|
---|
Category:Inspection Report
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) IR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 IR 05000461/20234202023-08-29029 August 2023 – Security Baseline Inspection Report 05000461/2023420 IR 05000461/20230052023-08-25025 August 2023 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2023005) IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 IR 05000461/20224032022-11-28028 November 2022 Material Control and Accounting Program Inspection Report 05000461/2022403 (Public) IR 05000461/20220032022-11-10010 November 2022 Integrated Inspection Report 05000461/2022003 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20220022022-07-27027 July 2022 Integrated Inspection Report 05000461/2022002 IR 05000461/20220102022-06-0606 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010 IR 05000461/20224012022-05-24024 May 2022 Security Baseline Inspection Report 05000461/2022401 IR 05000461/20220012022-04-28028 April 2022 Integrated Inspection Report 05000461/2022001 IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) IR 05000461/20210042022-02-0404 February 2022 Integrated Inspection Report 05000461/2021004 IR 05000461/20215012022-01-0303 January 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2021501 IR 05000461/20210032021-10-29029 October 2021 Integrated Inspection Report 05000461/2021003 IR 05000461/20210132021-09-0303 September 2021 Temporary Instruction Report 05000461/2021013 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 IR 05000461/20214022021-08-23023 August 2021 Security Baseline Inspection Report 05000461/2021402 IR 05000461/20210112021-08-20020 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000461/2021011 IR 05000461/20210022021-08-0909 August 2021 Integrated Inspection Report 05000461/2021002 IR 05000461/20214402021-07-15015 July 2021 Supplemental Inspection Report 05000461/2021440 and Assessment Follow Up Letter (Cover Letter Only) IR 05000461/20210122021-06-28028 June 2021 Biennial Problem Identification and Resolution Inspection Report 05000461/2021012 IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 IR 05000461/20214012021-04-29029 April 2021 Security Baseline Inspection Report 05000461/2021401 (Cover Letter Only) IR 05000461/20210012021-04-26026 April 2021 Integrated Inspection Report 05000461/2021001 IR 05000461/20210102021-03-18018 March 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000461/2021010 IR 05000461/20200102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000461/2020010 IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) IR 05000461/20200042021-02-0909 February 2021 Integrated Inspection Report 05000461/2020004; 07201046/2020001 2024-09-09
[Table view] Category:Letter
MONTHYEARIR 05000461/20240032024-11-0505 November 2024 Integrated Inspection Report 05000461/2024003 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter 2024-09-09
[Table view] |
Text
June 20, 2019 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: CLINTON POWER STATION, UNIT 1-NRC SECURITY BASELINE INSPECTION REPORT 05000461/2019410
Dear Mr. Hanson:
On May 17 , 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Clinton Power Station, Unit 1 , and the NRC inspectors discussed the results of this inspection with Mr. E. Brooks and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspector s did not identify any findings or violations of more-than-minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
The enclosed report contains Security-Related Information and will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. B. Hansen -2 The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/ Thomas C. Hartman, Acting Branch Chief Plant Support Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Enclosure:
Inspection Report
05000461/2019410 cc: W. Marsh, Clinton Station Security Manager A. Khayyat, State Liaison Officer Illinois Emergency Management Agency cc w/o encl:
Distribution via LISTSERV
ML19171A425 x SUNSI Review x Non-Sensitive Sensitive x Publicly Available Non-Publicly Available OFFICE RIII RIII RIII NAME JKutlesa:jw MZiolkowski THartman DATE 06/19/19 06/20/19 06/20/19