ML18019A561

From kanterella
Revision as of 05:11, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Informs That Ref Ltr Intended to Clarify That Not All Emergency & Abnormal Operating Procedures Would Be Performed from Control Room,Per Telcon Request.Ser Written Re Availability of Lighting for Safe Shutdown
ML18019A561
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/30/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-85-428, NUDOCS 8602040179
Download: ML18019A561 (3)


Text

('IQ REGUL*TORY jFORMATION DISTRIBUTION 8 M (RIDS)ACCESSION NBR: 8602040179 DOC.DATE: 86/01/30 NOTARIZED:

NO DOCKET¹FACIL: 50-400 Shearon Harris Nuclear Power.Planti Unit ii Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ZIMMERMANi S.R.Carolina Power 5 Light Co.RECIP.NAME RECIPIENT AFFILI*TION DENTONI H.R.OFFice of Nuclear Reactor Regulationi Director (post 851125

SUBJECT:

Informs that ref ltr intended to clarify that not all emergencM 5 abnormal operating procedures would be performed from control roomi per telcon re'quest.SER written re availability of lighting for safe shutdown.DIBTRIBVTION CODE: BOOID COPIEB RECEIVED: LTR g ENCL 0 SIZE: TITLE: Licensing Submittal:

PBAR/FSAR Amdts 5 Related Correspondence NOTES: RECIPIENT ID CODE/NAME PNR-A*DTS PNR-A EB PNR-A FOB BUCKLEY'S B 01 PNR-*RSB INTERNAL: ACRS 41 ELD/HDS1 IE/DEPER/EPB 36 NRR BWR ADTS NRR PNR-B ADTB NRR/DHFT/HFIB N SR DIR REG 04 M/DDAMI/MI8 EXTERNAL: 24X DMB/DSS (AMDTS)NRC PDR 02 PNL GRUELiR COP IEB LTTR ENCL 1 1 1 2 6 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PNR-A PD2 PD PWR-A EICSB PWR-A PD2 LA PNR-A PSB ADM/LFMB IE FILE IE/DGAVT/GAB 21 NRR PWR-A ADTS NRR ROE'.L NRR/DHFT/MTB NRR/DBRO/RRAB RGN2 BNL(AMDTB ONLY)LPDR 03 NBIC 05 COPIES LTTR ENCL 1 1 1 1 1 TOTAL NUMBER OF COPIEB REQUIRED: LTTR 41'NCL

~tv jjn'v II K Q I W l, l WIIW-II I Ki~o K I vi ll'n t vf i't'I>>n')'Ij i tijvv f vt" v nj jt H),I w Lgf't.,II W J ESK.Wg,i.WlnjJ'v I'lj'njv>>v)W nn, nv K II Vy*tl'I't t W wv tlj,'vnt Ij IKI K I K Vv P p'I, jj~.<Wjj.I>tj;I.3,, I (1'.'"vk'Jv j llew" V tt jnn W~V V I v C)f;~P,$'-'W s.'iV,>>" rjtv", I\K e, v,, v fv w~3nj Fl I j Q v't j vtw'Cj vv I w 3 I Kv 3 CMO Carolina Power&Light Company JAN 3 0]986 SERIAL: NLS-85-028 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.I-DOCKET NO.50-000 EMERGENCY LIGHTING

REFERENCE:

CPdcL letter NLS-85-321.

Dear Mr.Denton:

In a recent telephone conversation with members of your staff, a question was raised with regard to the referenced letter.The referenced letter was intended to clarify the fact that not all Emergency Operating Procedures and Abnormal Operating Procedures would be performed entirely from the Control Room.We now understand that this Safety Evaluation Report passage was written with regard to the availability of plant emergency lighting following a Design Basis Earthquake sufficient to achieve and maintain the plant in a safe shutdown condition.

We hope this intended clarification has not inconvenienced any of your staff.Yours very truly, DCM/ccc (3069DCM)cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.j.Nelson Grace (NRC-RII)Mr.Ed Tomlinson (NRC-PSB)Wake County Public Library S.mmerman Manager Nuclear Licensing Section Sb02040i79 860i30 PDR ADQCK 05000400 F 411 Fayettevilte Street o P.O.Box 1551~Raleigh, N.C.27602 t p