MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
P R.XC3H.IMV' CUE LERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9504180276 DOC.DATE: 95/03/31 NOTARIZED: NO DOCKET g FACIL:50-335 St. Lucie Plant; Unit 1, Florida Power & Light Co. 05000335 50-389 St., Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION P ROGERS,J.A. Florida Power & Light Co.
SAGER,F.A. Florida Power & Light Co.
RECIP.NAME 'ECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Mar 1995 for St Lucie.W/950414 ltr..
DISTRIBUTION CODE: IE24D TITLE: Monthly Operating Report (per Tech Specs)
COPIES RECEIVED:LTR L ENCL L SIZE: /
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 ~ 1 F~~HATEREEEE40 1 1 1 NRR/DISP/PIPB 1 1 1 1 RGN2 1 1
~RR/DePS/OX'Cs'XTERNAL:
LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
C U
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXI'. 504-2083 ) TO ELIMINATEYOUR NAME I:ROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
Florida Power & Light Company, P.O. Box 128, Fort Pierce. FL 34854-0128 April 14, 1995 L-95-116 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the March, 1995, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions 'on this information, please contact US ~
Very truly yours, fo r D. A. Sager Vice President St. Lucie Plant DAS/GRM cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 950418027g PDR ADQCK 05000335 PDR !,
an FPL Group company
~ ~
~ ~
OPERATIHG DATA REPORT DOCKET NO 50 - 335 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: ST. LUCIE UNIT 1
- 2. REPORTING PERIOD: MARCH 1995 3 ~ LICENSED THERMAL POWER (MWT): 2700
- 4. HAMEPLATE RATING (GROSS WE): 850
- 5. DESIGN ELECTRICAL RATING (NET MWE): 830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
- 7. MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SIHCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASOHS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE 11 ~ HOURS IN REPORT PERIOD: 744 2160 160200.0
- 12. HUHBER OF HOURS REACTOR WAS CRITICAL 571.7 1940.6 125264.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE 565.0 1933.2 123890.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEHERATED (MWH) 1484353 5172738 320906479
- 17. GROSS ELECTRICAL ENERGY GENERATED (HWH) 491330 1719910 105869920
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 463183 1629700 100066603
- 19. UNIT SERVICE FACTOR 75.9 89.5 77.3
- 20. UNIT AVAILABILITYFACTOR 75.9 89.5 77.4 21 'APACITY FACTOR (USING MDC NET) 74 ' 89.9 76.7
- 22. CAPACITY FACTOR (USING DER NET) 75.0 90.9 76.1
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE April 7, 1995 COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe -Ne t) 3/01/94 -7 3/02/94 -7 3/03/94 -10 3/04/94 -11 3/05/94 -17 3/06/94 -29 3/07/94 -34 3/08/94 163 3/09/94 613 3/10/94 760 3/11/94 850 3/12/94 852 3/13/94 851 3/14/94 852 3/15/94 853 3/16/94 851 3/17/94 851 3/18/94 851 3/19/94 851 3/20/94 852 3/21/94 853 3/22/94 853 3/23/94 852 3/24/94 851 3/25/94 851 3/26/94 852 3/27/94 851 3/28/94 850 3/29/94 849 3/30/94 849 3/31/94 850
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I:
DATE: April 7, 1995 COMPLETED BY: J.A.ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Type Duration (Hours)
Reason'ethod of Shutting Reactor'icenseeEvent Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 950227 226.8 B N/A CB VALVEXX Unit 1 offline to repair quench tank leak.
950308 0.0 N/A RC FUELXX Unit 1 held at 66% power due to fuel limitations.
F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4)161)
D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)
H - Other (Explain) tslss7 FPL
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO ~ : 50-335 UNIT: St. Lucie gi DATE 4/7/95 COMPLETED BY J.A. Rogers TELEPHONE: (407) 468-4157 REPORT MONTH March 1995 The Unit started the month in a scheduled maintenance outage to repair pressurizer code safety valve seat leakage. The Unit returned to service on March 8, 1995, and operated at reduced power until March 9, 1995 due to fuel limitations. The Unit operated at essentially full power for the remainder of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
A replacement copy of the Zanuary 1995 Operating Data Report for Unit 1 is included to correct an error reported on line 17 as requested by NRC contractor Gary Roberts of INEL.
OPERATING DATA REPORT DOCKET NO 50 - 335 DATE 3/24/95 FPL LICENSING GROUP - JUNO TELEPHOHE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: ST. LUCIE UHIT 1
- 2. REPORTING PERIOD: JANUARY 1995
- 3. LICENSED THERMAL POWER (MWT): 2700
- 4. NAMEPLATE RATING (GROSS MWE): 850
- 5. DESIGN ELECTRICAL RATING (NET MWE): 830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
- 8. IF CHAHGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MllE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 744 158784.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744 ~ 0 744.0 124067.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0~0 0.0 205.3
- 14. HOURS GENERATOR ON-LINE 744.0 744.0 122700.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
- 16. GROSS THERMAL EHERGY GEHERATED (MWH) 2008954 2008954 317742695
- 17. GROSS ELECTRICAL EHERGY GENERATED (MWH) 669340 669340 104819350
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 636037 636037 99072940
- 19. UNIT SERVICE FACTOR 100.0 100.0 77.3
- 20. UNIT AVAILABILITYFACTOR 100.0 100.0 77.3
- 21. CAPACITY FACTOR (USIHG MDC NET) 101.9 101.9 76.6
- 22. CAPACITY FACTOR (USING DER NET) 103.0 103.0 76.0
- 23. UNIT FORCED OUTAGE RATE 0.0 0' 3.9
- 24. SHUTDOWNS SCHEDULED OVER HEXT 6 MONTHS :
- 25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
OPERATIHG DATA REPORT DOCKET NO 50 - 389 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: ST ~ LUCIE UNIT 2
- 2. REPORTING PERIOD: MARCH 1995
- 3. LICENSED THERMAL POWER (HWT): 2700
- 4. NAHEPLATE RATING (GROSS MWE): 850
- 5. DESIGH ELECTRICAL RATING (NET MWE): 830
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE 11 ~ HOURS IN REPORT PERIOD: 744 2160 102097.0
- 12. NUHBER OF HOURS REACTOR WAS CRITICAL 744.0 2085.4 86353.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0;0
- 14. HOURS GEHERATOR ON-LINE 744.0 2081.3 84948.3
- 15. UNIT RESERVE SHUTDOWH HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2003552 5563433 220760974
- 17. GROSS ELECTRICAL EHERGY GEHERATED (HWH) 662790 1843170 73296880
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 628494 1744974 69250854
- 19. UNIT SERVICE FACTOR 100.0 96.4 83.2
- 20. UNIT AVAILABILITYFACTOR 100 ~ 0 96.4 83.2
- 21. CAPACITY FACTOR (USING MDC HET) 100.7 96.3 81.8 22 ~ CAPACITY FACTOR (USING DER NET) 101.8 97.3 82.2
- 23. UNIT FORCED OUTAGE RATE 0.0 3.6 6.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: April 7,1995 COMPLETED BY: O'.A ROGERS TELEPHONE: (407) 468-4157 MONTH DAY AVERAGE DAILY POWER LEVEL (MWe -Ne t )
3/01/94 845 3/02/94 '851 3/03/94 851 3/04/94 852 3/05/94 849 3/06/94 848 3/07/94 849 3/08/94 847 3/09/94 848 3/10/94 851 3/11/94 851 3/12/94 852 3/13/94 851 3/14/94 851 3/15/94 849 3/16/94 848 3/17/94 847 3/18/94 820 3/19/94 . 809 3/20/94 847 3/21/94 849 3/22/94 849 3/23/94 845 3/24/94 845 3/25/94 845 3/26/94 846 3/27/94 834 3/28/94 841 3/29/94 840 ~
3/30/94 841 3/31/94 840
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT NAME: ST LUCIE UNIT 2 DATE: April 7, 1995 COMPLETED BY: J.A. ROGERS TELEPHONE: (407) 468-4157 REPORT MONTH No. Date Duration (Hours)
Reasona Method of Shutting Reactor'icenseeEvent Report System Code4 Code'ause Component & Corrective Action to Down ¹ Prevent Recurrence Unit 2 operated essentially at full power for the entire month.
F Forced Reason Method Exhibit G - Insuuctions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4)161)
D - Regulatory restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Adminisuative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)
H - Other (Explain) 09tssr FFL
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT'ATE:
St. Lucie g2 4/7/95 COMPLETED BY0 J.A. Rogers TELEPHONE: (407) '68-4157 REPORT MONTH March 1995 Unit 2 operated at essentially full power for the entire month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no .challenges to the PORVs or safety valves during the report period.
A replacement copy of the February 1995 Operating Data Report for Unit 2 is included to correct errors reported on lines 14 and 23 as requested by NRC contractor Gary Roberts of INEL.
OPERATING DATA REPORT DOCKET HO 50 - 389 DATE 4/ 7/95 FPL LICENSING GROUP - JUNO TELEPHONE 407/694/4432 OPERATING STATUS
- 1. UNIT NAME: ST. LUCIE UNIT 2
- 2. REPORTING PERIOD: FEBRUARY 1995
- 3. LICENSED THERHAL POWER (MWT): 2700
- 4. HAHEPLATE RATING (GROSS MWE): 850
- 5. DESIGN ELECTRICAL RATING (NET MWE): 830
- 6. MAXIHUM DEPENDABLE CAPACITY (GROSS HWE): 882
- 7. HAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRiCTED, IF ANY (NET HWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
'11. HOURS IN REPORT PERIOD: 672 1416 101353.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 597.4 1341.4 85609.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 593.3 1337.3 84204.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL EHERGY GENERATED (HWH) 1551360 3559881 218757422
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 513000 1180380 72634090
- 18. NET ELECTRICAL ENERGY GENERATED (HWH) 483376 1116480 68622360
- 19. UNIT SERVICE FACTOR 88.3 94.4 83.1
- 20. UNIT AVAILABILITYFACTOR 88.3 94.4 83.1
- 21. CAPACITY FACTOR (USING MDC NET) 85.7 94.0 81.6
- 22. CAPACITY FACTOR (USING DER HET) 86.7 95.0 82.0
- 23. UNIT FORCED OUTAGE RATE 11.7 5 ' 6.9
- 24. SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS :
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIHATED DATE OF STARTUP: