ML062130145
From kanterella
Revision as of 19:51, 26 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Other | |
---|---|
TAC:MC9669, (Approved, Closed) | |
Initiation
Questions
Answers Results Other: ML060300028, ML061220630, ML061220716, ML061710422, ML061940175, ML062090293, ML062090294, ML062090300, ML062090304, ML062090305, ML062090307, ML062090309, ML062090318, ML062090319, ML062090322, ML062090324, ML062090328, ML062090333, ML062090338, ML062090380, ML062090387, ML062090388, ML062090488, ML062090490, ML062090493, ML062090496, ML062090497, ML062090498, ML062090499, ML062090546, ML062090561, ML062090563, ML062090565, ML062090567, ML062090569, ML062120406, ML062120407, ML062120408, ML062120410, ML062120412, ML062120415, ML062120477, ML062120480, ML062120491, ML062120498, ML062120543, ML062120549, ML062120625, ML062120629, ML062120631... further results | |
MONTHYEARML0602300482006-01-18018 January 2006
[Table View]G20060065/LTR-06-0042 - Ltr Mark D. Sylvia Concerns Pilgrim and Vermont Yankee Relicensing Applications Project stage: Request ML0621204912006-01-25025 January 2006 Email: (PA) Checking in Project stage: Other ML0603000282006-01-25025 January 2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application Project stage: Other ML0621204982006-01-27027 January 2006 2006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and Pilgrim Project stage: Other ML0621204992006-02-0303 February 2006 2006/02/03-Email: (PA) Fwd: Government to Government Meeting for Vermont Yankee License Renewal Project stage: Meeting ML0621205012006-02-0303 February 2006 E-mail: (PA) Fwd: Government to Government Meeting for Vermont Yankee License Renewal Project stage: Meeting ML0621205022006-02-0303 February 2006 E-mail: (PA) Fwd: Government to Government Meeting for Vermont Yankee License Renewal Project stage: Meeting ML0621205362006-02-0606 February 2006 E-mail: (PA) Fwd: Government to Government Meeting for Vermont Yankee License Renewal Project stage: Meeting ML0621205392006-02-0606 February 2006 E-mail: (PA) Fwd: Government to Government Meeting for Vermont Yankee License Renewal Project stage: Meeting ML0621205432006-02-15015 February 2006 2006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs Around VY Project stage: Other ML0621205492006-02-28028 February 2006 Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont Yankee Project stage: Other ML0621206252006-03-21021 March 2006 Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing Project stage: Other ML0621206292006-03-31031 March 2006 2006/03/31-Email: (PA) Request - License Renewal Work for Cfeb Project stage: Other ML0621206312006-04-0303 April 2006 2006/04/03-Email: (PA) Request - License Renewal Work for Cfeb Project stage: Other ML0621206362006-04-0606 April 2006 Email: (PA) Questions Counts. Project stage: Other ML0621206422006-04-0707 April 2006 Email: (PA) AMP, AMR, and TLAA Questions for PNPS Project stage: Other ML0621300952006-04-10010 April 2006 Email: (PA) 1999 Lr Guidance on Dams Project stage: Other ML0621204152006-04-24024 April 2006 E-mail: (PA) PNPS AMP Questions Project stage: Other ML0612206302006-04-26026 April 2006 License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293 Project stage: Other ML0620905462006-04-27027 April 2006 Email: (PA) PNPS LRA Appendix C - BWRVIP Actions Project stage: Other ML0620904992006-04-28028 April 2006 Email: (PA) Pilgrim Questions to Be Discussed at the Audit Project stage: Other ML0620904882006-05-0404 May 2006 Email: (PA) AMP Questions Project stage: Other ML0620904962006-05-0404 May 2006 Email: (PA) PNPS Template for Not Consistent with Gall AMRs Project stage: Other ML0621206472006-05-0404 May 2006 Email: (PA) Re-assignment of Tables 3.3.2.14-X Project stage: Other ML0620904972006-05-0404 May 2006 Email: (PA) Re-assignment of Tables 3.3.2.14-X Project stage: Other ML0620903222006-05-0505 May 2006 Email: (PA) AMR Template for Not Consistent with Gall Section Project stage: Other ML0620904982006-05-0505 May 2006 Email: (PA) Bolting Integrity Program Project stage: Other ML0620904902006-05-0505 May 2006 Email: (PA) Bolting Integrity Program