING OUTAGE