Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20196J4421999-07-0101 July 1999 Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196F9441999-06-21021 June 1999 Forwards Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Two Violations of NRC Requirements Occurred Re Reactor Bldg Ventilation Setpoints & Control Rod Drop Analyses ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209C0621999-06-21021 June 1999 Forwards NPDES Discharge Monitoring Rept,May 1999, for Hcgs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML20195J1101999-06-0707 June 1999 Informs of Completion of Review of Providing Updated Status on Implementation of Commitments Made in Response to GL 89-13.Confirms Revs Made to Previous Commitments to Resolve Monitoring Pressure Drop Problem ML20195J1051999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Jw Clifford Will Be Section Chief for Hope Creek Generating Station ML20207F2681999-06-0303 June 1999 Responds to by Forwarding Gfes & NRC Written Exam Grades for List of Hope Creek Operators Submitted by DE Jackson.Absence of Gfes Grade Indicates That Operator Previously Issued RO or SRO License.Without Encl ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML20207D0201999-05-27027 May 1999 Discusses 990512 Meeting to Identify Insp Activities at Hope Creek Facility Over Next Six Months & Informs of Planned Insps in Order for Licensee to Have Opportunity to Prepare & Provide Region I with Feedback on Schedule Conflicts ML20195B9931999-05-20020 May 1999 Forwards NPDES Discharge Monitoring Rept,Apr 1999, for Hgcs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20207A3451999-05-20020 May 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20206Q6211999-05-14014 May 1999 Informs That on 990119 Licensee Provided NRC with Several Revised TS Bases Pages for Plant.Ts Bases Pages B 3/4 6-1 & B 3/4 6-2 Were Revised 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML20206P1931999-05-10010 May 1999 Provides Updated Status of Plant Implementation of Commitments to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment, Issued by NRC on 890718.Revised Commitments to Subject Gl,Listed 05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a1999-05-0404 May 1999 Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML20206D3301999-04-27027 April 1999 Submits Completion of Requested Actions for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept 05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl1999-04-0808 April 1999 Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek ML18106B1411999-03-30030 March 1999 Forwards Decommissioning Info on Behalf of Conectiv Nuclear Facility License Subsidiaries,Atlantic City Electric Co & Delmarva Power & Light Co,For Listed Nuclear Facilities 05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made1999-03-26026 March 1999 Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made LR-N990111, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records1999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records LR-N990131, Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities1999-03-22022 March 1999 Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 19971999-03-22022 March 1999 Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 LR-N990133, Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 1011999-03-22022 March 1999 Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 ML18106B1071999-03-22022 March 1999 Forwards Annual Rept on Results of Individual Monitoring for Salem & Hope Creek Generating Stations,Iaw 10CFR20.2206.Info Provided on Encl Floppy Disk.Without Disk ML20206J4021999-03-10010 March 1999 Responds to NRC Oversight of Nuclear Plants Response to Y2K Bug.Consideration of More Aggressive Action to Forestall Any Y2K Problems,Requested LR-N990112, Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve1999-03-0505 March 1999 Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve ML18106B0861999-03-0101 March 1999 Forwards Annual Repts for Salem & Hope Creek Generating Stations,Containing Data on Number of Station,Utility & Other Personnel Receiving Exposures Greater than 100 Mrem/ Year & Collective Exposures According to Work & Job 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H5391990-09-10010 September 1990 Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991 ML20059E6791990-09-0404 September 1990 Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21) ML20059E6821990-09-0404 September 1990 Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld ML20059D2531990-08-30030 August 1990 Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station ML20059E7021990-08-30030 August 1990 Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM ML18095A4391990-08-29029 August 1990 Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances ML20059D2191990-08-27027 August 1990 Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY ML20059C3051990-08-24024 August 1990 Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3 ML20059D2491990-08-24024 August 1990 Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies ML18095A3861990-07-30030 July 1990 Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML18095A3611990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML20055G1571990-07-17017 July 1990 Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program ML18095A3591990-07-13013 July 1990 Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items ML20055G4721990-07-11011 July 1990 Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion ML20055E5181990-07-0303 July 1990 Suppls Request for Noncode Temporary Repair of Svc Water Sys.Ultrasonic Exam of Area Surrounding Patch Will Include Samples,In Accessible Areas,Out to Diameter of 14 Inches ML18095A3301990-07-0202 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl ML18095A3231990-06-28028 June 1990 Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits ML18095A3211990-06-26026 June 1990 Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout ML20055D0351990-06-26026 June 1990 Forwards Addl Info Re Svc Water Sys Noncode Temporary Repair,Per 900621 Application.Util Will Perform Ultrasonic Testing of Pipe Wall Adjacent to Fillet Weld Repair & on Patch.Insps Will Be Performed at 90-day Intervals ML20044A6251990-06-21021 June 1990 Requests Approval of Temporary Noncode Repair of ASME Code Class III Piping Flaw.Flaw Located in 30-inch Diameter Moderate Energy Svc Water Line.Svc Water Sys Will Be Evaluated for Other Flaws,Per Generic Ltr 90-05 ML20043F3301990-05-31031 May 1990 Advises That Contrary to 891223 Commitment,Testing Procedures to Demonstrate Full Safety Function Flow for Certain Check Valves Have Not Been Revised.Failure to Comply to Commitment Due to Administrative Error ML20043B3631990-05-22022 May 1990 Forwards Revised Response to Request for Addl Info Re Bailey Solid State Logic Module (Sslm) Reliability for 1988 & 1989. Criteria Used to Monitor & Trend Bailey Model 862 Sslm Failure Rates Described in 900419 Ltr Modified ML20043B7231990-05-21021 May 1990 Forwards Revised Page 8 to Semiannual Radioactive Effluent Release Rept Forwarded on 900228.LER Being Prepared to Provide Details Re Liquid Radioactive Effluent Release Monitor Out of Svc for Greater than 30 Days ML18095A2261990-05-16016 May 1990 Forwards 1989 Annual Financial Repts of Pse&G,Atlantic City Electric Co,Delmarva Power & Light Co & Philadelphia Electric Co ML20043A1221990-05-14014 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 Rept for Hope Creek Generating Station,Unit 1 ML20042G6521990-05-10010 May 1990 Forwards Attachment 1,Plan Figure 4i for Incorporation Into Security Plan,Per 900212 Commitment.Encl Withheld (Ref 10CFR73.21) ML20042F9131990-05-0404 May 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Overfill Protection for Steam Generators in PWRs & Reactor Vessels in Bwrs.Operability of Overfill Protection Sys Assured by Performing Channel Checks Every 12 H ML18094B4451990-04-30030 April 1990 Responds to 900404 Request Re Station Blackout.Licensee Presently Reconstituting Station Blackout Project Team in Order to Fully Assess Third Party Audit Findings & Establish Scope & Schedule for Rework Activities ML20042F1271990-04-30030 April 1990 Advises of Change to Licensing Basis Commitment Re High/Low Pressure Interface Valves,Per 10CFR50.59.Util Intends to Restore Electric Power to Solenoid Operated Pilot Valves Associated W/High/Low Pressure Interfacing Sys ML20042F1311990-04-27027 April 1990 Provides Required Certification for Rev 2 to Updated FSAR for Hope Creek Generating Station.Through Administrative Oversight,Std Affidavit Transmitted in Lieu of Required Certification ML18094B4271990-04-17017 April 1990 Forwards Policy Statement on fitness-for-duty,in Response to Insp Repts 50-272/90-10,30-311/90-10 & 50-354/90-07.Policy