Integrated Inspection Report 05000461/2024003
ML24309A257
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/05/2024
From: Nestor Feliz-Adorno
NRC/RGN-III/DORS/RPB1
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024003
Download: ML24309A257 (1)


Text

SUBJECT:

CLINTON POWER STATION - INTEGRATED INSPECTION REPORT 05000461/2024003

Dear David Rhoades:

On September 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station. On October 17, 2024, the NRC inspectors discussed the results of this inspection with Greg Englehardt, Director of Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Néstor J. Féliz Adorno, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety Docket No. 05000461 License No. NPF-62

Enclosure:

As stated

Inspection Report

Docket Number:

05000461 License Number:

NPF-62 Report Number:

05000461/2024003 Enterprise Identifier:

I-2024-003-0056 Licensee:

Constellation Nuclear Facility:

Clinton Power Station Location:

Clinton, IL Inspection Dates:

July 01, 2024, to September 30, 2024 Inspectors:

J. Cassidy, Senior Health Physicist L. Criscione, Operations Engineer T. Hooker, Health Physicist T. Iskierka-Boggs, Senior Operations Engineer A. Muneeruddin, Resident Inspector J. Nance, Operations Engineer J. Robb, Operations Engineer J. Steward, Senior Resident Inspector Approved By:

Néstor J. Féliz Adorno, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power (RTP). On September 7, 2024, power was reduced to 75 percent RTP to perform a planned control rod sequence exchange. On September 8, 2024, the unit was restored to RTP. On September 15, 2024, the unit was derated to 94.5 percent RTP to reduce circulating water thermal discharge temperature to comply with the State of Illinois Environmental Discharge Permit requirement not to exceed 90 days with circulating water discharge temperature in excess of 99 degrees F. The unit remained derated at approximately 93 percent RTP until September 24, 2024, when the unit was returned to RTP.

The unit continued to operate at RTP for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)containment combustible gas control system July 10-11, 2024 (2)service air train 0 August 6-7, 2024 (3)division 1 diesel generator on September 19, 2024

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the control rod drive system on August 8, 2024.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Areas T-1(a), T-1(b), and T-1(c); turbine building; elevation 709'-712'; turbine building basement; condensate pump and booster pump areas on July 2, 2024
(2) Fire Areas T-1(m) and T-1(n), turbine building, elevation 800'-805', turbine deck and hydrogen analyzer room on July 9, 2024
(3) Fire Areas A-2(n) and A-3(f), auxiliary building, elevation 781', division 1 and division 2 switchgear areas on July 10, 2024
(4) Fire Area R-1(q), radwaste building, elevation 762', service air compressor room and surrounding tank areas on July 23, 2024
(5) Fire Areas T-1(h) and T-1(i), turbine building, elevation 762'-769', turbine auxiliary areas and turbine lube oil reservoir room on August 9, 2024
(6) Fire Area CB-1e, control building heating, ventilation, and air conditioning mezzanine, elevation 751' on September 4, 2024

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on September 20, 2024.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during a planned downpower to 75 percent rated thermal power for rod sequence exchange on September 7, 2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator requalification simulator training on August 13, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)failure of service air compressor 0 per Action Request (AR) 4704289 on August 5, 2024

