March 26, 2020
Mr. Jim Barstow
Vice President
Tennessee Valley Authority
Chattanooga, TN 37402-2801
SUBJECT: SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY
INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and
Dear Mr. Barstow:
On July 20, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance
with Inspection Procedure (IP) 71130.10P Cyber-Security, Revision 0 at Sequoyah Nuclear Plant. The
inspection will be performed to evaluate and verify your ability to meet the Milestone 8 (i.e., full
implementation) requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations
(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks.
The onsite portion of the inspection will take place during the weeks of July 20, 2020, and August 3,
2020.
Experience has shown that these types of inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a
productive inspection for both parties, we have enclosed a request for documents needed for the
inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas
(i.e., sample set) to be inspected by the cyber-security IP. This information should be made available
via secure site (i.e., SharePoint, Certrec) no later than April 27, 2020. The inspection team will review
this information and, by May 25, 2020, will request the specific items that should be provided for
review.
The second group of additional requested documents will assist the inspection team in the evaluation of
the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the
licensees CSP selected for the cyber-security inspection. This information will be requested for review
via secure site (i.e., SharePoint, Certrec) before June 24, 2020.
The third group of requested documents consists of those items that the inspection team will review, or
need access to, during the inspection. Please have this information available by the first day of the
onsite inspection, July 20, 2020.
J. Barstow 2
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a
result of the inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. It is important that all of these documents are up to
date and complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Melana Singletary. We understand that our regulatory contact
for this inspection is Mr. Zachary Kitts of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 404-997-4752 or via e-mail at
Melana.Singletary@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the
NRC's "Rules of Practice," a copy of this letter and its enclosure will not be available electronically for
public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-327 and 50-328
License Nos. DPR-77 and DPR-79
Enclosure:
Security Inspection Document Request
cc: See Page 3
3
cc:
Jeff Sowa
Site Licensing Manager
Sequoyah Nuclear Plant
Tennessee Valley Authority
Soddy Daisy, TN 37384-2000
Zachary Kitts
Licensing
Sequoyah Nuclear Plant
Tennessee Valley Authority
Soddy Daisy, TN 37384-2000
4
SUBJECT: SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY
INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and
DISTRIBUTION:
M. Singletary, RII
L. Jones, RII
C. DeBisschop, NSIR
A. Konkal, NSIR
PUBLIC
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: _ML20086M006 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII/DRS/EB2 RII:DRS/EB2
SIGNATURE MJS6 SMS
NAME MSINGLETAR SSHAEFFER
DATE 3/26/2020 3/26/2020
E-MAIL COPY? YES NO YES NO
SEQUOYAH NUCLEAR PLANT CYBER SECURITY INSPECTION DOCUMENT REQUEST
Inspection Reports: 05000327/2020401 and 05000328/2020401
Inspection Dates: Weeks of July 20, 2020, and August 3, 2020
Inspection Procedure: IP 71130.10P, Cyber-Security, Revision 0
Reference: ML17156A215, Guidance Document for Development of the Request
for Information (RFI) and Notification Letter for Full-Implementation of
the Cyber-Security Inspection, Revision 0
NRC Inspectors: Melana Singletary, Lead Larry Jones
404-997-4752 404-997-4837
Melana.Singletary@nrc.gov Larry.Jones@nrc.gov
NRC Contractors: Cynthia DeBisschop Al Konkal
Cynthia.DeBisschop@nrc.gov Alan.Konkal@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team
with the general information necessary to select appropriate components and CSP elements to
develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems
and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control
portions of the CSP to be chosen as the sample set required to be inspected by the cyber-
security IP. The first RFIs requested information is specified below in Table RFI #1. The
Table RFI #1 information is requested to be provided by, April 27, 2020 or sooner, to facilitate
the selection of the specific items that will be reviewed during the onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused
follow-up request to develop the second RFI. The inspection team will submit the specific
systems and equipment list to your staff by May 25, 2020, which will identify the specific
systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,
and the areas of the licensees CSP selected for the cyber-security inspection. We request that
the additional information provided from the second RFI be made available by May 25, 2020.
All requests for information shall follow the guidance document ML17156A215 referenced
above.
The required Table RFI 1 information shall be provided via secure site (i.e., Sharepoint, Certrec)
by April 27, 2020. The preferred file format for all lists is object character recognition (OCR)
readable or a searchable Excel spreadsheet file. These files should be indexed and hyper-linked
Enclosure
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
2
to facilitate ease of use. If you have any questions regarding this information, please call the
inspection team leader as soon as possible.