Statement Will Be Disseminated to All Site Personnel as Attachment to Paychecks & Included as Part of Bid Spec ML18094B4071990-04-0909 April 1990 Forwards Corrected Pages to Rept Entitled, Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemp'S Ridley & Loggerhead Sea Turtles. Addl Mitigating Measures Will Be Incorporated to Minimize Effects on Turtle Species ML18094B3881990-04-0404 April 1990 Forwards Annual Rept for 1989 & Summary of Owners 1990 Projected Internal Cash Flow Statements ML18094B4051990-03-20020 March 1990 Provides List of Sources & Amounts of Financial Protection Carried on Plants,Per 10CFR50.54(w) ML18094B3641990-03-20020 March 1990 Responds to Generic Ltr 89-19 Re Overfill Protection for Steam Generators in PWRs & Reactors in Bwrs.Overfill Protection Sys Sufficiently Separate from Control Sys & Not Powered from Same Power Source ML20012D1361990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Violations Noted in Insp Rept 50-354/89-80.Corrective Actions:Periodic Mgt Evaluation of Procedure Writing Effort Will Be Conducted to Ensure That No Recurrence of Backlog Problems Occur ML20012B6391990-03-0808 March 1990 Provides Addl Info in Response to Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls,Including Comparison of Irradiation Embrittlement Predictions of Reg Guide 1.99,Revs 1 & 2 for Plant ML18094B3221990-02-28028 February 1990 Forwards Executed Amend 14 to Indemnity Agreement B-74 ML20006F3831990-02-16016 February 1990 Forwards 1989 Inservice Exam of Selected Class 1 & Class 2 Piping & Components at Hope Creek Generating Station & Sept/Oct 1989 Inservice Exam of Selected Class 1 & Class 2 Components at Hope Creek Generating Station. ML20011E6151990-02-12012 February 1990 Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21) ML18094B2861990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 Issuance ML20006B8721990-01-26026 January 1990 Forwards Progress Rept on Project to Upgrade Nuclear Site Physical Security Features.Encl Withheld (Ref 10CFR73.21) ML20006A8001990-01-19019 January 1990 Forwards Response to NRC 891220 Ltr Re Violations Noted in Plant Insps.Response Withheld (Ref 10CFR73.21) ML19354E7961990-01-19019 January 1990 Responds to NRC Bulletin 89-002 Re Anchor Darling Model S350W Swing Check Valves W/Type 410 Stainless Steel Internal Bolting.No Subj Anchor Darling Valves Installed at Facility. Valves of Similar Design Installed at Facility ML18094B2331990-01-0303 January 1990 Certifies Util Implementation of fitness-for-duty Program, Per 10CFR26.Training Element Required by Rule Completed on 891215.Chemical Testing for Required Substances Performed at Min Prescribed cut-off Levels,Except for Marijuana ML18094B2201989-12-27027 December 1989 Advises of Intent to Provide follow-up Response to Generic Ltr 89-10 by 900831 to Describe Status of Program, Recommendation Exceptions & Any Schedule Adjustments ML18094B2291989-12-27027 December 1989 Requests to Apply ASME Section XI Code Case N-460 to Facilities Re Reduction in Exam Coverage on Class 1 & 2 Welds.Fee Paid ML19332F3601989-12-0707 December 1989 Provides Clarification on Status of Rev 9 to Facility Odcm. Rev 10 Superceeds Rev 9 to ODCM Per 890320 Approval 1990-09-04
[Table view] |
Text
_
e Pubhc Service Electric and Gas -
Company St:nley LaBruna Public Service Electric and Gas Compar.y P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 VCe PrWtjent . P4dC8edr Ogergporis August 24, 1990 NLR-N90174 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen: ,
i REQUEST FOR REGIONAL WAIVER OF COMPLIANCE TECHNICAL SPECIFICATIONS 4.8.1.1.2.f.2 AND 4.0.3 FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) hereby requests Regional Waiver of Compliance from the provisions of Technical Specification 4.8.1.1.2.f.2 AND 4.0.3. As discussed in Attachment 1 to this letter, PSE&G's conclusion is that granting this request would involve neither a significant hazards consideration nor any irreversible environmental consequences.
This reliof is requested to allow sufficient time to perform '
Surveillance Requirement 4.8.1.1.2.f.2 without requiring unit-shutdown. The surveillance test requires that the impurity level of diesel fuel oil samples meet the criteria of ASTM-D2274-70.
At 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on August 23, 1990, PSE&G personnel determined that ,
this surveillance had not been properly performed for fuel oil samples.