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)elevated risk due to erratic temperature readings on two of four divisional main steam line turbine building temperature instruments per ARs 4792133 and 4792147 on August 7, 2024 (2)elevated online risk due to a planned maintenance window for division 3 battery charger alarm card replacement on August 19, 2024 (3)elevated online risk due to a planned maintenance window for division 3 shutdown service water pump August 20-21, 2024 (4)risk informed completion time evaluation for Technical Specification (TS) 3.6.1.3 associated with inoperable primary containment isolation valve, 1WX020, on August 29, 2024 (5)elevated online risk due to a planned maintenance window for the high-pressure core spray system on September 4, 2024 (6)elevated online risk due to a planned maintenance window for division 1 diesel generator and shutdown service water pump on September 12, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1)division 2 essential switchgear heat removal condensing unit, 1VX06CB, trip on low differential oil pressure per AR 4785193 on July 12, 2024 (2)shutdown service water leakage past 1CC075A/1CC076A, fuel pool heat exchanger 1A component cooling water inlet and outlet valves per AR 4785273 on July 19, 2024 (3)division 1 and 2 main steam line turbine building temperature instruments declared inoperable due to suspect readings per ARs 4792133 and 4792147 on August 13, 2024 (4)division 1 direct current (DC) bus 1A voltage low per AR 4797469 on August 28, 2024 (5)division 1 reactor water cleanup backwash outboard isolation valve, 1WX020 closing stroke time exceeded limiting value per AR 4796050 on August 29, 2024

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1)temporary modification to install deflector shield over turbine building main steam line temperature sensors, 1E31-N559A/B, on August 16, 2024

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (7 Samples)

(1)diesel driven fire pump B functionality test following a planned maintenance window per Work Order (WO) 5290874 on July 8, 2024 (2)division 1 diesel generator starting air compressor PMT following replacement per WO 5415463 on August 23, 2024 (3)service air dryer 0 PMT following a planned maintenance window per WO 5552917 on August 28, 2024 (4)division 3 shutdown service water operability test per WO 5539476-06 on August 28, 2024 (5)suppression pool cleanup and transfer pump A PMT following pump and recirculation valve rebuild per WOs 5481696 and 5533634 on September 10, 2024 (6)division 1 diesel generator PMT on the fuel oil, lube oil, starting air, jacket water, generator control systems including protective relaying following 2-year maintenance and inspections per WOs 5348733, 5275362, 5349424, 5356038, 4788469, 1823820, and 5244213 on September 19, 2024 (7)division 1 DC charger PMT per WO 4837557-02 on September 27, 2024

Surveillance Testing (IP Section 03.01) (3 Samples)

(1)diesel driven fire pump A operability test following maintenance per Clinton Power Station (CPS) 9071.01A on July 24, 2024 (2)division 3 shutdown service water (SX) pump baseline testing following maintenance to replace pump shaft per WO 5539476 on August 27, 2024 (3)standby liquid control pump A and valve operability per CPS 9015.01 on September 13,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (8 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1)liquid scintillation counters in the chemistry laboratory (2)gamma spectroscopy detectors in the chemistry laboratory (3)area radiation monitors (ARMs) in auxiliary building (4)portable ion chambers stored ready for use (5)portable Geiger-Mueller instruments stored ready for use (6)personnel contamination monitors at the primary exit point from the radiologically controlled area (7)portal monitors at main access building exit (8)portable continuous air monitor stored ready for use

Calibration and Testing Program (IP Section 03.02) (11 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Ludlum Model 177 Asset Number 0023376
(2) Ludlum Model 3 Asset Number 0011958
(3) Eberline RO-20 Asset Number 078126
(4) Ludlum 3030P Asset Number 0027983
(5) MGP Telepole Asset Number 0797731
(6) MGP AMP-100 Asset Number 079119
(7) MGP RAM GAM 1 Asset Number 079489
(8) Eberline AMS-4 Asset Number 076670
(9) Canberra FASTSCAN Serial Number W BODY
(10) Canberra Gamma Spectroscopy Detector E
(11) PerkinElmer Tri-Carb 3110TR Serial Number 107310 Effluent Monitoring Calibration and Testing Program Sample (IP Section 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1)plant service water effluent radiation monitor, 1RIX-PR036 (2)standby gas treatment radiation monitor, 0RIX-PR003

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (4 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1)service water liquid radiation monitor (2)off-gas pre-treatment radiation monitor (3)heating, ventilating, and air conditioning vent stack effluent radiation monitor (4)standby gas treatment system vent effluent radiation monitor

Sampling and Analysis (IP Section 03.02) (4 Samples)

Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:

