ML17228B101

From kanterella
Revision as of 06:14, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1995 for St Lucie.W/950414 Ltr
ML17228B101
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1995
From: Rogers J, Sager F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-116, NUDOCS 9504180276
Download: ML17228B101 (13)


Text

P R.XC3H.IMV' CUE LERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504180276 DOC.DATE: 95/03/31 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant;Unit 1, Florida Power&Light Co.50-389 St., Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.

Florida Power&Light Co.SAGER,F.A.

Florida Power&Light Co.RECIP.NAME

'ECIPIENT AFFILIATION DOCKET g 05000335 05000389 P

SUBJECT:

Monthly operating repts for Mar 1995 for St Lucie.W/950414 ltr..DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR L ENCL L SIZE:/TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS F~~HATEREEEE40 1~RR/DePS/OX'Cs'XTERNAL:

LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1~1 1 1 1 1 1 1 D C U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXI'.504-2083)TO ELIMINATE YOUR NAME I:ROM DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 Florida Power&Light Company, P.O.Box 128, Fort Pierce.FL 34854-0128 April 14, 1995 L-95-116 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1995, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions'on this information, please contact US~Very truly yours, D.A.Sager Vice President St.Lucie Plant fo r DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments 950418027g PDR ADQCK 05000335 PDR!, an FPL Group company

~~~~

OPERATIHG DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: MARCH 1995 3~LICENSED THERMAL POWER (MWT): 2700 4.HAMEPLATE RATING (GROSS WE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SIHCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASOHS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11~HOURS IN REPORT PERIOD: 12.HUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEHERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (HWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21'APACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 744 571.7 0.0 565.0 0.0 1484353 491330 463183 75.9 75.9 74'75.0 0.0 2160 1940.6 0.0 1933.2 0.0 5172738 1719910 1629700 89.5 89.5 89.9 90.9 0.0 160200.0 125264.4 205.3 123890.0 0.0 320906479 105869920 100066603 77.3 77.4 76.7 76.1 3.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:

50-335 St.Lucie¹1 April 7, 1995 J.A.ROGERS (407)468-4157 MONTH DAY 3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94 3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 AVERAGE DAILY POWER LEVEL (MWe-Ne t)-7-7-10-11-17-29-34 163 613 760 850 852 851 852 853 851 851 851 851 852 853 853 852 851 851 852 851 850 849 849 850 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I: DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE:

(407)468-4157 REPORT MONTH No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report¹System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 950227 950308 226.8 0.0 B N/A N/A CB VALVEXX RC FUELXX Unit 1 offline to repair quench tank leak.Unit 1 held at 66%power due to fuel limitations.

F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4)161)

Exhibit 1-Same Source tslss7 FPL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO~: UNIT: DATE COMPLETED BY TELEPHONE:

50-335 St.Lucie gi 4/7/95 J.A.Rogers (407)468-4157 REPORT MONTH March 1995 The Unit started the month in a scheduled maintenance outage to repair pressurizer code safety valve seat leakage.The Unit returned to service on March 8, 1995, and operated at reduced power until March 9, 1995 due to fuel limitations.

The Unit operated at essentially full power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.A replacement copy of the Zanuary 1995 Operating Data Report for Unit 1 is included to correct an error reported on line 17 as requested by NRC contractor Gary Roberts of INEL.

OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 3/24/95 FPL LICENSING GROUP-JUNO TELEPHOHE 407/694/4432 1.UNIT NAME: ST.LUCIE UHIT 1 2.REPORTING PERIOD: JANUARY 1995 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHAHGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MllE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL EHERGY GEHERATED (MWH)17.GROSS ELECTRICAL EHERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USIHG MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER HEXT 6 MONTHS: 744 744~0 0~0 744.0 0.0 2008954 669340 636037 100.0 100.0 101.9 103.0 0.0 744 744.0 0.0 744.0 0.0 2008954 669340 636037 100.0 100.0 101.9 103.0 0'158784.0 124067.8 205.3 122700.9 205.3 317742695 104819350 99072940 77.3 77.3 76.6 76.0 3.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

OPERATIHG DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST~LUCIE UNIT 2 2.REPORTING PERIOD: MARCH 1995 3.LICENSED THERMAL POWER (HWT): 2700 4.NAHEPLATE RATING (GROSS MWE): 850 5.DESIGH ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11~HOURS IN REPORT PERIOD: 12.NUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GEHERATOR ON-LINE 15.UNIT RESERVE SHUTDOWH HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL EHERGY GEHERATED (HWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC HET)22~CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS: 744 744.0 0.0 744.0 0.0 2003552 662790 628494 100.0 100~0 100.7 101.8 0.0 2160 2085.4 0.0 2081.3 0.0 5563433 1843170 1744974 96.4 96.4 96.3 97.3 3.6 102097.0 86353.1 0;0 84948.3 0.0 220760974 73296880 69250854 83.2 83.2 81.8 82.2 6.9 25.IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-389 St.Lucie¹2 April 7,1995 O'.A ROGERS (407)468-4157 MONTH DAY 3/01/94 3/02/94 3/03/94 3/04/94 3/05/94 3/06/94 3/07/94 3/08/94 3/09/94 3/10/94 3/11/94 3/12/94 3/13/94 3/14/94 3/15/94 3/16/94 3/17/94 3/18/94 3/19/94.3/20/94 3/21/94 3/22/94 3/23/94 3/24/94 3/25/94 3/26/94 3/27/94 3/28/94 3/29/94 3/30/94 3/31/94 AVERAGE DAILY POWER LEVEL (MWe-Ne t)845'851 851 852 849 848 849 847 848 851 851 852 851 851 849 848 847 820 809 847 849 849 845 845 845 846 834 841 840~841 840 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE:

(407)468-4157 REPORT MONTH No.Date Duration (Hours)Reasona Method of Shutting Down Reactor'icensee Event Report¹System Code4 Component Code'ause&Corrective Action to Prevent Recurrence Unit 2 operated essentially at full power for the entire month.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Adminisuative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insuuctions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG4)161)

Exhibit 1-Same Source 09tssr FFL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: UNIT'ATE: COMPLETED BY0 TELEPHONE:

50-389 St.Lucie g2 4/7/95 J.A.Rogers (407)'68-4157 REPORT MONTH March 1995 Unit 2 operated at essentially full power for the entire month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no.challenges to the PORVs or safety valves during the report period.A replacement copy of the February 1995 Operating Data Report for Unit 2 is included to correct errors reported on lines 14 and 23 as requested by NRC contractor Gary Roberts of INEL.

OPERATING DATA REPORT OPERATING STATUS DOCKET HO 50-389 DATE 4/7/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: FEBRUARY 1995 3.LICENSED THERHAL POWER (MWT): 2700 4.HAHEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIHUM DEPENDABLE CAPACITY (GROSS HWE): 882 7.HAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRiCTED, IF ANY (NET HWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE

'11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL EHERGY GENERATED (HWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (HWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER HET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS: 672 597.4 0.0 593.3 0.0 1551360 513000 483376 88.3 88.3 85.7 86.7 11.7 1416 1341.4 0.0 1337.3 0.0 3559881 1180380 1116480 94.4 94.4 94.0 95.0 5'101353.0 85609.1 0.0 84204.3 0.0 218757422 72634090 68622360 83.1 83.1 81.6 82.0 6.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP: