ENCLOSURE 3 e
e PUBLIC SERVICE EL EC TRIG AND GAS COMPANY HANCOCK'S BRIDGE, N.J. 08083 PAGE: 1 OF Z DATE: 01/23/89 HOPE CREEK REGULATORY STANDARD FORMAT FOR REPORTING NUMBER OF GUIDE lel6 PERSONNEL ANO. MAN-M~EM BY WORK ANO JOB REPORT FOR FUNCTION YEAR: 1988 NUMBER OF PERSONNEL
( >100 MREM)
TOTAL MAN-MR EM STATION UTILITY CONTRACT STATION UTILITY CONTRACT
- WORK AND JOB FUNCTION EMPLOY-EMPLOY-9'0RKERS EMPLOY-EMPLOY-WORKERS
<PERSONNEL GROUPING)
EES EES
& OTHERS EES EES
& OTHERS REACTOR OPERATIONS AND SURVEILLANCE.
MAINTENANCE 10 0
7 4312 231 5170 OPERATING 31 0
o 10367 0
0 HEALTH PHYSICS 12 0
5 3766 0
2753 CHEMISTRY 10 0
0 2388 0
36 SUPERVISORY 0
1 0
302 229 32 ENGINEERING l
0 l
960 194 215 I&C 6
0 o
3385 0
38 SECURtTY o
0 o
o o
158 ROUTINE MAINTENANCE MAINTENANCE 8
0 1
2040 22 1105 OPERATING o
0 0
375 0
0 HEALTH PHYSICS 1
0 5
1406 0
1520 CHEMISTRY o
0 o
100 0
7 SUPERVISORY o
0 0-o 0
1 ENGINEERING o
0 0
234 7
6 l&C 0
0 o
1397 0
0 SECURITY 0
0 o
0 0
619 INSERVICE INSPECTION MAINTENANCE 0
0 0
155 0
287 OPERATING 0
0 o
78 0
,0 HEALTH PHYSICS 0
0 0
131
.0 0
CHEMISTRY 0
0 o
0 0
9 SUPERVISORY o
0 0
12 0
15 ENGINEERING 0
o o
172 11 3*
I&C o
0 0
41 0
0 SECURITY o
0 0
0 0
0 SPECIAL MAINTENANCE MAINTENANCE 46 0
19 16186 34 9q30 OPERATING 3
0 0
2084 0
0 HEALTH PHYSICS 27 a
12 7264 a
2848 CHEMISTRY 1
0 0
187 0
6 SUPERVISORY 0
1 0
235 129 4
ENGINEERING 2
l 0
1031 252 140 I&C 4
a 1,.
1711 0
374 SECURITY 0
0 0
0 0
0
.:* *~,:.. ' -
.t.**:**::* *! :*
- ~:; i:;:*.-**~ ::. (;.:~:
!:'i:i:,
\\.. *1.U*_,:... *i.
- .. ):.~I C:1,.)!.j.~: -~.:::
r:;.
r-:* :Ci;-:
1?1o 314:-o 7 le
ENCLOSURE 3 e
PUBLIC SERVICE ELECTRIC AND GAS COMP-ANY HANCOCK'S BRIDGEt N.J. 08083 HOPE CREEK STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL ANO MAN-MREM BY WORK ANO JOB FUNCTION WORK ANO JOB FUNCTION (PERSONNEL GROUPING)
WASTE PROCESSING MA I NT ENANCE OPERATING HEALTH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING I&C SEC URI TY REFUELING MAINTENANCE OPERATING HEALTH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING I&C SECURITY TOTAL MAINTENANCE OPERATING HEALTH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING I&C SECURITY NUMBER OF PERSONNEL
<>100 MREMl STATION UTILITY CONTRACT EMPLOY-EMPLOY-WORKERS EES EES
& OTHERS 0
1.
