ML18093B485

From kanterella
Revision as of 11:21, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Tech Spec 6.9.1.5 Annual Repts of Personnel Receiving Exposures in Excess of 100 Mrem/Yr.Results of Steam Generator Tube Svc Insps Performed During Fourth Refueling Outage in Nov 1988 for Salem Unit 2 Also Encl
ML18093B485
Person / Time
Site: Salem, Hope Creek, 05000000
Issue date: 03/03/1989
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18093B486 List:
References
NLR-N89041, NUDOCS 8903140634
Download: ML18093B485 (2)


Text

Public Service Electric and Gas Company Steven E. Miltenberger P.ublic Service Electric and Gas Company P.O. Box .236, Hancocks Bridge, NJ 08038 609-339-4199_

Vice President and Chief Nuclear Officer MAR O 8 1989 NLR-N89041 United States Nuclear Reguiatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

TECHNICAL SPECIFICATION 6.9.1.5 ANNUAL REPORTS SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311 AND 50-354 Public Service Electric and Gas Company (PSE&G) hereby submits the enclosed Annual Reports for.Salem and Hope Creek Generating Stations, in accordance with Technical Specification 6.9.1.5.a and 6.9.1.5.b of Appendix A to Facility Operating License Nos.

DPR-70, DPR-75, and NPF-57.

Pursuant to Technical Specification 6.9.1.5.a, Enclosures 1, 2 and 3 are submitted for Salem Unit 1, Salem Unit 2, and Hope Creek Unit 1, respectively. These enclosures contain tabulations on an annual basis of the number of station, utility and other personnel receiving exposures greater than 100 mrem/year and their associated man rem exposures according to work and job function for each unit. These tabulations are intended to supplement the requirements of 10CFR20, Section 20.407.

Pursuant to Technical Specification 6.9.1.5.b, Enclosure 4 is submitted for Salem Unit 2. Enclosure 4 documents the results of steam generator tube service inspections performed during the 4th Refueling outage of Salem Unit 2 in November 1988. There were no steam generator tube inspections performed on Unit 1 during 1988, since inspections were performed during the 7th refueling outage in November 1987. This data was submitted in last year's annual report.

The Annual Report of Challenges to Main Steam Line Safety/Relief Valves for the Hope creek Generating Station required by Technical Specification 6.9.1.5.b of Appendix A to Facility Operating License No. NPF-57 was previously provided to the NRC in a PSE&G letter dated February 28, 1989, and is therefore, not included with this submittal. -

...

!'\.. F~' 1)1:..

Document Control Desk 2* MAR 0 8 1989 NLR-N89041 Should you have any questions or comments regarding this submittal, please contact us.

Sincerely, Enclosures (4) c Mr. J. c. Stone Licensing Project Manager - Salem Ms. K. Halvey Gibson Senior Resident Inspector - Salem Mr. c. Y. Shiraki Licensing Project Manager - Hope Creek Mr. G. W. Meyer Senior Resident Inspector - Hope Creek Mr. w. T. Russell, Administrator Region I Ms. J. Moon, Interim Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625