ML19211A651

From kanterella
Revision as of 11:24, 5 September 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1979
ML19211A651
Person / Time
Site: Pilgrim
Issue date: 12/01/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19211A652 List:
References
79-263, NUDOCS 7912200372
Download: ML19211A651 (1)


Text

-.,."" Edison u ~

3't G R n1 V:":LE s

.0 c ' E = 3

-m 'im cy ',..

r_.a a m ,2 =- -

.December 1, 1979 BECo Ltr. #79-263 Director Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Docket No . 50-293 License DPR-35

Subject:

November, 1979 Monthly Report De.1r Sir:

.In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclea-Power Station is attached for your information and planning.

Respectfully submitted, j s.h~f P. J. McGuire Station Manager Nuclear Operations CMG:ep cc: Director (1 copy)

Office of Inspection and Enforcement Office of Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Director of Region I (1 copy)

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 1634 020 A0 8 5 79122 00 3'7A