Table RFI #1
Section 3,
Paragraph Number/Title: Items
1 List All Identified Critical Systems and Critical Digital Assets All
List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet All
2 Protocol (TCP/IP) based Local Area Networks (LANs) and identify those LANs
that have non-CDAs on them
List CDA facility and site non-ethernet TCP/IP based LANs including those All
3
industrial networks and identify LANs that have non-CDAs on them
Network Topology Diagrams (be sure to include all NIDS and SIEMs for EP All
4
networks and Security level 3 and 4 networks)
List all network security boundary devices for EP networks and all network All
8
security boundary devices for levels 3 and 4
9 List CDA wireless Industrial networks All
Network intrusion detection system documentation for Critical Systems that 11.a.1)
11
have CDAs associated with them 11.a.2)
Security Information and Event Management (SIEM) documentation for 12.a.1)
12
Critical systems that have CDAs associated with them 12.a.2)
14 List EP and Security onsite and offsite digital communication systems All
25 Cyber-Security Assessment and Cyber-Security Incident Response Teams All
Copy of Current Cyber Security Plan and copy of any 50.54(p) analysis to All
28
support changes to the plan
In addition to the above information please provide the following:
(1) Electronic copy of the UFSAR and technical specifications.
(2) Name(s) and phone numbers for the regulatory and technical contacts.
(3) Current management and engineering organizational charts.
Based on this information, the inspection team will identify and select specific systems and
equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of
specific systems and equipment to your staff by May 25, 2020 for the second RFI (i.e., RFI #2).
2
II. Additional Information Requested to be Available Prior to Inspection.
As stated in Section I above, the inspection team will examine the returned documentation
requested from Table RFI #1 and submit the list of specific systems and equipment to your staff
by May 25, 2020 for the second RFI (i.e., RFI #2). The second RFI will request additional
information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the
licensees CSP selected for the cyber-security inspection. The additional information requested
for the specific systems and equipment is identified in Table RFI #2. All requested information
shall follow the guidance document ML17156A215 referenced above.
The Table RFI 2 information shall be provided on secure site (i.e., Sharepoint or Certrec) by May
25, 2020. The preferred file format for all lists is object character recognition (OCR) readable or a
searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate
ease of use. If you have any questions regarding this information, please call the inspection
team leader as soon as possible.
Table RFI #2
Section 3,
Paragraph Number/Title: Items
Plant Computer System Block Diagram (if Plant Computer System is selected All
5
for inspection)
Plant Security System Block Diagram (if Security Computer System is All
6
selected for inspection)
Systems that are distributed Block Diagrams (for systems selected for All
7
inspection)
Host-Based Intrusion Detection System Documentation (for CDAs for 10.a.1)
10
systems selected for inspection) 10.a.2)
List all Maintenance and Test Equipment (M&TE) used on CDAs for systems All
13
selected for inspection
15 Configuration Management All
16.a.
16 Supply Chain Management
16.b
17 Portable Media and Mobile Device Control All
18 Software Management All
20 Vendor Access and Monitoring All
21 Work Control All
3
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
22 Device Access and Key Control All
23 Password/Authenticator Policy All
24 User Account/Credential Policy All
26 Corrective Actions since last NRC inspection All
27 Cyber-Security Assessments for Selected Systems All
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II above, provide the following RFI
(i.e., Table 1ST Week Onsite) by July 20, 2020, the first day of the inspection. All requested
information shall follow the guidance document ML17156A215 referenced above.
The preferred file format for all lists is object character recognition (OCR) readable or a
searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate
ease of use. If you have any questions regarding this information, please call the inspection
team leader as soon as possible.
Table 1ST Week Onsite
Section 3,
Paragraph Number/Title: Items
10.a.3)
Host-Based Intrusion Detection System Documentation (for CDAs for
10 thru
systems selected for inspection)
10.a.12)
11.a.3)
Network Intrusion Detection System Documentation for Critical Systems
11 thru
that have CDAs associated with them
11.a.15)
12.a.3)
Security Information and Event Management (SIEM) Documentation for
12 thru
Critical Systems that have CDAs associated with them
12.a.14)
16 Supply Chain Management 16.c
19 Cyber-Security Event Notifications All
4
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the inspection
team as long as the inspectors have easy and unrestrained access to them.
a. Updated Final Safety Analysis Report, if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided; and
g. Vendor Manuals, for applicable systems selected
(2) Assessment and Corrective Actions:
a. The most recent Cyber-Security Quality Assurance (QA) audit and/or
self-assessment; and
b. The last 73.55(m) assessment performed; and
c. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent Cyber-Security
Quality Assurance (QA) audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provided daily during the inspection to
each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team.
5