(1)off-gas pre-treatment sample (2)heating, ventilating, and air conditioning noble gas and tritium sample (3)heating, ventilating, and air conditioning iodine and particulates sample (4)standby gas treatment system iodine and particulates sample

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1)heating, ventilating, and air conditioning stack gaseous release; 230-210-G (2)standby gas treatment system stack gaseous release; 230-215-G

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) July 1, 2023, through June 30, 2024

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) July 1, 2023, through June 30, 2024

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) July 1, 2023, through June 30, 2024 BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
(1) July 1, 2023, through June 30, 2024
(2) August 2, 2023, through July 24, 2024

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) August 10, 2023, through July 10, 2024 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
(1) August 10, 2023, through July 10, 2024

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors conducted a semiannual review of the licensees corrective action program for potential adverse trends that might be indicative of a more significant safety concern during the months of June through September of 2024. A specific trend related to service air system performance issues is documented in the Results section of this report.

INSPECTION RESULTS

Observation: Service Air System Performance Issues 71152S The inspectors performed a review of plant issues, particularly those entered into the licensees corrective action program (CAP) over the past several months. During their review, the inspectors noted that the licensee continues to experience performance issues involving the stations service air systems. Specific CAP entries reviewed by the inspectors included, but were not limited to:

- AR 4778116, Service Air Header Pressure Drop, on June 2, 2024

- AR 4782961, EOID: Suspect Air Leak Past Check Valve 2SA655, 2 SA Dryer, on June 25, 2024

- AR 4782968: EOID: Air Leak on Fitting of 2 SA Dryer Solenoid F, on June 25, 2024

- AR 4782975, EOID: Air Leak From Pipe Union Below 2SA656, #2 SA Dryer, on June 25, 2024

- AR 4783043, Service Air Header Pressure Drop Again, on June 25, 2024

- AR 4783974, 1SA01D Service Air Dryer Degraded, on June 29, 2024

- AR 4783977, 2SA01D Service Air Dryer Degraded, on June 29, 2024

- AR 4788182, Unexpected Alarm 5009-3H PPC Alarm Low SA Header Pressure, on July 19, 2024

- AR 4801176, Service Air Header Pressure Drop, on September 12, 2024

- AR 4801875, Sudden Drops in Service Air Header Pressure, on September 15, 2024 The service air system is the source of air for the instrument air system. The service air and instrument air systems perform no nuclear safety-related function, with the exception of the automatic depressurization system backup air supply function and the containment/drywell isolation function. These functions have a high safety significance and are classified as such in the sites maintenance rule program. Only specific portions of the compressed air system are designed to the requirements of American Society of Mechanical Engineers (ASME),

Section III. Failure to maintain service air header pressures could lead to loss of instrument air and ultimately to a plant SCRAM due to SCRAM valves failing open and closure of main steam isolation valves.

The inspectors reviewed numerous ARs documenting issues with the service air system over the past few months and the potential affects to plant stability. The licensee also recognized the trend in service air system performance and documented it in AR 4790510, Trend IR:

Low Service Air Header Pressure, on July 30, 2024. These issues prompted the station to take several system outage windows to repair deficiencies and to evaluate modifying the preventative maintenance frequency. However, performance issues persist as seen by the most recent ARs documenting service air header pressure drops. At the time of documenting this observation, the site was tracking the latest issue on the priority work list. The above issues did not result in a plant transient.

The inspectors did not identify any findings or violations of NRC requirements in the course of this review.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 17, 2024, the inspectors presented the integrated inspection results to Greg Englehardt, Director of Engineering, and other members of the licensee staff.
  • On August 30, 2024, the inspectors presented the radiation protection inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
  • On September 20, 2024, the inspectors presented the biennial licensed operator requalification program inspection results to Norha Plumey, Site Vice President, and other members of the licensee staff.
  • On September 30, 2024, the inspectors presented the radiation protection inspection results to Frank Owens, Acting Radiation Protection Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4802607

1AP60E3D Diesel Gen. 1A Immersion Heater H1 Breaker

Cycling

09/17/2024

Corrective Action

Documents

AR 4802712

1TS-DG078 Immersion Htr Temp Sw Not Working, Div 1

DG 12 Cyl

09/18/2024

AR 4792766

NRC ID: Corrosion on 1C11-F155C SDV C Scram Switch

Instrument Root Valve

08/08/2024

AR 4802531

NRC Identified 1PSDG122 Pressure Switch Identified Oil

Leak

09/17/2024

Corrective Action

Documents

Resulting from

Inspection

AR 4802537

NRC ID Div 1 DG Oil System Piping Fitting Leak

09/17/2024

M05-1078, Sheet 1

P&ID Control Rod Drive (RD)

W

Drawings

M05-1078, Sheet 3

P&ID Control Rod Drive System

G

CPS 3214.01

Plant Air (IA & SA)

CPS 3214.01E001

Plant Air Electrical Lineup

10a

CPS 3214.01V001

Plant Air Valve Lineup

CPS 3304.01

Control Rod Hydraulic & Control (RD)

CPS 3304.01E001

Clinton Rod Drive Hydraulic Electrical Lineup

CPS 3304.01V001

Control Rod Hydraulic and Control Valve Lineup

16d

CPS 3316.01E001

Containment Combustible Gas Control Electrical Lineup

11a

CPS 3316.01E002

Cont Comb Gas Control 120 VAC Electrical Lineup

7b

CPS 3316.01V001

Containment Combustible Gas Control (HG) Valve Lineup

CPS 3316.01V002

Cont Comb Gas Control Instrument Valve Lineup

CPS 3506.01E001

Diesel Generator and Support Systems Electrical Lineup

18d

71111.04

Procedures

CPS 3506.01V001

Diesel Generator and Support Systems Valve Lineup

13a

CPS 1893.04M130

781-790 Auxiliary: Div 2 Switchgear Prefire Plan

5b

CPS 1893.04M132

781 Auxiliary (East): Div 1 Switchgear Prefire Plan

5b

CPS 1893.04M330

751 Control Building: HVAC Mezzanine Prefire Plan

6c

CPS 1893.04M631

2 Radwaste: Tank & Equipment Area Prefire Plan

5a

CPS 1893.04M700

2 Turbine: Basement Prefire Plan

6b

CPS 1893.04M701

2 Turbine: Condensate Booster Pump Room Prefire Plan

6a

CPS 1893.04M702

709 Turbine: Condensate Pump Room Prefire Plan

6a

71111.05

Fire Plans

CPS 1893.04M720

2 Turbine: Turbine Auxiliaries Prefire Plan

6c

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CPS 1893.04M722

2 Turbine: Turbine and Lube Oil Reservoir Prefire Plan

4a

CPS 1893.04M740

800 Turbine: Turbine Deck Prefire Plan

5c

CPS 1893.04M741

805 Turbine: Hydrogen Analyzers Prefire Plan

AR 4070501

NRC ID - Active License Proficiency Watches

11/03/2018

AR 4117939

PCRA OP-AA-105-102 - Clarify License Maintenance

Requirement

03/22/2018

Corrective Action

Documents

Simulator Work

Request Report

Report Documenting Simulator Work Orders Since Last

Inspection Activity and Required Per ANSI Standard for

Simulator Testing

Corrective Action

Documents

Resulting from

Inspection

AR 4802409

Admin Error Found on Active License Tracking Log

09/17/2024

24 LORT

Biennial Exam 1

Crew A 2024 Licensed Operator Requalification Training

Biennial Written Examination

24

24 LORT

Biennial Exam

Operating Test

