SUBJECT:

SEQUOYAH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000327/2023401 AND 05000328/2023401

Dear James Barstow:

On January 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant and discussed the results of this inspection with Mr. M. Lovitt and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000327 and 05000328

License Numbers:

DPR-77 and DPR-79

Report Numbers:

05000327/2023401 and 05000328/2023401

Enterprise Identifier:

I-2023-401-0019

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah Nuclear Plant

Location:

Soddy-Daisy, TN

Inspection Dates:

January 9-13, 2022 (TVA Corporate Office)

January 23-25, 2022 (Sequoyah Nuclear Station)

Inspectors:

J. Tornow, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

R. Womack, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the Access authorization program. The following elements were

evaluated: Access Authorization

(1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)

Tier III: ( 02.09, 02.10 a-c)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements Tier II: (02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)

Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 25, 2023, the inspectors presented the security baseline inspection results to Mr. M. Lovitt and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1747436

Incorrect individual's UA termed

01/20/2022

Corrective Action

Documents

1791815

Learning 1 Denial Letter

08/01/2022

NSDP-23

Plant Access / Badging Process

Revision 21

NSDP-24

Access Authorization Program

Revision 15

NSDP-38

Access Authorization - Reviewing Officials

Revision 11

NSDP-43

Adjudication Guidelines

Revision 7

71130.01

Procedures

SPP-14.5

Access Authorization

Revision 23

1772365

Advanced notification

05/03/2022

Corrective Action

Documents

1788248

FFD Testing Delay

07/11/2022

Corrective Action

Documents

Resulting from

Inspection

1793435

FFD Performance data

08/09/2022

NPG-SPP-14.1

Fitness-For-Duty

Revision 21

NPG-SPP-14.10

Fitness-for-Duty - Alcohol and Drug

Testing Requirements

Revision 6

NPG-SPP-14.11

Fitness-for-Duty - Medical Review

Officers

Revision 3

NPG-SPP-14.13

Fitness-for-Duty - Administrative

Duties

Revision 5

71130.08

Procedures

NPG-SPP-14.14

Fitness-for-Duty - Training and Field

Support