SAFEGUARDS INFORMATION l
g Pubhc Service Electric and Gas Company Stanley LaBruna Pubhc Service Electnc and Gas Company P.O Box 236, Hancocks Booge. NJ 08036 609-339 4500 4
ueues aen uw owaws SEP 0 41990 NLR-N90178 4
United States Nuclear Regulatory Commission-7 Document Control Desk Washington, DC 20555 Gentlemen:
SALEM AND HOPE CREEK GENERATING STATIONS ARTIFICIAL ISLAND SECURITY PIAN TEMPORARY PROTECTED AREA MODIFICATION i
DOCKET NOS. 50-272, 50-311, 50-354 As' described to Mr. Keinig and members of the Safeguards Section staff on August 21, 1990, Public' Service Electric & Gas Company (PSE&G) will construct a new warehouse' facility within the Artificial Island protected area.
To complete this major task with minimal effect upon the Nuclear Security Program, PSE&G is notifying the NRC in accordance with 10 CFR 50.54 (p) of its intent to temporarily modify the protected area to permit-construction outside the protected area.
This arrangement will provide several security benefits and construction program savings.
Security benefits include maintenance.of security measures equivalent to those described in the-Artificial Island Security Plan, reduced personnel, vehicle and material searches and processing, avoidance of construction interferences with lighting and CCTV surveillance,.and very limited compensatory posting and personnel-escorting.
Attachment i depicts'the proposed location of the' warehouse and temporary protected area perimeter relative to the currently approved site configuration. describes the security measures which will be.in force for the duration of the project.
When the project is completed, the protected area will be configured in a new permanent layout, also' depicted in Attachment 1.
A Security Plan revision describing the physical protection features associated with the warehouse and a drawing showing the revised site layout will~be submitted under the provisions of 10 CFR 50.54 (p).
SAFEGUARDS INFORMATION s fgh MIEN SEPARATED PROM ENCLOSURES i
0M C.
IIANDLE Tills. DOCUMENT AS. DECONTROLLED i'i 9oon oo27e 9009o4
,i PDh ADOCK 05o00272 I
l F
l SAFECUARDS INFORMATION Document Control Desk 2
NLR-N90178 SEP o4 tgg0 Thank you for the customary courtesy and constructive comments provided by Mr. Keinig and his staff.
l Sincerely,
&c w Enclosure C
(Without enclosures, except as noted)
Mr. J.
C.
Stone Licensing Project Manager - Scleu.
Mr.
C. Y. Shiraki Licensing Project Manager - Hope Creek Mr. T. Johnson Senior Resident Inspector Mr. T.
Martin, Administrator (w/ enclosures)