24 Licensed Operator Requalification Training Biennial

Examination Operating Test Job Performance Measures

(10), Simulator Scenarios (4), and Comparison Documents

of Other Requalification Exams Given During the 2024

LORT Cycle

24 Simulator

Testing Data

24 Fuel Cycle Load Event Testing, Steady State Testing,

and Resultant Data Points

ANS/ANSI-3.4-

1983

American National Standard Medical Certification and

Monitoring of Personnel Requiring Operator Licenses for

Nuclear Power Plants

1983

ANS/ANSI-3.5-

2009

American National Standard Nuclear Power Plant

Simulators for Use in Operator Training and Examination

2009

NRC Integrated

Inspection Report 05000373/2018001

and

05000374/2018001

LaSalle County Station, Units 1 and 2 - NRC Integrated

Inspection Report 05000373/2018001 and

05000374/2018001

05/11/2018

71111.11B

Miscellaneous

NRC Operator

Licensing Program

Section ES-5.3, Maintaining, Changing, and Renewing

Operator Licenses, Item 5.3.2 (605.4)

05/14/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Feedback (FAQ)

NUREG-1021

Operator Licensing Examination Standards for Power

Reactors

OP-AA-105-102

- Active License Tracking Log

Operator Medical

Files

Reviewed 10 Licensed Operator Medical Files Containing

License Restrictions as Required per the Inspection

Procedure

TQ-AA-155-F05

(Equivalent)

Simulator Evaluation Form - Crew (Crew A)

09/18/2024

TQ-AA-155-F05

(Equivalent)

Simulator Evaluation Form - Individuals (Six Individual

Evaluation Forms for Six Crew A Members)

09/18/2024

OP-AA-105-102,

Revision 18, NRC

ACTIVE LICENSE

MAINTENANCE

NRC Active License Maintenance Procedure

OP-AA-112-101

Shift Turnover and Relief

TQ-AA-150-F03A

JPM Evaluation Results Form A for Each Crew A Licensed

Operator Examined

09/19/2024

TQ-AA-150-J202,

Operator Training Program, Attachment 1, LORT Program

Classroom Summary

20-005

TQ-AA-201

Examination Security and Administration

TQ-AA-250

Operator Training Programs

TQ-AA-306

Simulator Management

Procedures

TQ-AA-306-F-03

Simulator Test Coversheet

Self-Assessments AR 4769392

Self-Assessment Pre-NRC 71111.11 Inspection Licensed

Operator Requalification Training Assessment

05/20/2024

Miscellaneous

ESG-LOR-OBE-

004

Clinton Power Station Licensed Operator Training

Simulator Exercise Guide

CPS 3304.02

Rod Control and Information System (RC&IS)

23d

71111.11Q

Procedures

OP-AB-300-1003

BWR Reactivity Maneuver Guidance

AR 4139878

EOID Breaker Tripped for 0SA01C Immersion Heater

05/22/2018

AR 4554895

0SA01C Introducing Air Into CCW

2/16/2023

AR 4704289

Trip of 0SA01C, Service Air Compressor 0

09/22/2023

71111.12

Corrective Action

Documents

AR 4704289-09

Work Group Evaluation for Trip of

01/24/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Service Air Compressor 0

