April 13, 2023
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000327/2023402 AND 05000328/2023402
Dear James Barstow:
On March 23, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant, Units 1&2 and discussed the results of this inspection with Matt Lovitt and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000327 and 05000328
License Numbers:
Report Numbers:
05000327/2023402 and 05000328/2023402
Enterprise Identifier:
I-2023-402-0007
Licensee:
Tennessee Valley Authority
Facility:
Sequoyah Nuclear Plant, Units 1&2
Location:
Soddy-Daisy, TN
Inspection Dates:
March 20, 2023 to March 23, 2023
Inspectors:
J. Justice, Sr. Physical Security Inspector
J. Tornow, Physical Security Inspector
R. Womack, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah Nuclear Plant, Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
- (1) Tier I: All Requirements Tier II: 02.05(a-c), 02.06(a), 02.07(a-d)
Tier III: 02.08
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated August 23, 2018.
Equipment Performance, Testing, and Maintenance (1 Sample)
- (1) Tier I: All requirements Tier II: 02.09(a,b), 02.12(a), 02.13(a) Tier III: 02.14, 02.15(a)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
- (1) Tier I: All Requirements Tier II: 02.05(a,b,c,d), 02.06(a), 02.09(a,b)
Tier III: 02.10, 02.11(a), 02.12(a), 02.13(a,b)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC inspection of this program area, Security Plan Revision 22, was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) Unit 1 February 2022 through February 2023 Unit 2 February 2022 through February
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 23, 2023, the inspectors presented the security baseline inspection results to Mr. Matt Lovitt and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1771717
ACP Exit Door
4/21/22
Corrective Action
Documents
23306
Visitor Badge
1/5/22
NPG-SPP-14.4
Nuclear Security
Revision 14
NPG-SPP-14.5
Access Authorization
Revision 23
NSDP 7.6
Personnel Access Control
Revision 2
NSDP 7.7
Vehicle Access Control
Revision 5
Procedures
NSDP-8
Keys and Locks
Revision 9
Work Orders
Locks, Cores and Keys
4/5/2022
1844461
Response box inventory not conducted
03/23/2023
1844987
Search train
03/23/2023
1844988
Security Backup Diesel Test
03/23/2023
Corrective Action
Documents
Resulting from
Inspection
1844996
VBS Test observation
03/23/2023
0-PI-OPS-000-
677.0
Functionality Test of Security Backup Diesel Generator
Revision 45
0-PI-SFT-245-
004.0
Security UPS Operability Test
Revision 6
CTP-0-SEC-FPI-
245.S
Perimeter Intrusion Detection System Performance Test
Revision 5
CTP-0-SEC-FPI-
630.W
Perimeter Intrusion Detection And CCTV Systems Operability
Test
Revision 2
CTP-0-SEC-FPI-
643.W
X-Ray Equipment Operability/Performance Test
Revision 4
NSDP-15.1
Testing and Maintenance
Revision 2
NSDP-26
Weapons Accountability and Security Response Equipment
Revision 23
Procedures
NSDP-46
Security Respirator Protection Program
Revision 7
2243708
SQN-20-1991: Terminate the new security UPS, and
complete conduit installations
07/26/2021
Work Orders
2370700
CTP-0-SEC-FPI-245.S Perimeter Intrusion Detection System
Performance Test
07/29/2022
Corrective Action
Documents
1836570
1799334
1768069
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1755216
25011
Corrective Action
Documents
Resulting from
Inspection
1845012
1844374
3M Scott M95/M110 Full Face Respirator Vendor Manual
Miscellaneous
C50 The All Challenge Mask, AVON Protection Vendor
Manual
NPG-SPP-14.8
Guideline for Security Response to Indications of Tampering,
Vandalism, and Malicious Mischief
Revision 3
NSDP-18
Administration of Security Training
Revision 22
NSDP-30
Security Duty Restrictions/Return to Work
Revision 10
NSDP-4
Security Organization, Expectations, and Standards
Revision 26
NSDP-44
Graded Systematic Approach to Security Training (GSAST)
Revision 11
NSDP-44.1
Security On The Job Training
Revision 8
NSDP-44.2
Security Task Performance Evaluation
Revision 8
Procedures
NSDP-46
Security Respirator Protection Program
Revision 7
Corrective Action
Documents
1784257
Security Plan Changes
6/23/22
Procedures
NSDP-45
Security Plan and Procedure Control
Processing
Revision 3
71151
Miscellaneous
PI Summary Report
3/6/2023