The requested duration of this waiver is from approval prior to' 1630_ hours on August 24, 1990 until 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, on August 26, 1990. Regional Waiver of Compliance is being requested because Technical Specifications 4.8.1.1.2.f.2, 4.0.3 and 3.0.3 would require actions to initiate unit shutdown by 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on August 24,-1990. PSE&G therefore requests expeditious review of this submittal.
1 l
l 9009060177 900824 l POR ADOCK 05000354 !
p PDC Rool
'I t
\
1 Document Control Desk 8/24/90 NLR-N90174 1
This request has been reviewed and recommended for approval by the Hope Creek Generating Station Station Operations Review Committee. l Sincerely, Attachment C Mr. C. Y. Shiraki Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. W. T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 l
l
i
NLR-N90174 ATTACHMENT 1 TECHNICAL SPECIFICATIONS 3/4.8.1.1, 4.0.3 AND 3.0.3 Hope Creek Technical Specification 3/4.8.1.1 requires that four i separate and independent diesel generators be Operable in -1 Operational Conditions 1, 2 and 3. Surveillance Requirement 4.8.1.1.2.f.2 requires that, within one week of obtaining a a diesel fuel oil sample, an impurity level of less than 2 mg of l insoluble per 100 m1, when tested in accordance with ASTM-D2274-70, be verified. Fuel oil samples are required to be taken at least once per 92 days and upon receipt of new fuel.
Technical Specification 4.0.3-states that " Failure to perform a l Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. The time limits of the ACTION requirements are applicable at the time it is identified that the
, Surveillance Requirement has not been performed. .The ACTION requirements may be delayed up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time-limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />..."
Technical Specification 3.0.3 requires that "When a Limiting-Condition for Operation is not met, except as provided in the associated ACTION requirements, within one hour action shall be initiated to place the unit in an OPERATIONAL CONDITION in which the specification does not apply ..."
SUMMARY
OF CURRENT SITUATION On August 23, 1990, Hope Creek Generating Station (HCGS) personnel received test results from a vendor who had performed an analysis of new diesel-fuel oil samples. PSE&G contacted the vendor to discuss the test results of a particular sample which apparently did not mect the test criteria. The ensuing discussions led the PSE&G personnel to discover that the testing did not meet the criteria of ASTM-D2274-70,. but.were, in fact, performed to ASTM D2276. Therefore, Surveillance Requirement 4.8.1.1.2.f.2 had not been performed. Additionally, since it
, appears that the testing laboratory has tested previous fuel oil l samples incorrectly with regard to meeting the criteria of the i
subject ASTM standard, the OPERABILITY of all emergency diesel fuel storage, hence all four Emergency Diesel Generators (EDGs),
is in question. Consequently, the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provision of Technical Specification 4.0.3 was placed into effect upon discovery of the improperly performed surveillance (i.e, at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on August 23, 1990).
Due to the specific testing requirements, particularly a 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> sample aging step, the number of samples to be tested, and the limitations of individual laboratories to perform multiple tests in parallel, the ASTM-D2274-70 test cannot be performed for all of the EDG fuel storage tanks within the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed by Specification 4.0.3. Technical Specification 4.8.1.1.2.fi2 normally allows one week from the time the sample is taken until completion of the test.
Therefore, unless the requested waiver is granted, the failure to i properly perform Surveillance Requirement 4. 8.1.1. 2. f. 2 will result in entry to Technical Specification 3.0.3 as a result of declaring all four Emergency Diesel Generators inoperable.
This situation could not be reasonably avoided because PSE&G had no reason to question the laboratory testing results wherein the discovery would have been made that the lab was not doing the correct testing specified by PSE&G, and because the provisions of Specification 4.0.3 became effective immediately upon discovery of the incorrect performance of the surveillance, not allowing sufficient time to successfully complete the tests.
REQUEST FOR REGIONAL WAIVER OF COMPLIANCE PSE&G hereby requests a waiver of compliance for the requirements of Hope Creek Generating Station Technical Specifications 4.8.1.1.2.f.2 and 4.0.3. Specifically, it is requested that the allowable time period to perform the required surveillances be extended an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> on a one-time-only basis.
COMPENSATORY MEASURES Lacking ASTM D2276 test results for "D" EDG, it will be declared administratively INOPERABLE until test results are received that permit us to reverse that decision.