4 0
0 0
0 0
65 19 24 0
3 5
36 0
129 54 68
- 11 3 a 46 0
0 0
0 0
0 o
0 0
9 0
0 0
0 4
0 0
9 0
0 0
2 5"
0 0
0 0
3 0
0 0
0 0
276 1
67 3
2 2
1 0
303 1
92 3
2 3
2 0
PAGE: 2 OF 2 DATE: 01/23/8'9 REGULATORY GUIDE lel6 REPORT FOR YEAR: 1988 TOT AL HAN-MREM STATION UTILITY CONTRACT EMPLOY-EMPLOY-WORKERS EES EES
& OTHERS 151 924 1029 30 3
154 0
o*
18682 5302 7656
- 81 942 1691
- 10396 0
41526 19130 21252 2786 1494 4242 16930 0
o 0
0 0
0 o 0
0 2200 0
0 o
145 2269 0
0 2487 0
0 0
503 2733 0
0 101 0
1693 0
0 0
0 0
117553 821 25801 761 425 616 657 5*
134146 821 34615 819 477 qao 1069 782 GRAND TOTAL:
319 16 406 107360 5723 1737Qq HC Total Man-Mrem 286792 Nuclear Dept. Total by Category 736 36 1135 276240 12675 501301 Nuclear Dept. Final Total Man*Mren1 790 216 PERSONNEL EXPOSURE AND MONITORING REPORT FOR EXPOSURE YEAK:
1988 LICENSEE:
PUBLIC SERVICE ELECTRIC AND GAS COMPANY NRC DOCKET NUM5ER: 50-354 DATE:
01/23/89
ENCLOSURE 4 SALEM UNIT 2 -
STEAM GENERATOR EDDY CURRENT EXAMINATIONS
- Technical Specification 4.4.6.5.b - Steam Generator Tube Eddy Current Inspection.
Examinations were performed to find leaking tubes in Nos. 22 and 24 Steam Generators, Tech. Spec. examinations and anti-vibration bar contact analysis in #22 Steam Generator (North Anna concerns).
Examinations.were conducted by Westinghouse NSS and coordinated by the Salem ISI Group.
Examinations in Nos. 22 and 24 Steam Generator revealed evidence of, tangential cracking in the Row 1 tubes.
An emergency license change was.submitted to the NRC to examine all Row 1 and 2 tubes in all four (4) steam Generators.
In addition, due to industry experience, it was decided to plug all the tubes in Row 1 as well as any Row 2 tubes with indications of tangential cracking.
The License Change became Amendment #63 to Facility ?perating License No. DPR-75.
Two tubes in #24 Steam Generator required the installation of stabilizers as determined from the analysis of previous eddy current data.
The stabilizers were installed to satisfy North Anna concerns.
Both tubes were mechanically plugged after the installation of the stabilizers.
RESULTS OF THE EXAMINATIONS ARE AS FOLLOWS:
.22 23 Extent of Exam.
"U" Bend *
( 1)
Full Length (2)
"U" Bend (3)
"U" Bend (1)
"U" Bend
( 4)
"U" Bend (1)
No. of Tubes Inspected 178 272 108 76 449 178 Tubes with Indications (3)
<20%
20-39%
>40%
0 2
0 0
0 0
0 1
0
- o 0
0 0
0 46 (5) 0 0
0 24 Sub-Total Full Length (2)
"U" Bend
( 3)
"U" Bend (1)
Full Length (2)
"U" Bend
( 1&3)
"U" Bend (4) 73 131 47 345 698 469 4
0 0
6 0
0 8
0 0
9 0
0 0
46 (5) 0 0
92 (5) 0 Total 1512 6
9 92 (5)
NLR-N89041
(1)
Baiance of Row 1 and Row 2 tubes to satisfy Amendment #63 to operating license.
(2)
From tube sheet, cold leg side, to tube sheet, hot leg side.
(3)
Tech. Spec. sample from seventh support plate, cold leg side to sixth support plate, hot leg side ("U" Bend Region).
(4)
Anti-vibration bar analysis tubes (North Anna concerns).
(5)
Row 1 tubes which showed possible indications of tangential cracking.
CURRENT STATUS OF THE S'!'EAM GENERATORS At this time the total number of tubes plugged in the Salem Unit 2 Steam Generators are as follows:
Generator f 21 22 23 24 Tubes Plugged 94 96 96 100 NOTE:
NLR-N89041 In the Steam Generator's 21-24, the first five (5) and the last five (5) tubes in row 1 were mechanically plugged because of a generic wearing problem on the tubes, due to the vibration 9f the tube lane blocking device.