Engage Health AR

4704289

Service Air Compressor 0 (a)(1) Determination

04/24/2024

Engage Strategy 0

Service Air

Compressor

Performance Centered Maintenance (PCM) Template

07/30/2008

Miscellaneous

Engage Strategy 0

Service Air

Compressor

Maintenance Strategy

2/10/2017

ER-AA-200-1003

Maintenance Strategy Analysis

Procedures

ER-AA-200-1004

PCM Templates

Corrective Action

Documents

AR 4796050

1WX020 PCIV Closing Stroke Time Exceeded Limiting

Value

08/22/2024

Engineering

Evaluations

CL1-22A-001

Paragon Evaluation of Risk Associated With 1E31-N559A

Inoperable

08/06/2024

RICT Record for 1WX020 Inoperable

08/29/2024

Miscellaneous

OP-AA-108-118

RICT Record

ER-AA-600

Risk Management

ER-AA-600-1042

On-line Risk Management

ER-AA-600-1052

Risk Management Support of RICT

ER-AA-600-1053

Calculation of RMAT and RICT for Risk Informed

Completion Time Program

ER-CL-600-2001

Clinton RICT System Guidelines

OP-AA-108-117

Protected Equipment Program

OP-AA-108-118

Risk Informed Completion Time

WC-AA-101

On-line Work Control Process

71111.13

Procedures

WC-AA-101-1006

On-line Risk Management and Assessment

Calculations

IP-M-0563

Determination of Allowable Leak Rates and Loss of UHS

Volume from Shutdown Service Water (SX) Boundary

Valves

2B

Engineering

Changes

2031

Installation of Temporary Deflector Shield over Sensors

1E31-N559A/B

165

IST Valve Evaluation Form for 1WX020

71111.15

Engineering

Evaluations

CL-2024-S-036

1WX019 and 1WX020 Closure Time Revision

08/29/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ECR 463937

08/15/2024

ESOMS Operations Narrative Log Entries from

08/06 to 08/12/2024

08/12/2024

4785273-02

SX Boundary Leakage Evaluation as per CPS 9861.09

07/08/2024

AC-WS-2408-0001

Adverse Condition Monitoring and Contingency Plan for

WS Heater Bay Leak

08/11/2024

Miscellaneous

TS 3.8.4

Electrical Power Systems, DC Sources - Operating

08/29/2024

Operability

Evaluations

21732

Division 2 VX Switchgear Heat Removal, 1VX06CB

CPS 1401.09

Control of System and Equipment Status

10b

CPS 3412.01

Essential Switchgear Heat Removal (VX)

16a

CPS 3412.01C002

Temporary Exhaust Fan Use with Switchgear HVAC Out of

Service (Div 2)

0b

CPS 3503.01

Battery and DC Distribution (DC)