JUSTIFICATION FOR THE PROPOSED WAIVER OF COMPLIANCE dystification for Proposed Time Duration of the Recuest The time necessary for completion of the required ASTM testing is greater than the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> permitted by Technical Specifications.
An additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> will be sufficient time to complete the testing for all affected fuel storage tanks. The normal interval permitted for the subject ASTM testing is one week after a sample is obtained. The required oil samples have been taken and distributed to two laboratories for ASTM D2274 analysis to expedite receipt of the results. The first testing results have returned for one of two "A" EDG Storage Tanks well within the Technical Specification limit. Additionally, testing in
l t
accordance with ASTM D2276 has been perfomed on all tanks. Due to the delays associated with the ASTM D2274 testing, the results from the ASTM D2276 testing for each tank have been correlated against the ASTM D2274 data received on the "A" EDG tank to project ASTM D2274 results for the remaining tanks. The results of this correlation of test results projects that the ASTM D2274 tests for the A, B, and C EDGs will satisfy the Technical Specification limit. Lacking even ASTM D2276 test results for the two "D" EDG Storage Tanks, we have decided to declare that EDG administratively INOPERABLE until test results can be obtained to reverse that decision. The results for the remaining diesel generators, in conjunction with satisfactory " clear and bright" tests for all tanks which were performed on August 23, >
1990, provide a level of confidence that the ongoing ASTM D2274-70 tests will demonstrate that Emergency Diesel Generator fuel oil meets the acceptance standards of the Technical Specifications.
As described in the following sections, there is no significant hazard to the public nor are there any irreversible environmental consequences introduced by granting the requested time extension for comp]etion of the required testing. Absent the requested relief, a plant shutdown will be required.
Determination of No Sionificant Hazards Consideration This proposed Waiver of Compliance:
- 1) Does not involve a significant increase in the probability or consequences of any accident previously evaluated.
All four Emergency Diesel Generators have been demonstrated OPERABLE by recent and currc 7t successful completion of all other surveillance testing. With the exception of the specific incorrectly performed ASTM test, the fuel oil has been tested to, and satisfied, all other ASTM criteria required by the Technical Specifications.
Hope Creek has sent oil samples out to have the proper testing performed and the results from the first sample have returned with a value of .4858 mg per 100 ml...a factor of 5 beJow the Technical Specification (TS) limit. Fuel oil used at HCGS is all purchased from the same supplier...providing a level of confidence that the remaining samples will also be satisfactory.
The EDGs have duplex filters and duplex strainers on the fuel oil supply lines which will prevent fuel oil contaminants from degrading the injector nozzles. The strainers and filters are instrumented and alarm on high d/p in sufficient time to permit manual transfer. Therefore, the diesels can be reasonably expected to remain operable even with fuel oil contamination.
(
l The above all provide reasonable assurance that the EDGs will remain capable of performing their intended function when called 1 upon. There are no other pla.nt components directly affected by I the quality of the fuel oil. Therefore, permitting an additional 1 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in which to complete the required ASTM testing will I cause no significant increase in the probability or consequences i of any accident or malfunction of equipment important to safety )
previously evaluated.
- 2) Does not create the possibility of a new or different kind of accident from any accident previously evaluated.
An additional 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> delay in completing the ASTM testing that was improperly performed will not create any new or different kind of accident.
- 3) Does not involve a significant reduction in a margin of safety.
The type and quantity of testing performed, the results of the first samples tested to the proper ASTM standard, the correlation of test data and the design of the fuel delivery system provide reasonable assurance that the EDGs will remain capable of performing their intended function. Thus, permitting an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> in which to complete the prescribed ASTM testing will cause no significant reduction in the margins of safety associated with the operability of the EDGs as discussed in the bases for the Technical Specifications.
Determination that the Reauest does not Involve Irreversible Environmental Consecuences l
The requested waiver does not allow for any increase in effluents that may be released offsite, does not involve an increase in radiation exposure to personnel, and does not involve a l Determination of No Significant Hazards Consideration.
Therefore, the request does not involve any irreversible environmental consequences.