IR 05000327/2020005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020005 and 05000328/2020005
ML20232A164
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/18/2020
From: Tom Stephen
NRC/RGN-II
To: Jim Barstow
Tennessee Valley Authority
References
IR 2020005
Download: ML20232A164 (5)


Text

August 18, 2020

SUBJECT:

UPDATED INSPECTION PLAN FOR SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000327/2020005 AND 05000328/2020005

Dear Mr. Barstow:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022 for Sequoyah Nuclear Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP),

including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE.

These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In addition to the ROP baseline inspections, we also plan to conduct an Initial License Examination.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.

Please contact me at (404) 997-4703 with any questions you may have regarding this letter.

Sincerely,

/RA/

Thomas Stephen, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure:

Sequoyah Inspection/Activity Plan (9/01/2020 - 06/30/2022)

cc: Distribution via ListServ

ML20232A164 OFFICE RII: DRP RII: DRP RII: DRP NAME S. Ninh D. Hardage T. Stephen DATE 8/17/2020 8/18/2020 8/18/2020

IP 22 Inspection Activity Plan Report Sequoyah 09/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count SEQUOYAH REQUAL INSPECTION 2 1, 2 10/05/2020 10/09/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance LIMITED SCOPE TACTICAL RESPONSE DRILLS - SEQ 6 1, 2 10/05/2020 10/09/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited EMERGENCY PREPAREDNESS EXERCISE 5 1, 2 10/12/2020 10/16/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 10/12/2020 10/16/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/12/2020 10/16/2020 IP 71114.08 000723 Exercise Evaluation  Scenario Review 1, 2 10/12/2020 10/16/2020 IP 71151 001397 Performance Indicator Verification EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS 3 1, 2 03/08/2021 03/12/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments SECURITY BASELINE INSPECTION 3 1, 2 03/22/2021 03/26/2021 IP 71130.02 000734 Access Control 1, 2 03/22/2021 03/26/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 03/22/2021 03/26/2021 IP 71130.07 000739 Security Training 1, 2 03/22/2021 03/26/2021 IP 71130.09 001656 Security Plan Changes 1, 2 03/22/2021 03/26/2021 IP 71151 001338 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION +SG 2 1 04/12/2021 04/16/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 06/07/2021 06/11/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 06/21/2021 06/25/2021 IP 71152B 000747 Problem Identification and Resolution RP PUBLIC RAD SAFETY INSPECTION 2 1, 2 07/12/2021 07/16/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/12/2021 07/16/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/12/2021 07/16/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation 1, 2 07/12/2021 07/16/2021 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 2 This report shows only on-site and announced inspection procedures.

8/12/2020 11:23:37 AM

IP 22 Inspection Activity Plan Report Sequoyah 09/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 08/02/2021 08/06/2021 IP 71111.07T 000700 Heat Sink Performance UNIT 2 IN-SERVICE INSPECTION +SG 2 2 10/04/2021 10/08/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2 1, 2 10/04/2021 10/08/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/04/2021 10/08/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/04/2021 10/08/2021 IP 71151 000746 Performance Indicator Verification EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2 1, 2 12/06/2021 12/10/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 12/06/2021 12/10/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 12/06/2021 12/10/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 12/06/2021 12/10/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 12/06/2021 12/10/2021 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1, 2 01/24/2022 01/28/2022 IP 71130.02 000734 Access Control 1, 2 01/24/2022 01/28/2022 IP 71130.09 001656 Security Plan Changes 1, 2 01/24/2022 01/28/2022 IP 71151 001338 Performance Indicator Verification SEQUOYAH INITIAL LICENSE EXAM 6 1, 2 03/28/2022 04/01/2022 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 05/02/2022 05/13/2022 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6 1, 2 06/06/2022 06/10/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 06/20/2022 06/24/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities. Page 2 of 2 This report shows only on-site and announced inspection procedures.

8/12/2020 11:23:37 AM