19c

CPS 3503.01C006

Class 1E Swing Battery Charger 1DC11E Feed to Safety

Related DC Bus Checklist

5c

CPS 3503.01E001

Battery and DC Distribution Electrical Lineup

14b

CPS 9082.02

Electrical Distribution Verification

36e

CPS 9861.09D006

Leakage Test on Valve 1CC075A and 1CC076A

2d

Procedures

OP-CL-108-104-

1001

ITS LCO/ORM OR Evaluations and Guidance for Safety

Function Determination

11c

AR 4792133

Suspect Reading on MCR 9000 Data for E31-N559A MSL

Turb Bldg

08/06/2024

Corrective Action

Documents

AR 4792147

1E31-N559B MSL Turb Bldg Temperature Suspect

08/06/2024

Engineering

Changes

EC 642031

Installation of Temporary Deflector Shield Over Sensors

1E31N559A/B

Miscellaneous

DC-SD-01-CP

General Structural Project Criteria

WO 5549752-08

MM 1WS10B-12" Install TCCP EC 642031 Deflector Shield

08/08/2024

71111.18

Work Orders

WO 5549752-09

MM 1WS10B-12" Fabricate Deflector Shield

08/07/2024

AR 4766454

Expanded Scope on 1SF01PA

04/15/2024

AR 4767932

1SF01PA Degraded Flow

04/20/2024

71111.24

Corrective Action

Documents

AR 4770404

LARC Valve 1SF006A Recircing 570 GPM with Loud

Cavitation

04/29/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4774197

Fire Pump B Battery Failure

05/14/2024

AR 4774201

Fire Pump B Cooling Water Gauge Suspect

05/14/2024

AR 4774203

Fire Pump B Engine Tachometer Suspect

05/14/2024

AR 4778116

Service Air Header Pressure Drop

06/02/2024

AR 4783043

Service Air Header Pressure Drop Again

06/25/2024

AR 4784641

Fire Pump B Auto Start During Flushing Activities

07/02/2024

AR 4788182

Unexpected Alarm 5009-3H PPC Alarm Low SA Header

Pressure

07/19/2024

AR 4788273

No Oil Mist Observed From 1DG16ML and 1DG16MA

During 9080.01

07/20/2024

AR 4790510

Trend IR: Low Service Air Header Pressure

07/30/2024

AR 4794213

EOID Out of Spec Data for Div 1 DG

08/15/2024

AR 4797469

Unexpected MCR Alarm 5009-3H PPC Alarm DC Bus 1A

Voltage Low

08/28/2024

AR 4800087

Abnormal Div 1 DC Voltage Trend, Issue with D1 DC

Charger

09/08/2024

AR 4800877

1DC06E Failed to Control Voltage

09/11/2024

164

1SX01PC IST Pump Evaluation Form

Miscellaneous

ECR 464283

Division 1 DC Charger Voltage Trend

CPS 2858.01

Division 3 SX Baseline Testing

0c

CPS 3506.01P001

Division 1 Diesel Generator Operations

6a

CPS 9015.01

Standby Liquid Control System Operability

CPS 9069.01P004

Division 3 Shutdown Service Water Operability Test

CPS 9080.01

Diesel Generator 1A Operability - Manual and Quick Start

Operability

CPS 9080.12

Diesel Generator Fuel Oil Transfer Pump Operability

CPS 9080.18

DG 1A Overcrank Delay Timer Test, Differential

Overcurrent Trip Test, and Trip Bypass Operability

Procedures

CPS 9080.30

Diesel Generator Overspeed Trip Test

5b

WO 4837557-02

EM PMT SAT Performance of 9382.08

09/11/2024

WO 4837557-05

EM 1DC06E Pre-Test/Inspect New Components

2/21/2024

WO 5290874-05

OP 2FP013 Run Fire Pump for PMT

06/22/2024

Work Orders

WO 5408994

OP 1DG01CB Return Compressor to Service

08/17/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO 5415463-03

OP 1DG01CB: PMT

08/17/2024

WO 5481696

MM 1SF01PA Rebuild Pump

04/08/2024

WO 5481696-02

OP 1SF01PA PMT

05/07/2024

WO 5481696-11

OP 1SF01FA PMT

04/20/2024

WO 5533634

MM - 1SF006A - Rebuild Recirc Valve

07/30/2024

WO 5552917-07

MM - 0SA01D - Re-Place/Build 657-658/198D/655-656

07/19/2024

WOs 5292113 and

5555399

07/24/2024

WOs 5349753,

5349754, 5396014,

5350815, 5349426,

and 5348729

Various 2-Year Scheduled Maintenance Work Orders

09/19/2024

WOs 5409930-09

and 5542309

Various Div 3 SX Work Orders

08/27/2024

Calibration of the FASTSCAN WBC System at the

Constellation Clinton Power Station

2/10/2023

Calibration of the FASTSCAN WBC System at the

Constellation Clinton Power Station

03/25/2024

Certificate

  1. 0011443808

Certificate of Calibration - RO20

05/12/2024

Certificate

  1. 0011471083

Certificate of Calibration - Ludlum 177

2/27/2024

Certificate

  1. 0011485502

Certificate of Calibration - Telepole

