(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML22339A0022022-12-0505 December 2022 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML22221A2562022-08-0808 August 2022 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21349A9162021-08-19019 August 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20191A0772020-07-0808 July 2020 Revision of Three Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20149K4512020-05-28028 May 2020 Revision of Five Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20118C3902020-04-26026 April 2020 Revision of Four Procedures and Fourteen Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML19346D6692019-12-0505 December 2019 Summary of Changes to Two Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML19247C0712019-08-29029 August 2019 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan ML19238A0682019-08-15015 August 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19225C6852019-08-0101 August 2019 Errata for Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) ML19100A1322019-03-28028 March 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19036A6162019-01-30030 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML19009A0942019-01-0303 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML18344A0512018-12-0303 December 2018 Summary of Changes to Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) ML18318A3152018-11-0606 November 2018 Summary of Changes to Four Procedures and One Form That Implement the Radiological Emergency Response Plan ML18283A3252018-10-0202 October 2018 Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18268A1362018-09-18018 September 2018 Revision of Four Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML18268A1372018-09-18018 September 2018 Summary of Changes to Four Procedures and Four Forms That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) ML18178A1742018-06-21021 June 2018 Summary of Changes to Three Procedures That Implement Radiological Emergency Response Plan ML18093A4542018-03-22022 March 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML18026A6212018-01-0404 January 2018 Attachment to RA 18-0001, Summary of Changes to One Procedure EPP 06-006, Rev. 9A That Implements the Radiological Emergency Response Plan (RERP) ML18026A6202018-01-0404 January 2018 Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17332A0402017-11-15015 November 2017 Summary of Changes to Five Procedures and Seven Forms That Implement Radiological Emergency Response Plan ML17137A3962017-05-0909 May 2017 Summary of Changes to a Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17045A4742017-02-0909 February 2017 Revision of a Procedure That Implements the Radiological Emergency Response Plan ML16300A2112016-10-18018 October 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan (RERP) ML16263A3502016-09-13013 September 2016 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan ML16117A2782016-04-14014 April 2016 Revision of Two Procedures and One Form That Implement the Radiological Emergency Response Plan ML16061A0132016-02-25025 February 2016 Revision of Two Forms That Implement the Radiological Emergency Response Plan ML16020A3952016-01-14014 January 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan, Including Revision 3 to Procedure EPP 06-023 and Revision 3 to Form Epf 06-023-01 ML15357A0612015-12-10010 December 2015 Revision 14 to Form That Implements the Radiological Emergency Response Plan (Rerp), Epf 06-018-011, Technical Support Center Inventory Checklist. ML15013A2132015-01-0606 January 2015 Revision 16 to Radiological Emergency Response Plan, AP 06-002 ML0531104872005-10-28028 October 2005 Radiological Emergency Response Plant AP 06-002, Revision 7 ML0407607322004-03-10010 March 2004 Revision 6 to EPP 06-012, Dose Assessment. Corrected Copy ML0410604082004-03-0808 March 2004 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0402202942004-01-14014 January 2004 Revision 4 to EPP 06-11, Emergency Team Formation and Control, and Revision 3 to EPP 06-013, Exposure Control and Personnel Protection. ML0331802382003-11-0505 November 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0328701392003-10-0303 October 2003 Radiological Emergency Response Plan Implementing Procedures and Forms ML0323704602003-08-0808 August 2003 Revised Epips, Including Epf 06-001-07, Rev. 0 and Epf 06-018-03, Rev. 3 ML0319706682003-07-0909 July 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedure & Forms ML0314304642003-05-16016 May 2003 Changes to Wolf Creek Radiological Emergency Response Plan Implementing Procedures and Forms ML0311305242003-04-17017 April 2003 Changes to Wolf Creek Generating Station - Radiological Emergency Response Plan Implementing Procedures & Forms ML0307002152003-03-0404 March 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures & Forms. Includes EPP 06-001, Revision 4, EPP 06-002, Revision 8, EPP 06-003, Revision 6, EPP 06-004, Revision 7, EPP 06-006, Revision 2 ML0302204832003-01-13013 January 2003 Changes to Wolf, Radiological Emergency Response Plan Implementing Procedures WO 02-0062, Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form2002-12-19019 December 2002 Changes to Wolf Creek Radiological Emergency Response Plan, Implementing Procedures and Form WO 02-0055, Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms2002-10-31031 October 2002 Changes to Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan Implementing Procedures and Forms 2023-08-19
[Table view] Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
Text
W8LFCREEK 1 NUCLEAR OPERATING CORPORATION Ron Benham Manager Nuclear and Regulatory Affairs Augu st 29,2019 RA 19-0089 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555 Two Forms that
Subject:
Docket No. 50-482: Revision of One Procedure and Respo nse Plan (RERP ) for Wolf Implement the Radiological Emergency Creek Generating Station (WCGS)
To Whom It May Concern:
RERP have been revised. The revised One procedure and two forms that implement the WCGS documents are identified below:
_Procedure Effective Date EPP 06-012, Rev. 15A August 8, 2019 Form Effective Dates EPF 06-007-02, Rev. OA August 22, 2019.
EPF 06-007-03, Rev. OA August 22, 2019 procedure and the implementing forms The attached summary of the changes to the implementing s of the WCGS RERP. This letter explains that these changes do not reduce the effectivenes rning this matter, please contact me at contains no commitments. If you have any questions conce (620) 364-4204.
Ron Benham RDB/rlt that Implement the
Attachment:
Summary of Changes to One Procedure and Two Forms Wolf Creek Generating Station Radiological Emergency Response Plan (RERP) for (WCGS) cc: S. A. Morris (NRC), w/a N. O'Keefe (NRC), w/a B. K. Singal (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a 1
P.O. Box 411 / Burlington, KS 66839 / Phone: {620) 364-883 An Equal Opportunity Employer M/F/HCN ET
Attachment to RA 19-0089 Page tof 1 Summary of Changes to One Procedure and Two Forms that Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Gene.rating Station (WCGS)
- 1. Procedure EPP 06-012, "Dose Assessment," Rev. 15A The procedure provides guidance for determining release rates and for estimating off-site dose to the Whole Body and Thyroid.
The procedure is being revised to make administrative corrections. Step 7.1.2, changed from "Rev. 5.2" to "Rev 5.3." The electronic version of EDCP has been revised. The current revision number is updated to align with the correct revision.
These changes do not reduce the effectiveness of the Emergency Plan.
- 2. Form EPF 06-007-02, "WCGS Immediate Emergency Notification," Rev. OA The form has been changed to make administrative corrections. Changed primary phone number for State EOC Activated, and Senior Resident phone number.
The change does not reduce the effectiveness of the Emergency Plan ..
- 3. Form EPF 06-007-03, "WCGS Follow-Up Emergency Notification," Rev. OA The form has been changed to make administrative corrections and editorial changes.
Changed primary phone number for State EOC Activated, and Senior Resident phone I I number. .
The change does not reduce the effectiveness cif the Emergency Plan.