Project stage: Other ML0620904932006-05-0505 May 2006 Email: (PA) PNPS Template for Not Consistent with GALL AMRs Project stage: Other ML0620903242006-05-0808 May 2006 Email: (PA) Amr'S Questionary for Pilgrim Project stage: Other ML0620903282006-05-0909 May 2006 Email: (PA) AMR Review of Section 3.3 Project stage: Other ML0620903332006-05-11011 May 2006 Email: (PA) Table 3.3.1 AMR Questions Project stage: Other ML0612207162006-05-15015 May 2006 Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293 Project stage: Other ML0620903382006-05-28028 May 2006 Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as Described in the GALL Report Project stage: Other ML0617104222006-06-0707 June 2006 2006/06/07-Pilgrim, License Renewal Application, Amendment 2 Project stage: Other ML0621204102006-06-25025 June 2006 E-mail: (PA) Additional AMR Question - Section 3.1.1 Project stage: Other ML0621204082006-06-26026 June 2006 E-mail: (PA) Schedule Project stage: Other ML0621301452006-06-26026 June 2006 Email: (PA) Audit Report Attachment 5 - List of Documents Project stage: Other ML0620903882006-06-27027 June 2006 Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses Project stage: Other ML0621204072006-06-27027 June 2006 E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses Project stage: Other ML0620903182006-06-29029 June 2006 Email: (PA) QA for Aging Management of NSR Components Project stage: Other ML0620903092006-06-29029 June 2006 Email: (PA) Jim and Peter Project stage: Other ML0621300572006-06-29029 June 2006 Email: (PA) Additional Question from Bob Jackson Project stage: Other ML0621300582006-06-29029 June 2006 Email: (PA) QA for Aging Management of NSR Components Project stage: Other ML0621300562006-06-29029 June 2006 Email: (PA) Non-Safety Related Scs Project stage: Other ML0620905692006-06-29029 June 2006 Email: (PA) QA for Aging Mangement of NSR Components Project stage: Other ML0620903192006-06-29029 June 2006 Email: (PA) PNPS Shell Project stage: Other ML0621204062006-06-29029 June 2006 E-mail: (PA) - None - Project stage: Other ML0621204232006-06-30030 June 2006 Email: (PA) Draft AMP Section of Audit Report Project stage: Draft Other ML0621300182006-06-30030 June 2006 Email: (Pa:) Fwd: Questions and Answers of Pilgrim LRA Aging Management Reviews Project stage: Other 2006-04-03 |
ML062130145 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 06/26/2006 |
From: | Patel E - No Known Affiliation |
To: | Davis J A, Hoang D V, Nguyen D T, Wen P C Division of Regulatory Improvement Programs |
References | |
%dam200612, TAC MC9669 | |
Download: ML062130145 (22) | |
Similar Documents at Pilgrim | |
---|---|
Category:Audit Report
MONTHYEARML14349A5182015-01-26026 January 2015
[Table view]Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14071A2332014-04-11011 April 2014 Audit of the Licensee'S Management of Regulatory Commitments ML13225A5872013-12-16016 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML1034306602011-02-0909 February 2011 Audit of the Licensee'S Management of Regulatory Commitments ML0719100702007-07-20020 July 2007 Audit of the Licensee'S Management of Regulatory Commitments ML0631102782006-11-0101 November 2006 Audit and Review Report for Plant Aging Management Reviews and Programs Pilgrim Nuclear Power Station ML0625801622006-09-15015 September 2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, Dated January 25, 2006 ML0630704202006-09-13013 September 2006 E-Mail: Entergy Memo of 9/13/2006 - Pilgrim ML0630705362006-07-12012 July 2006 2006/07/12-E-mail: Fwd: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment a ML0621300862006-07-0606 July 2006 Email: (PA) Fyi: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 ML0621300892006-07-0505 July 2006 Email: (PA) Draft AMP Section of Audit Report ML0621204232006-06-30030 June 2006 Email: (PA) Draft AMP Section of Audit Report ML0621301452006-06-26026 June 2006 Email: (PA) Audit Report Attachment 5 - List of Documents 2015-01-26 Category:E-Mail MONTHYEARML22335A2802022-11-0404 November 2022
[Table view]11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML062130145&oldid=1145377"