Forwards Addl Info Re Interaction of non-Category I Piping W/Category I Piping,In Response to Mechanical Engineering Branch SER Confirmatory Item 5.Seismic/nonseismic Interface Anchor Design Effort 90% Complete
ML18018B785
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/26/1984
From: ZIMMERMAN S R
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
NLS-84-411, NUDOCS 8410030195
Download: ML18018B785 (5)


Text

REGULATOR INFORMATION DISTRIBUTION S STEM (RIDS)ACCESSION NBR:8410030195 OOC~DATE: 84/09/26 NOTARIZED:

NO FACIL:50-400 Shearon Harris"l4uclear Power Planti Unit 1~Carolina-AUTH;NAME AUTHOR AFFILIATION ZIMMERMANis,R, Carolina Power L Light-.Co.RECIPeNAME~

RECIPIENT AFFILIATION DENTONiH,R.

Office~of Nuclear Reactor Regulationr Director

SUBJECT:

Forwards addi info re interaction of non"Category.

I piping w/Category Ipipingiin*

response to, Mechanical Engineering Branch SER Confirmatory Item 5.Seismic/nonseismic interface anchor-design effort 90K complete, OISTRIBUTIoN CODE e B0010 COPIES'RECEIVED'TR

'NCL L, SIZE'.TITLE: Licensing'Submittal:

PSAR/FSAR Amdts 8, Related Correspondence J NOTES: DOCKET 05000400 RECIPIENT IO CODE/NAME NRR/DL/ADL NRR IB3 LA INTERNAL;ADM/LFMB IE FILE IE/OEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB., 28 NRR/OE/MTEB 17 NRR/DE/SGEB

'25 NRR/OHFS/I.QB 3?'RR/OLiSSPB NRR/OSI/ASB NRR/DSI/CSB-09 NRR/DS I/METB 12', AB 22'EG FILE 04/MI8 EXTERNAl.:

ACRS OMB/DSS (AMOTS)LPDR 03 NSIC 05 COPIES'TTR ENCL 1 0 1 0 1 0 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 6 6 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR LB3 BC BUCKLEYgB 01 ELD/HOS1 IE/OEPER/EPB 36 IE/OQA SIP/QAB21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 16 NRR/DE/SAB 24 NRR/OHFS/HFEB40 NRR/DHFS/PSRB NRR/OS I/AEB 26 NRR/DSI/CPS 10 NRR/DSI/ICSB 16'RR/DS I/PSB 19 NRR/DSI/RSB 23 RGN2 BNL(AMDTS ONLY)FEMA REP DIV 39 NRC POR 02 NTIS COPIES LTTR ENCL 1 0'1 1 0 3 3'1 1 1 2?" 1 1 1 1 1 1 1 1 1 1 1'.1 l.1 1 3" ,TOTAL NUMBER OF COPIES REQUIRED: LTTR 54 ENCL 46

,~1 11, ll$ln~1 W~Ih'I'")~]If~)4~f;)),lw)<fl)~n n nl~')'lI lw)nnlg~1,'ll"'I, nn')1'W nn'>>n',I'~~n~l nn f I'I I$nn'f NI n n 1'lwI)),I~I 1 nn II'I'/r'"'f nf n))1 wC, I n rr 1 I'I I I fn I w l1 t

@ME, Carolina Rower&Light Company SEP 36 1980 SERIAL: NLS-84-411 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 PIPING SUPPORTS

Dear Mr.Denton:

Carolina Power 6 Light Company (CP&L)hereby submits additional information concerning the interaction of Non-Category I piping with Category I piping at the Shearon Harris Nuclear Power Plant.This information is submitted in response to Safety Evaluation Report Confirmatory Item 5 from the Mechanical Engineering Branch.If you have any questions or require additional information, please contact me.Yours very truly, S.R.immerman Manager Nuclear Licensing Section JHE/pgp (596JHE)Attachment cct Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Mr.David Terao (NRC-MEB)Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright,(ASLB)

Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)Boippsp>9>

~pppppp 84p+>6 PDR ADOCK P PDR E 411 Fayettevilte Street o P.O.Box 1551 e Raleigh.N.C.27602 Shearon Harris Nuclear Power Plant SER Confirmatory Item No.5 Pi in Su orts Confirmator Item: Evaluate the interaction of Non-Category I piping with Category I piping to the criteria established at the CP&L/NRC meeting of October 24, 1983.~Res ense: CP&L has completed its review of the seismic/non-seismic interface anchors utilized at SHNPP.The review was conducted to determine and demonstrate that the criteria as established at the October 24, 1983 meeting between the NRC and CP&L had been satisfied in the SHNPP design.The criteria established in the October 24, 1983 meeting was documented by CP&L letter dated December 1, 1983 (attached).

A review of 1141 piping stress isometrics identified 220 seismic/non-seismic interface anchors.104 of these anchors were found to be acceptable as designed-60 large bore and 44 small bore.18 anchors failed the pipe yielding moment analysis-12 large bore and 6 small bore.These 18 anchors had vertical supports only on the non-seismic side of the anchor.Lateral restraints have since been designed on the non-seismic side of these anchors.such that criterion 2 is satisfied for the 6 small bore anchors and criterion 3 is satisfied for the 12 large bore anchors.The remaining 98 anchors-7 large bore and 91 small bore had no supports designed on the non-seismic side of the anchors when the study was conducted.