Requests Concurrence for Performing Hot Functional Testing & Reduced Duration Peak Pressure Integrated Leakage Rate Testing by 860115.Containment Atmosphere Stabilization Criteria of Section 2.3.A of BN-TOP-1 Will Be Used
ML18019A501
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/23/1985
From: ZIMMERMAN S R
CAROLINA POWER & LIGHT CO.
To: DENTON H R
Office of Nuclear Reactor Regulation
References
NLS-85-488, NUDOCS 8512310254
Download: ML18019A501 (4)


Text

REGULA Y INFORMATION DISTRIBUTIO YSTEN (BIDS)ACCESSI5lN NBR: 8512310254 DOC.DATE: 85/12/23 NOTARIZED:

NO DOCKET I FACIE".: 50-400 Shearon Harris Nuclear Power Plant~Unit ii Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ZINNERMAN>

S.R.Carolina Polller Zc Light Co.RECIP.NANE RECIPIENT AFFILIATION DENTON, H.R.Off ice of-Nuclear Reactor Regulation.

Director (p ost 851125

SUBJECT:

Requests concurrence for performing hot ('nctional testing 8c reduced duration peak pressure integrated leakage rate testing bg 860115.Containment atmosphere s tab lizati:on criteria of Section 2.3.A of BN-TOP-1 vill be used.DISTRIBUTION CODE: B001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: Licensing Submittal:

PSAR/FSAR Amdts Zc Related Correspondence NOTES: RECIPIENT ID CODE/NAI'IE PNR-A ADTS PMR-A PD2 LA INTERNAL.ACRS 41 ELD/HDSi IE/DEPER/EPB 36 NRR BMR ADTS NRR PNR-B ADTS NRR/DHFT/HFIB NRR/D IR 04 RN/DDANI/MIB EXTERNAL.24X DNB/DSS (ANDTS)NRC PDR 02 PNL GRUEL, R COPIES LTTR ENCL 1 6 1 1 1 1 0 1 0 1 1 1 1 1 RECIPIENT ID CODE/NANE P4IR-A PD2 PD BUCKLEY'S B 01 ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PMR-A ADTS NRR ROE.N.L NRR/DHFT/MTB NRR/DSRO/RRAB RQN2 BNL(ANDTS ONLY)LPDR 03 NSIC 05;COPIES LTTR ENCL~p', QFl gP Q~lla~CI pl CSB'P~tE, CG iffy W~(l (.B~~t'~~(kt:T~O~QP(Q TOTAL NURSER OF COPIES RESUTRED: LTTR Q ENCL

'N Nh" N Nri'>>)NRR'I/l I'~N)j D D h I'I I N Ir'NjN l,a (NUN Ntj'N I N,'l N N, Nl'jl I I)rh't'NSI al<<'I R rl't)t')RI"'r ,'IUI'a)lj'l)~I')(4 It I'(I"41+h;D IUD'I Nj'I'j()Q,g<<NII'4~)'<<p f~3(S R I I lt Ntt)I" (.I, II I ,'R,'3" ail N S'ad'(Su I ll hh<<N j I" SN tl>>I 4~I D/NR<<N t" jj N I ga"j;.<<'Ijj, ih.'N N I I I'N nu, f<<j\I~<<li)ljWC'ISD~S D<<,*X Sll/NI N~)II N N',j<Nr))D hr IS ll<<t 4~Nh I bf'<>S!"<<">>>NN ji r I>>~L R.AN~'I(II<<O'I y'j g Nj>>~R~P,<<jg f<<t~N$/>>IN't g Q~IN J I*, 4 ui I~R4f~f~ge, 4~I , RD'(('!S(II~a

@ME Carolina Power&Light Company CB 3 IS85 SERIAL: NLS-85-()88 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-000 INTEGRATED LEAKAGE RATE TESTING

Dear Mr.Denton:

Carolina Power 2 Light Company (CP(t(L)will perform Integrated Leakage Rate Testing (ILRT)on the Shearon Harris Nuclear Power Plant approximately two weeks after the completion of Hot Functional Testing (HFT).We request your concurrence to perform a reduced duration peak pressure ILRT to satisfy the requirements of-10 CFR 50, Appendix 3.3ustification for this test is discussed in Bechtel Topical Report BN-TOP-I,"Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Rev.1." The containment atmosphere stabilization criteria of Section 2.3.A of BN-TOP-1 will be used.To determine the duration of the ILRT, the criteria discussed in Section 2.3 of BN-TOP-I will be used with the following exception:

The end of test upper 9596 confidence limit for both the least squares fit calculated leak rate based on Total Time calculations and the least squares fit based on mass-point calculations, plus penalty leakages, shall be less than 0.75 La.To support our current schedule for HFT and ILRT, we request your concurrance with the test method outlined above by 3anuary 15, 1986.If you have any questions concerning this subject or require additional information, please contact me.Yours very truly, SRZ/GAS/crs (3125GAS)S.R.Zi erman Manager Nuclear Licensing Section CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)

Dr.3.Nelson Grace (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)

Wake County Public Library Mr.3.Huang (NRC)Mr.Wells Eddleman Mr.3ohn D.Runkle Dr.Richard D.Wilson Mr.G.O.Bright (ASLB)Dr.3.H.Carpenter (ASLB)Mr.3.L.Kelley (ASLB)Mr.H.A.Cole iio 411 Fayettevilte Street o P.O.Box 1551 o Raleigh, N.C.27602 AD-J.Knight (Itr only)EB (BALLARD)EICSB (ROSA)PSB (OAMMILL)RSB (BERLINGER)