2/18/2024

Certificate

  1. 0011489045

Certificate of Calibration - AMS-4

10/03/2023

Certificate

  1. 0011515046

Certificate of Calibration - Ludlum 3

2/13/2024

Certificate

  1. 0011524272

Certificate of Calibration - AMP-100

03/12/2024

Certificate

  1. 0011525375

Certificate of Calibration - Ludlum 3030P

07/05/2024

71124.05

Calibration

Records

Certificate

  1. 0011538204

Certificate of Calibration - RAM GAM 1

05/22/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

P.O. #1429098

JL Shepherd Model 89-400 Irradiator Inspection /

Performance Test and Calibration Report

07/15/2024

Ref No: S134892

Certificate of Conformance - Ion Chamber and Control Unit

07/09/2024

RP-AA-700-1240,

ARGOS-5 Calibration Data Sheet

07/02/2024

Design Analysis

No. IP-O-0149

Reg Guide 1.97 Indicator Loop Uncertainty Evaluation for

the Drywell and Containment High Range Gamma

Radiation Monitors

10/21/2005

Miscellaneous

STI Change

Request Number

CL-17-015

Revise the frequency of Technical Specification

Surveillance Requirements for the Unit 1 Hi-Range Gamma

Channel Calibration from Current Interval of 24 Months to

Months

04/16/2019

RP-AA-700

Controls for Radiation Protection Instrumentation

Procedures

RP-AA-700-1240

Operation and Calibration of the Canberra Argos-5

Personnel Contamination Monitor

AR 4469159

Exelon Power Labs Self-Assessment

08/11/2022

Self-Assessments

AR 4695930

NRC Inspection Guide 71124.05 Radiation Monitoring

Instrumentation

06/10/2024

WO 4907587-02

Accident Range Stack Monitor (AXM) 0RIX-PR008 Channel

Calibration

01/29/2021

WO 5293883

HVAC System Exhaust PRM 0RIX-PR002 Calibration

05/23/2024

WO 5299837

SGTS Exhaust PRM 0RIX-PR003 Channel Calibration

06/18/2024

WO 5530112

9437.62A0 CF Liquid PRM Surv Quarterly CF (PR036)

07/19/2024

Work Orders

WO 5556196

9038.70A03 SC Rad Monitoring Source Checks

(1RIX-PR036)

08/14/2024

AR 4564258

0RIX-PR012 Sample Pump is Failed

03/23/2023

AR 4703051

1RIX-PR005 FC Hx B Liquid PRM

09/16/2023

Corrective Action

Documents

AR 4721436

ODCM Sample Collected Outside Surveillance Grace

Period

2/01/2023

10CFR61 Analysis

7-26-22

Report of Analysis/Certificate of Conformance

07/26/2022

22 Land Use

Census

22 Annual Land Use Census Evaluation and Summary

10/24/2022

71124.06

Miscellaneous

23 Land Use

23 Annual Land Use Census Evaluation and Summary

11/28/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Census

230-210-G

HVAC Stack Gas Permit Post-Release Data

06/16/2023

230-215-G

SGTS Stack Gas Permit Post-Release Data

07/05/2023

U-604760

Clinton Power Station 2022 Annual Radioactive Effluent

Release Report

04/26/2023

U-604802

Clinton Power Station 2023 Annual Radioactive Effluent

Release Report

04/10/2024

9432.42

Main Stack Flow Monitor 0FT-VR500 Channel Calibration

9432.43

Standby Gas Treatment System (SGTS) Flow Monitor

0FT-VG001 Channel Calibration

9911.60

Gaseous Radioactive Effluent Surveillance

CY-CL-1024-35

Radioactive Effluent Management Program

CY-CL-170-201

SGTS Stack Effluent - Iodine and Particulates

CY-CL-170-301

Offsite Dose Calculation Manual

CY-CL-170-4161

Radiological Abnormal Release EAL Assessment

CY-CL-6949-01

Off-Gas Pre-Treatment Sampling and Analysis

CY-CL-6954-01

HVAC Stack Effluent Noble Gas and Tritium

Procedures

CY-CL-6954-02

HVAC Stack Effluent - Iodine and Particulates

Self-Assessments PI-AA-126-1001-F-

NRC Inspection: Radioactive Gaseous and Liquid Effluent

Treatment

06/10/2024

Work Orders

WO 5526895

9940.01B (WS) Service Water Sample for Activity - 1PR036

07/12/2024

CY-AA-130-301 0-

F-03

Dose Equivalent Iodine Determination

Various

Miscellaneous

SP-AA-3000

Site Performance Indicator Validation Sheet - Performance

Indicator Name - Radiation Protection PI Index

Various

9911.59

Gaseous Radioactive Effluent Surveillance - Monthly

Various

CL-MSPI-001

Reactor Oversight Program MSPI Basis Document

013

71151

Procedures

CY-AA-130-3010

Dose Equivalent Iodine Determination

6