Informs That Deletion of Short Duration Data Re Application of Arrehenious Methodology Evaluated & Equipment Found Qualified in Response to NRC 851119-21 Audit of Environ Qualification Program
ML18019A502
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/23/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-85-462, NUDOCS 8512310271
Download: ML18019A502 (6)


Text

O/ REQULATO NFORMATION DISTR I BUT I'ON'TEM (R IDS )

~c ACCESbION NBR: 8512310271 DOC. DATE: 85/12/23 I NOTAR ZED- NO DOCKET FAC IL: 50-400 Shearon Harris Nuclear Power Plant> Unit ii Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CUTTERS A. B. Carolina Po~er h Light Co.

REC IP. NAME RECIPIENT AFFILIATION DENTONp H. R. Office of Nuclear Reactor Regulati one Director (post 851125

SUBJECT:

Inf orms that deletion of. short, duration data re application of Arrehenious methodology evaluated 5 equipment found qualified in response to NRC 851119-21 audit of environ qual i f i cati on program.

DISTRIBUTION CODE: AOAED COPIES RECEIVED: LTR $ ENCL 0 EIIE:

TITLE: t3R/Licensing Submittal: Equipment Gualifxcat ion NOTES:

RECIP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PNR-A PD2 PD 12 BUCKLEY'S B 01..

INTERNAL: ACRS 15 ADM/LFMB ELD/HDS1 12 ELD SHIELDSi M QC 13 NRR BNR ADTS NRR BNR EB NRR KARSCHz R NRR PMR-A ADTS NRR PNR-A EB

-B ADTS NRR PAR-B EB REQ FILES 04 RQN2 EXTERNAL: 24X LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUMBER OF COPIEB REQUIRED: LTTR ~ ENCL

lI%i J~l

Carolina Power 8 Light Company SERIAL: NLS-85-062 OEC 2 3 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO.50-000 ENVIRONMENTALQUALIFICATIONOF ELECTRICAL EQUIPMENT NRC AUDIT

Dear Mr. Denton:

On November 19-21, 1985, your Staff audited the Shearon Harris Environmental Qualification Program. We are very pleased that our efforts to produce a good program have not gone unnoticed by the NRC. Mr. Armando Masciantonio, the lead reviewer, indicated during the exit meeting that he considered our program a good program, that things were in good shape, and that every item they reviewed could be considered qualified. He had two concerns as a result of his review: the application of the Arrehenious methodology, and the need for positive statements in the qualification packages indicating that the equipment is qualified for its application. The purpose of this letter is to address the resolution of these concerns.

Mr. Masciantonio expressed some concerns regarding the application of Arrehenious methodology to extrapolate test data of short duration to show long-term post-accident qualification. Our program had considered short test times (1 to 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />) combined with post-accident test times of longer duration (50 to 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />) to qualify equipment for long-term post-accident operability. We have evaluated the deletion of this short duration data and have found no equipment unqualified.

He also indicated that each qualification package should contain a positive statement indicating that the equipment is qualified for its application. In our judgement, our procedures address this concern since they require the evaluation of plant-specific operability requirements against test results. However, we have no objection to include a positive statement in the packages indicating that the equipment is qualified for its application. This effort is underway and should be completed by 3anuary 15, 1986.

851231 027 1 F'DR BSZPP3 P, ggo CK 05000400

(

PDR 411 Fayetteville Street ~ P. O. Box 1551 o Raleigh. N. C. 27602

~,'Mr. Harold R. Denton

< NLS-85-062/Page 2 We hope that this information is helpful in your 'evaluation of the Shearon Harris Environmental Qualification Program. If you have any questions with regard to this issue, please contact Mr. Pedro Salas at (919) 836-8015.

Yours ery tr

. B. Cutter - Vice Pr ident Nuclear Engineering R Licensing ABC/PS/mf (317 I PSA)

Cco Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. A. Masciantonio (NRC) Mr. 3ohn D. Runkle Mr. G. F. Maxwell (NRC-SHNPP) Dr. Richard D. Wilson Dr. 3. Nelson Grace (NRC-RII) Mr. G. O. Bright (ASLB)

Mr. Travis Payne (KUDZU) Dr. 3. H. Carpenter (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Mr. 3. L. Kelley (ASLB)

Wake County Public Library Mr. H. A. Cole,