MONTHYEARIR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 – Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 – Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 – NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 – NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 – Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 – Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 – Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20223012022-05-10010 May 2022 NRC Operator Licensing Examination Approval 05000327/2022301 and 05000328/2022301 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20220102021-12-15015 December 2021 Notification of Sequoyah Nuclear Plant - Design Bases Assurance Inspection (Teams) - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter IR 05000327/20200032020-11-10010 November 2020 Integrated Inspection Report 05000327/2020003, 05000328/2020003 and 07200034/2020002 IR 05000327/20200122020-10-20020 October 2020 Plants - Triennial Fire Protection Inspection Report 05000327/2020012 and 05000328/2020012 2024-08-26
[Table view] Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 & 2 - NRC INSPECTION REPORT 05000327/2023440 AND 05000328/2023440; PRELIMINARY GREATER THAN GREEN AND APPARENT VIOLATION
Dear Mr. Barstow:
This letter transmits the results of the NRCs initial review of a finding that has preliminarily been determined to be Greater than Green, a finding of greater than very low safety significance resulting in the need for further evaluation to determine significance and therefore the need for additional NRC action. This finding was assessed based on the best available information, using the Baseline Security Significance Determination Process (BSSDP).
The finding is also an apparent violation of NRC requirements and is being considered for escalated enforcement action in accordance with the Enforcement Policy, which can be found on the NRCs Web site at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.
In accordance with NRC Inspection Manual Chapter (IMC) 0609, we intend to complete our evaluation using the best available information and issue our final determination of safety significance within approximately 90 days of the date of this letter. The significance determination process encourages an open dialogue between the NRC staff and the licensee; however, the dialogue should not impact the timeliness of the staffs final determination.
Before we make a final decision on this matter, we are providing you with an opportunity to (1)
attend a Regulatory Conference where you can present to the NRC your perspective on the facts and assumptions the NRC used to arrive at the finding and assess its significance, or (2)
submit your position on the finding to the NRC in writing. If you request a Regulatory Conference, it should be held within 40 days of the receipt of this letter, and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. February 10, 2023 The focus of the Regulatory Conference is to discuss the significance of the finding and not necessarily the root cause(s) or corrective action(s) associated with the finding. If a Regulatory Conference is held, it will be closed for public observation due to the security sensitivity of the issue. If you decide to submit only a written response, such submittal should be sent to the NRC within 40 days of your receipt of this letter.
If you choose to send a response, it should be clearly marked as a "Response to An Apparent Violation; (EA-22-129)" and should include for the apparent violation(s): (1) the reason for the apparent violation or, if contested, the basis for disputing the apparent violation; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken; and (4) the date when full compliance will be achieved. Your response should be submitted under oath or affirmation and may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response.
Additionally, your response should be sent to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Center, Washington, DC 20555-0001 with a copy to Mrs. Jannette Worosilo, Branch Chief, U.S. Nuclear Regulatory Commission, Region 2, 245 Peachtree Center Avenue N.E., Suite 1200, Atlanta, GA 30303 within 40 days of the date of this letter. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC will proceed with its enforcement decision or schedule a Regulatory Conference.
If you decline to request a Regulatory Conference or to submit a written response, you relinquish your right to appeal the final SDP Regulatory Conference or to submit a written response, you relinquish your right to appeal determination, in that by not doing either, you fail to meet the appeal requirements stated in the Prerequisite and Limitation sections of Attachment 2 of NRC Inspection Manual Chapter 0609.
Please contact Mrs. Jannette Worosilo at 404-997-4485 and in writing within 10 days from the issue date of this letter to notify the NRC of your intentions. If we have not heard from you within 10 days, we will continue with our significance determination and enforcement decision. The final resolution of this matter will be conveyed in separate correspondence.
Because the NRC has not made a final determination in this matter, no Notice of Violation is being issued for this inspection finding at this time. In addition, please be advised that the number and characterization of the apparent violation described in the enclosed inspection report may change as a result of further NRC review.
For administrative purposes, this inspection report provides an update to the apparent violation documented in NRC inspection report 05000327/2022440 and 05000328/2022440 (Agency Documents Access and Management System (ADAMS) ML23017A173) dated January 17, 2023.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice and Procedure, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room and in the NRCs Agencywide Documents Access and Management System, accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html. However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or in the NRC's Agencywide Documents Access and Management System, accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html. If Security Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely, Laura M. Pearson, Acting Director Division of Reactor Safety Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79 Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Pearson, Laura on 02/10/23